Rebirth starts from Xianyu
Chapter 26 Mid-Year Summary
Chapter 26 Mid-Year Summary
A blink of an eye.
It's May 5th.
It's the end of the month.
When it's time to get off work.
Chen Suocai came out slowly and organized a meeting for everyone.
Lin Ying hated this style of work the most.
There are no meetings in the morning, no meetings at noon, and only in the afternoon when we are about to leave work.
Moreover, director Chen is actually very long-winded in meetings, and he can talk for several hours, so he insists on delaying everyone's time to get off work.
Although everyone has some grievances.
But I dare not refuse.
After all, I have to rely on this salary to support my family.
Quickly move the stools, and everyone takes their places.
The master craftsmen were also familiar with Chen Suo, so they arranged the melons and fruits, brewed the strong tea, put the chairs down to the lowest position and sat down, ready for a protracted battle.
After Director Chen came out.
Ask Lin Ying to help turn on the computer for projection.
no way.
College students, just do such technical work, just press the computer switch, open a PPT file and the job is over.
Then Director Chen pointed at the PPT file on the computer.
Rory talked a lot.
This PPT is well-made, with rich pictures and texts, vivid images, and good readability. It is very suitable for this group of old and dim-sighted masters. The main content is to summarize the "brilliant" achievements of the Baru Waterworks Center in the past six months.
To ask who wrote it.
Naturally, it is Lin Ying, a well-known talent.
no way.
The last time the manuscript became famous in a battle, Chen Suo regarded himself as the queen's writer. Fortunately, the network speed in the institute is good, and every time Lin Ying goes online, he can search Baidu very quickly.
Strictly speaking, this PPT is not written by myself.
It was written by Zhang Qingxue.
Lin Ying is not stupid, wasting so much time to write such a meaningless thing, when the director ordered him to do this kind of thing, Lin Ying immediately asked Zhang Qingxue to ask for a mid-year copy of their Eastern Suburb Institute summary report.
Then give it a makeover.
I added the work of my own water supply center to form a work report of my own Baru Institute.
I believe that all the smart friends here are doing this.
But embarrassingly so.
When you change it yourself.
Carelessness did not change everything.
Didn't check after writing.
So there are still two awkward words about the Eastern Suburbs in this PPT.
Every time Chen Suo reads this.
The expressions on his face were obviously ugly, and his brows were tightly wrinkled.
He looked up at Lin Ying.
It means your mother cheated on me?
Lin Zheng was a little embarrassed.
Hurry up and drink tea.
Pretend you didn't see anything! !
Seeing this situation, our Squad Leader He happily glanced at Lin Ying!
The corner of his mouth tugged, and his heart blossomed with joy!
This year's summary has always been done by him before.
This time Chen Suo handed it over to Lin Ying.
He was also depressed for a while.
I thought I was going to lose Chen Suo's favor.
But seeing Lin Ying doing so poorly, he was relieved.
This job will definitely come back to him in the future.
some people.
Born to be a cheap bone.
Although he complains about the cumbersome work all day long and wants to leave the work to others, he also wants to firmly hold on to the gold mine in his hands.
Don't let others take it away.
Actually he didn't understand.
Lin Ye didn't want to grab it at all, and he didn't want to stay in this water supply station at all.
Everyone drank tea and listened quietly to the director Lin Ying's mid-year report with a heavy heart. Why is it so heavy, because there is also a water loss rate indicator in this report.
The water loss rate index of Baru Institute.
Worst in the whole company! ! !
What is the worst concept in the whole company.
That is, there are a total of 20 water supply centers in the company, and Ballu's is ranked in the bottom 20. There is no way to account for the several large-scale water pipe ruptures that have occurred in Ballu this year.
The director put down the mouse in his hand and looked at everyone with murderous eyes.
After half a day, Youyou said:
"Starting with Li Hanguang, each of you will report on the situation in the area you are in charge of."
Li Hanguang didn't expect the director to cue him suddenly, he was not prepared at all, and stood up reluctantly.
His face was blushing, and he looked at the director and asked, "What are you talking about..."
Yes, he almost fell asleep just now, and he wasn't listening at all.
Of course I don't know what to say!
Someone sprayed tea!
"Tell me about the maintenance of the water pipes and pumps in Wutong District and what happened to the water meter reading this month, and why the water loss rate remains high."
The director reminded impatiently.
The high water loss rate means that the water is wasted more. There are many reasons for this:
The water supply radius is small, the distance is too long, the water pipe is aging, the pipe network is infiltrated, water is stolen and leaked, and the water meter is lost
The most ideal state.
Of course, it is how much water the company supplies, and then how much water fees can be earned.
For example, the company supplies 100 million tons of water to Baru, so naturally it wants to earn money for such a large amount of water.
But this is impossible.
Baga City is located in a mountainous area, with a large water supply radius, scattered areas, and a small pipe network density, which can return 60% of the income.
It's all pretty good.
Therefore, the above departments will regard this water loss rate as the first indicator for water supply assessment. The lower the water loss rate, the better the maintenance of the water pipes, the less water loss, and the higher the company's income.
