Countercurrent 1982
Chapter 1774 Two Levels
Chapter 1774 Five Levels
After exchanging a few simple greetings at the railway station, Zhang Weiguo drove them directly to the branch factory of Longteng Co., Ltd. in Shanghai.
Longteng Branch is located in Kangqiao Industrial Zone, Pudong, Shanghai. This industrial zone has been planned since 1990. Just last month, it was just planned as a new industrial zone. It is one of the earliest municipal industrial zones in Shanghai, with a planned area of 26.88 square kilometers, and the planned development reserve area is 13.9 square kilometers.Located on the north and south sides of the Pudong section of the outer ring road of Shanghai, it is connected to the Pudong Lujiazui Financial and Trade Zone in the north, and Yangshan International Deep-water Port in the south. The surrounding areas have developed commerce and trade.
Kangqiao Industrial Zone is divided into four sections: Built-up Zone, Electronic Information Industry Zone, International Medical Park and Expansion Zone.
The built-up area is about 8 square kilometers, located between Pudong New Area and Zhoupu Town, of which the industrial built-up area is about 4 square kilometers, forming three major industries of electronic appliances, auto parts and new building materials.
Longteng Co., Ltd. is located in the north of Kangqiao Industrial Zone. It currently covers an area of 144 mu. It has just completed the construction of 4 large factories. In addition, there is a technology research and development center located in the center of Kangqiao Industrial Zone. Many domestic It is also the R&D center of foreign companies, and the Shanghai R&D branch of Tianyin Group is also located here, focusing on the R&D of auto parts, especially the localization of the gearbox for domestic Santana cars.
Duan Yun successively injected 8 million yuan into the Shanghai branch of Longteng Co., Ltd., of which no industrial land was paid, and all of it was provided free of charge by the SH municipal government. Yang negotiated good things.
To the east of the Kangqiao Industrial Zone is the electronic information industry zone of the Kangqiao Industrial Zone. Through negotiations with Ruiyang, Duan Yun also transferred his two video recorder production lines here. The factory covers an area of 30 mu, with a total investment of 1, About 500 million yuan.
At present, although Tianyin Group has transferred the video recorder factory in Shenzhen to SEG Group, it still retains a part of the production capacity of video recorders. Although the annual revenue is not much, the annual profit is only more than 2000 million yuan. But for Duan Yun, his main purpose of putting the video recorder production line in Shanghai is not to make money, but to occupy the land in the Shanghai Development Zone first, and "occupy pits" in Shanghai for the future layout of his electronics industry.
"In February this year, the factory building here was fully completed, and all the equipment of Longteng Company in Shenzhen has been shipped here, including 2 high-precision CNC machining machines, which have been debugged so far." Entered Longteng Co., Ltd. After the factory area, Zhang Weiguo began to introduce the current situation of the factory area to Duan Yun, only to hear him continue: "The first batch of imported Volvo production equipment has entered Shanghai Customs last month, accompanied by two Swedish engineers, At present, the two people have been settled, and it will take about two months to complete the commissioning of related equipment..."
"Thank you for your hard work." Duan Yun said.
"It's not hard work, this is what I should do." Zhang Weiguo smiled shyly, and then said: "The hardest thing to say is the experts in the R&D center. I won't talk about the engineers in our company. Those more than 10 old experts are also quite able to endure hardships, with their help, we have completed the production of the first batch of samples of Santana car gearboxes, which have been sent to Germany and are currently being tested."
"Are you sure you can pass the test?" Duan Yun asked.
"According to those Soviet experts, they also looked at the standard indicators set by the Germans. You don't think it's a big problem, because the gearboxes we send to Germany for inspection are basically handmade by old technicians. There is absolutely no problem with the accuracy of five-axis CNC machine tools." Zhang Weiguo paused, and then said: "What we have not broken through in China before is the durability of the key gears of the Santana car gearbox. Thanks to the help of Soviet material experts, this Only then did this technical bottleneck be solved..."
"That's great." Duan Yun nodded in satisfaction.
It is not an easy task to become a supporting manufacturer of Santana cars, and it needs to pass many checkpoints.
The first is the entry gate. According to the fixed-point plan, the Chinese and German parties sent people to conduct on-the-spot investigations to understand the actual technical level and technological capabilities of the company, especially the technical transformation capabilities required for supporting localization, and the specific ideas and measures of the company's leaders for localization.
