Great Power Reclamation

Chapter 504 Equipment Installation

Chapter 504 Equipment Installation
Yang Geyong almost cried, what a high management fee!I really hope this kind of management fee can be maintained for a long time.

"How much are you going to replace this truck with?" Yang Geyong asked. He really didn't know the price of the truck, so it was up to Akeli to decide.

Akeli rolled his eyes and asked, "Will you still sell these rails in the future?"

Yang Geyong nodded: "I traded your car just to pull the rails, and one car is definitely not enough. I want as much as you have!"

Akeli smiled. Such a second-hand car is the price of cabbage on their side.As long as Yang Geyong is willing to ask for scrap iron, he is willing to give this car away for nothing.So he glanced at Yang Geyong's stall, and then drew a circle with his hand:

"These things belong to me, and you take the car. But. But let's make an agreement, you will give priority to buying the scrap iron I brought in at today's price."

Yang Geyong stretched out his hand and shook him: "It's a deal!"

The goods on Yang Geyong's stall did not exceed 1000 yuan.That's it for a GAZ truck.After loading all the other goods in exchange, Yang Geyong drove away.

When they arrived in Shihezi, the two girls were very surprised to see him driving back a big truck.Quickly ask what's going on?They were also very happy. No fool would be happy to buy a truck for 1000 yuan.

But seeing the tatters on Yang Geyong's car, Zhao Linger asked in surprise, "Why are you pulling these things?"

Yang Geyong didn't intend to tell her what he was going to do. Zhao Linger's personality was a bit strong, and her father's status was there. He didn't intend to let Zhao Linger get involved in this matter.Just said a few words vaguely.And Zhao Ling'er didn't care about these rags.

The infrastructure company belongs to the small company in one group, and cannot be compared with the agricultural company and animal husbandry company.Larger agriculture and the total population add up to almost a thousand.The total population of the infrastructure company is now just over 300.This is also one of the main reasons for the shortage of labor force.

Regarding this matter, Ma Quanyi and Ye Wancheng had some headaches. The two newly built factories required five or sixty people no matter how few people were employed.But if all the men from the infrastructure company were drawn to these two factories, it would be fine in winter, but after spring the prefabricated panel factory would have no labor.Such a good business, no one is willing to give up.

However, the winter in northern Xinjiang is relatively long, so you can ignore this for now.However, the garment factory’s move to a new factory building was shelved, because the mulch factory needed a relatively large factory building, so the new factory building could only be given up first.For this reason, Liu Sannv was very unhappy, but there was no good way.

Ma Quanyi could only try his best to appease the hero of the infrastructure company.There is no way, now the garment factory supports half the sky of the infrastructure company.

What Ma Quanyi urgently needs to solve now is the problem of the factory building of the steel factory.Although this steel factory is currently just a simple steel ingot factory, which heats and purifies scrap steel, it can't work in the open air, right?
After several deliberations, it was decided to lay the foundation first on the river beach next to the hydropower station.Before it freezes, pour the concrete first.Mainly ground beams, ring beams and columns.After these things are watered, it is better to build a house or build a shed.

Ma Quanyi sent a tractor to the regiment headquarters to borrow a few mixers.At that time, there were no large mixing stations, but only those small mixers.If five or six units work together, they can fully keep up with the use.

Reinforcement carpentry is readily available.After opening the slot.Construction started vigorously.In order to support the development of the infrastructure company, Liu Qinghua also sent the construction company of the regiment headquarters over.This time, the speed is even faster.

Yang Geyong hired all three trucks in the regiment and began to pull waste into the company.At that time, there was no overload check, and a trip of four vehicles was [-] tons.By the time it snowed, more than [-] tons of waste had already been piled up on the river beach.

At this time, the equipment sent from Germany was also in place.Because they are not high-tech equipment, only two engineers were sent there to guide the installation.

Because of the lack of personnel, Ma Quanyi had to transfer all the maids from the garment factory to learn how to install and use the equipment.Of course, this refers to the plastic film factory, and the steel factory naturally has boys.Wei Yuxiang was also pulled from the hydropower station and was mainly responsible for the commissioning of the steel plant.

What was unexpected this time was the equipment of the steel plant.It's small and uses electricity.Ma Quanyi looked at it for a long time and couldn't believe that this little thing could produce [-] tons of molten steel every day.

He was just dumbfounded during the test drive.Sections of steel scrap entered the intermediate frequency furnace along the conveyor belt, and turned into flowing molten steel in a blink of an eye. After simple purification, it was poured into the ink mould.The steel ingots turned from white to red, then dark red, and finally turned into blue steel ingots. Just such a few simple processes made the eyes of the men of the infrastructure company moist.

The commissioning of the mulch plant is more complicated.Mainly those two blow molding machines.Ma Rong and Yu Lan are currently the most highly educated people in the infrastructure company. They are responsible for learning installation and use from German engineers.

The engineer at the steel plant is a middle-aged man in his 40s, rigid and serious.It was very uncomfortable dealing with him.But Wei Yuxiang didn't care about his attitude at all.No matter how he rants, Wei Yuxiang always does his job well and orderly.

After a long time, this foreigner was finally trained by Wei Yuxiang's studious and meticulous.Under the translation of Luke, Wei Yuxiang was told all the main points of the maintenance and debugging of this equipment in a little bit.

The Germans are better than the Japanese in this regard, and basically all the equipment and technology sold will be taught.When the Japanese sold equipment, they didn't teach these things very much.Because they end up making more money in after-sales and maintenance than selling equipment.

The engineer at the mulch factory is a woman and very young.The most amazing thing is that she also understands some Chinese, although often the words are not expressive.But the more we communicate, the more accurate it will become gradually.

She is very nice to people and more enthusiastic.Lianli vacated a dormitory for her.Ma Rong and Yu Lan moved in to take care of her daily life.

At the beginning, what this foreign girl was most uncomfortable with was not having a bathroom.The public toilets in the company are just a few large wooden boards directly above the cesspit.When she first entered, she retched for a long time after coming out.

However, the biological adaptability of human beings is the strongest.In particular, Ye Yuze paid the engineers for this installation and commissioning ten times as much as they did in China.Under the temptation of a lot of money, no matter how difficult the environment is, it doesn't matter.

Because of the simple equipment in the steel plant, the engineer left within a month.And this female engineer waited for three months before leaving the visa.Before leaving, I was still reluctant to part with Ma Rong.

(End of this chapter)

Tap the screen to use advanced tools Tip: You can use left and right keyboard keys to browse between chapters.

You'll Also Like