1983: From Land Sharing to Household Ownership
Chapter 259 Today's vigil
"Boss, the iron hoop you mentioned is used to build the steel pipe scaffolding. It is still being built by the county machinery factory overtime. It is estimated that it will be delivered tomorrow."
"The same is true for more than a dozen sets of hoist cranes. They are building molds and will not be able to deliver them until tomorrow."
Zhang De led people to turn around with a large amount of building materials, and immediately ran to report to Wang Qiang.
"Delivery tomorrow? That's fine."
Wang Qiang nodded, "The steel pipe used for permanent scaffolding was cut off by the Bureau of Materials, and the size was correct, right?"
"Boss, don't worry, isn't it just cutting the same type of steel pipe into a uniform length?"
Zhang De said flatly, "How can something like this go wrong?"
He asked again, "Boss, don't you just use bamboo to build the scaffolding? Why spend a lot of money to make a fixed type of steel pipe to build it?"
"Zhang De, your vision is too shallow."
Wang Qiang shook his head and said, "Sharpening knives doesn't cut firewood by mistake. With a little more advanced tools, the construction quality and speed of the project will improve a lot."
"Once you have used a lot of hoist cranes and steel fixed scaffolding, you will understand the huge difference."
"It doesn't cost much anyway, just use something more scientific."
"Boss, thirty iron trolleys are also in the county machinery factory. According to the drawings you gave, they have begun to finalize and build them. As for the mixer, the county secretary Zhao promised to send a few over later."
He reported some situations again, basically reporting everything Wang Qiang had to purchase.
In general, on the list that Wang Qiang handed him, some of the materials will be continuously delivered to the construction site from today onwards by manufacturers and merchants.
Another part of the material will not be delivered until tomorrow.
"Xiaoyu, you drive the excavator, go down to the foundation that has just been dug, and repeatedly roll it for a few laps, and then we can prepare for the concrete pouring of the warehouse's foundation."
All the buildings of the two companies, including sewers, foundations and pillars of various sizes, floors or ceilings, Wang Qiang is prepared to use real and qualified reinforced concrete to pour.
This is naturally to save time and effort, and to maintain high durability.
"Okay, brother."
Wanyu agreed, dragged her sister and ran to the excavator, and quickly climbed to the cab.
After a while, she drove the excavator and slowly drove into the large criss-crossing tunnel that was dug out that morning.
"Crushing the ground, I'm familiar with it!"
She was very excited to drive the excavator, and in the big tunnel that was just enough to accommodate the excavator, she drove repeatedly, neither fast nor slow.
The heavy weight of the excavator crushed the soft soil in the foundation firmly.
This operation was repeated several times, and several large and small circles were spared. Until the crushing of the excavator could no longer see the effect, Wanyu stopped the excavator.
But this is not enough.
Wang Qiang called the company's own construction team, which had just been formed, to pull in a few long water pipes that had just been bought, and irrigated the bottom of the tunnel that had just been repeatedly crushed by the excavator.
Then, he let Wanyu drive the excavator and started a thorough rolling again.
It was not until the bottom of all the tunnels that the rolling had no effect, Wang Qiang asked his sister to drive the excavator and slowly returned to the ground.
The next step is to pour a thick layer of reinforced concrete at the bottom of the foundation tunnel as a whole, and wait until tomorrow to tie the reinforced frame to carry out the overall pouring of the foundation and the concrete independent column.
Since each pouring of reinforced concrete requires a one-time overall pouring, which cannot be interrupted during the period, there are many kinds of materials and equipment to be prepared.
This afternoon, only one overall foundation reinforced concrete bottoming work could be completed.
Except for the preparation of materials, the rest of the work can only be continued after tomorrow's extensive preparations.
Three hundred people worked together, and when Wanyu was in charge of rolling the bottom of the tunnel, she had already tied up the steel frame for laying the bottom of the single foundation.
With the arrival of several mixers allocated by Secretary Zhao, everyone began to work on the batching of concrete.
Another hour passed, and the massive concrete pouring began.
It is always good to say that there are more people and more power.
The construction team of 300 people is already quite large.
When dusk came, the foundation work of several large rows of connected warehouses was finally completed.
It's time to get off work.
As everyone began to disperse in groups of three or five, the security team left a small team behind.
More than a dozen aunties, newly recruited canteen employees of the company, have already helped more than 30 people in this security team prepare dinner.
When the security guards on duty tonight were having dinner, at Wang Qiang's request, several large tents dispatched by Secretary Zhao had been delivered.
After dinner, the security guards, under the command of captain Zhang De, began to set up tents, connect water and electricity, etc.
When night fell, Secretary Zhao personally escorted a truckload of security equipment and distributed it to everyone. The huge construction site, under the illumination of several bright electric lights, returned to peace.
Today on the construction site, there are too many materials and tools left behind, and it is necessary to be on duty.
This can also be regarded as the company's security team, and the three-shift work has officially started, and it is on the right track.
...
Before night fell, Wang Qiang brought his sister and the others back home.
The two girls, Wan Jun and Chen Lin, of course, heard a round of self-bragging about the twin sisters, and they were very envious in their hearts.
Fortunately, there is still one day left, and it will be the two of them and their twin sisters to take turns traveling.
At that time, the proud people will inevitably turn around, and it will be Wan Yu and Wan Ling's turn to envy the two of them.
After having dinner and taking a shower, Wang Qiang said to his sister and the others before entering his master bedroom.
He brought out a set of tools specially used for drawing drawings, and began to conceive the enlarged and extended version of the drawings for Fengyulou.
It's not a problem to always think about this matter in my heart. It is necessary to solve this obsession as soon as possible.
After a period of time, after the construction team is on the right track, the construction of the two companies has become normalized, and there is no need for him to keep an eye on it all the time. It is enough to check the progress and quality problems every morning and evening.
At that time, there will be a lot of free time during the day, and the wind and rain buildings that connect the two sides of the artificial lake will be built.
He remembered the length and width of his artificial lake very clearly.
After all, that was what he dug up with his own hands.
Fortunately, he now has the ability to remember, and his memory is excellent.
Although it has been a few months since the four of my brothers and sisters went to the Wind and Rain Building in Hongyan Village, the memory of the Wind and Rain Building is still vivid in my mind.
With the passage of time, the enhanced version of the Wind and Rain Building design turned into drawings, and Wang Qiang gradually became addicted to it.
Until midnight, Fang Zi was done.
"call……"
He let out a breath, stretched out, and labelled the drawings that had already been drawn, then carefully collected them and put them in a large drawer on the large wooden table.
He got up and went to the bathroom to wash up, then returned to the big wooden bed with withered flowers, ready to rest and sleep.
About ten minutes later, Wang Qiang, who was a little tired, fell asleep.
You'll Also Like
-
Immortal Cultivation Family: Spiritual Bowl
Chapter 640 5 hours ago -
In the Ice Age, I stockpiled billions of supplies
Chapter 1775 5 hours ago -
Kill through American horror, starting from the witches' coven
Chapter 503 5 hours ago -
At the wedding, I severed ties with my entire family!
Chapter 754 5 hours ago -
I'm a policeman, how can you give me a gangster system!
Chapter 234 5 hours ago -
Online game: God-level assassin, I am the shadow!
Chapter 940 5 hours ago -
Rebirth of the Urban Madman
Chapter 4536 5 hours ago -
Ten Days End
Chapter 1360 1 days ago -
Release the Douyin Immortal World version, the Holy Land Patriarch broke the defense
Chapter 429 1 days ago -
Entertainment: Becoming famous overnight starts with not being a bootlicker
Chapter 565 1 days ago