In this regard, I have never encountered any obstacles, because he was invited by the SH city government to participate in this Santana car supporting consortium. Tianyin Group is a very powerful technology company in China, and its technical level is unmatched. Doubtful.
The second level is the first sample level.After passing the first test, Shanghai Volkswagen will explain the technical requirements, quality standards and process drawings of the supporting localized parts to the undertaking company, and help answer related questions.
Enterprises must hand over the first sample within the specified time limit. The first sample can be made by hand, because it is very expensive to open a mold. After making it, it is only to see whether the product’s dimensions meet the standards.
After Longteng Co., Ltd. set up a factory in Shanghai, it quickly obtained the technical drawings and various technical materials of the parts of the Santana car. Some technical details, especially the parameters and process requirements of the gearbox, paved the way for the next sample production.
After the samples are made, the third test will begin, which is the tooling sample test.At this time, the mold must be opened, and the sample must be processed and manufactured on qualified tooling and equipment.After passing the preliminary inspection, the test shall be carried out according to the specifications of the German Volkswagen.
In addition to general tests, durability fatigue tests are also required, and some road tests of 3 to 6 kilometers are required.This step is the key to the approval process, and it is also the most difficult and time-consuming one.
At present, the gearbox samples of Longteng Co., Ltd. have been sent to Germany, and it is estimated that they will undergo a test for a period of several months. Once the test is passed, the next level of assessment will begin.
The next step is the evaluation of the quality assurance system.It is necessary to conduct a comprehensive assessment of the quality assurance means and capabilities of the enterprise, and to rectify existing problems within a time limit.
The last is bulk supply.The main thing is to process and assemble the supporting batch products directly on the Shanghai Volkswagen production line, and only when they reach the level of the original German parts can they pass.
After passing all the checkpoints, Longteng Co., Ltd. can become the official supporting company of Shanghai Volkswagen.
I have a terrible headache, I only have one note to forgive me.
(End of this chapter)
After exchanging a few simple greetings at the railway station, Zhang Weiguo drove them directly to the branch factory of Longteng Co., Ltd. in Shanghai.
Longteng Branch is located in Kangqiao Industrial Zone, Pudong, Shanghai. This industrial zone has been planned since 1990. Just last month, it was just planned as a new industrial zone. It is one of the earliest municipal industrial zones in Shanghai, with a planned area of 26.88 square kilometers, and the planned development reserve area is 13.9 square kilometers.Located on the north and south sides of the Pudong section of the outer ring road of Shanghai, it is connected to the Pudong Lujiazui Financial and Trade Zone in the north, and Yangshan International Deep-water Port in the south. The surrounding areas have developed commerce and trade.
Kangqiao Industrial Zone is divided into four sections: Built-up Zone, Electronic Information Industry Zone, International Medical Park and Expansion Zone.
The built-up area is about 8 square kilometers, located between Pudong New Area and Zhoupu Town, of which the industrial built-up area is about 4 square kilometers, forming three major industries of electronic appliances, auto parts and new building materials.
Longteng Co., Ltd. is located in the north of Kangqiao Industrial Zone. It currently covers an area of 144 mu. It has just completed the construction of 4 large factories. In addition, there is a technology research and development center located in the center of Kangqiao Industrial Zone. Many domestic It is also the R&D center of foreign companies, and the Shanghai R&D branch of Tianyin Group is also located here, focusing on the R&D of auto parts, especially the localization of the gearbox for domestic Santana cars.
Duan Yun successively injected 8 million yuan into the Shanghai branch of Longteng Co., Ltd., of which no industrial land was paid, and all of it was provided free of charge by the SH municipal government. Yang negotiated good things.
To the east of the Kangqiao Industrial Zone is the electronic information industry zone of the Kangqiao Industrial Zone. Through negotiations with Ruiyang, Duan Yun also transferred his two video recorder production lines here. The factory covers an area of 30 mu, with a total investment of 1, About 500 million yuan.
At present, although Tianyin Group has transferred the video recorder factory in Shenzhen to SEG Group, it still retains a part of the production capacity of video recorders. Although the annual revenue is not much, the annual profit is only more than 2000 million yuan. But for Duan Yun, his main purpose of putting the video recorder production line in Shanghai is not to make money, but to occupy the land in the Shanghai Development Zone first, and "occupy pits" in Shanghai for the future layout of his electronics industry.
"In February this year, the factory building here was fully completed, and all the equipment of Longteng Company in Shenzhen has been shipped here, including 2 high-precision CNC machining machines, which have been debugged so far." Entered Longteng Co., Ltd. After the factory area, Zhang Weiguo began to introduce the current situation of the factory area to Duan Yun, only to hear him continue: "The first batch of imported Volvo production equipment has entered Shanghai Customs last month, accompanied by two Swedish engineers, At present, the two people have been settled, and it will take about two months to complete the commissioning of related equipment..."
"Thank you for your hard work." Duan Yun said.
"It's not hard work, this is what I should do." Zhang Weiguo smiled shyly, and then said: "The hardest thing to say is the experts in the R&D center. I won't talk about the engineers in our company. Those more than 10 old experts are also quite able to endure hardships, with their help, we have completed the production of the first batch of samples of Santana car gearboxes, which have been sent to Germany and are currently being tested."
"Are you sure you can pass the test?" Duan Yun asked.
"According to those Soviet experts, they also looked at the standard indicators set by the Germans. You don't think it's a big problem, because the gearboxes we send to Germany for inspection are basically handmade by old technicians. There is absolutely no problem with the accuracy of five-axis CNC machine tools." Zhang Weiguo paused, and then said: "What we have not broken through in China before is the durability of the key gears of the Santana car gearbox. Thanks to the help of Soviet material experts, this Only then did this technical bottleneck be solved..."
"That's great." Duan Yun nodded in satisfaction.
It is not an easy task to become a supporting manufacturer of Santana cars, and it needs to pass many checkpoints.
The first is the entry gate. According to the fixed-point plan, the Chinese and German parties sent people to conduct on-the-spot investigations to understand the actual technical level and technological capabilities of the company, especially the technical transformation capabilities required for supporting localization, and the specific ideas and measures of the company's leaders for localization.
In this regard, I have never encountered any obstacles, because he was invited by the SH city government to participate in this Santana car supporting consortium. Tianyin Group is a very powerful technology company in China, and its technical level is unmatched. Doubtful.
The second level is the first sample level.After passing the first test, Shanghai Volkswagen will explain the technical requirements, quality standards and process drawings of the supporting localized parts to the undertaking company, and help answer related questions.
Enterprises must hand over the first sample within the specified time limit. The first sample can be made by hand, because it is very expensive to open a mold. After making it, it is only to see whether the product’s dimensions meet the standards.
After Longteng Co., Ltd. set up a factory in Shanghai, it quickly obtained the technical drawings and various technical materials of the parts of the Santana car. Some technical details, especially the parameters and process requirements of the gearbox, paved the way for the next sample production.
After the samples are made, the third test will begin, which is the tooling sample test.At this time, the mold must be opened, and the sample must be processed and manufactured on qualified tooling and equipment.After passing the preliminary inspection, the test shall be carried out according to the specifications of the German Volkswagen.
In addition to general tests, durability fatigue tests are also required, and some road tests of 3 to 6 kilometers are required.This step is the key to the approval process, and it is also the most difficult and time-consuming one.
At present, the gearbox samples of Longteng Co., Ltd. have been sent to Germany, and it is estimated that they will undergo a test for a period of several months. Once the test is passed, the next level of assessment will begin.
The next step is the evaluation of the quality assurance system.It is necessary to conduct a comprehensive assessment of the quality assurance means and capabilities of the enterprise, and to rectify existing problems within a time limit.
The last is bulk supply.The main thing is to process and assemble the supporting batch products directly on the Shanghai Volkswagen production line, and only when they reach the level of the original German parts can they pass.
After passing all the checkpoints, Longteng Co., Ltd. can become the official supporting company of Shanghai Volkswagen.
I have a terrible headache, I only have one note to forgive me.
(End of this chapter)
You'll Also Like
-
Flowers, Swords and France
Chapter 1013 10 hours ago -
Immortal Cultivation Family: Immortality Begins from Binding to the Family
Chapter 742 10 hours ago -
The extraordinary life of a certain American comic
Chapter 200 1 days ago -
American comics: Starting from a copycat arms dealer
Chapter 231 1 days ago -
From the waste of spiritual roots to the practice of asking the devil
Chapter 380 1 days ago -
Trickster Hunter
Chapter 363 1 days ago -
Expedition to Europe
Chapter 1080 1 days ago -
The giant corporations that started in Night City
Chapter 385 1 days ago -
The apocalypse is weird: I am the number one containment object, what's wrong with being a litt
Chapter 612 1 days ago -
Time and space transaction: Exchange food for the elf princess at the beginning
Chapter 507 1 days ago