Indirectly, it can be deduced that the master of this institute is not lazy, patrols all day long, and does not steal water or leak water.
"Cough cough."
Master Li took a sip of tea, looked up and began to recall what he had done for half a year.
They are all stalwart figures who fish at get off work and play mahjong after work.
"Well, in the first half of the year, I replaced 8 smart water meters for residents, replaced 300 water pumps, expanded 3 sets of [-]-ton water tanks, and ran over three dogs and two chickens in the crowd by driving. It's gone."
Lin Ying almost laughed out loud after hearing this.
It's too real that Nima ran over the chicken of the people's house.
This is actually unavoidable.
They go to drive motorcycles to go door-to-door to read meters, and sometimes they really run over poultry or something if they are not careful.
"Okay, next one."
Chen Suo also knew that these old masters had nothing to say, so he asked him to sit down.
Because other people have made some preparations, they speak in a decent way, but they are all the same. How many households have completed the replacement of smart water meters and how many water pumps have been replaced?
After the master finished speaking, He Tuzi also made a report here, as long as it was to report some expenses in the first half of the year, including everyone's food, and various car oil subsidies.
In the end, of course, I also flattered, bragging that under the leadership of Director Chen, we still made a lot of achievements.
In the end, Director Chen also summed it up, it must be everyone's work, after all, the entire Baga Water Supply Company where Balu Water Supply is located now has a certain reputation.
Especially in the area of publicity, the results are excellent.
In the past six months, the Baru office was the water supply office that published the most newsletters in the company.
Of course, this is inseparable from Lin Ying's credit. Lin Ying actually didn't want to write so much, but because Chen Suo has tasted the sweetness, no matter what he does in the future, such as today's meeting.
Lin Zheng was also required to write a newsletter and send it to the company's portal.
Lin Ying was repeatedly complained by colleagues: "What you are doing is transparent now, we all know shit."
Finally the boss said
"There is one more thing, that is, the mid-year appraisal is now being held, and each institute can have two outstanding places, and you all can recommend them."
When everyone heard it, they immediately regained some energy.
This is excellent.
For the master craftsman, that is a small bonus.
For a young man like Lin Ying, that is an honor.
Everyone naturally wants it.
"There are not many places, there are only two. How about this, you choose one of the eight meter-reading masters, and then Lin Zheng, Xu Chenggong and He Guanghui recommend one of the three of you. You can discuss it yourself. After a while, Lin Zheng will take you Give me the list."
Chen finished speaking and left.
This guy.
very smart.
He doesn't participate in such things because he doesn't want to be such a villain.
Anyway, you choose.
In the end he didn't care.
The master is still refreshing.
Simple and crude.
Draw lots directly to decide, and leave the fate to God. Li Hanguang, who was hesitating just now, was favored by God.
got this spot.
The others sighed.
Left in a state of disenchantment.
Only Lin Zheng, Xu Chenggong, and our squad leader He Tuzi were left on the field.
look at each other.
Nobody said anything!
(End of this chapter)
A blink of an eye.
It's May 5th.
It's the end of the month.
When it's time to get off work.
Chen Suocai came out slowly and organized a meeting for everyone.
Lin Ying hated this style of work the most.
There are no meetings in the morning, no meetings at noon, and only in the afternoon when we are about to leave work.
Moreover, director Chen is actually very long-winded in meetings, and he can talk for several hours, so he insists on delaying everyone's time to get off work.
Although everyone has some grievances.
But I dare not refuse.
After all, I have to rely on this salary to support my family.
Quickly move the stools, and everyone takes their places.
The master craftsmen were also familiar with Chen Suo, so they arranged the melons and fruits, brewed the strong tea, put the chairs down to the lowest position and sat down, ready for a protracted battle.
After Director Chen came out.
Ask Lin Ying to help turn on the computer for projection.
no way.
College students, just do such technical work, just press the computer switch, open a PPT file and the job is over.
Then Director Chen pointed at the PPT file on the computer.
Rory talked a lot.
This PPT is well-made, with rich pictures and texts, vivid images, and good readability. It is very suitable for this group of old and dim-sighted masters. The main content is to summarize the "brilliant" achievements of the Baru Waterworks Center in the past six months.
To ask who wrote it.
Naturally, it is Lin Ying, a well-known talent.
no way.
The last time the manuscript became famous in a battle, Chen Suo regarded himself as the queen's writer. Fortunately, the network speed in the institute is good, and every time Lin Ying goes online, he can search Baidu very quickly.
Strictly speaking, this PPT is not written by myself.
It was written by Zhang Qingxue.
Lin Ying is not stupid, wasting so much time to write such a meaningless thing, when the director ordered him to do this kind of thing, Lin Ying immediately asked Zhang Qingxue to ask for a mid-year copy of their Eastern Suburb Institute summary report.
Then give it a makeover.
I added the work of my own water supply center to form a work report of my own Baru Institute.
I believe that all the smart friends here are doing this.
But embarrassingly so.
When you change it yourself.
Carelessness did not change everything.
Didn't check after writing.
So there are still two awkward words about the Eastern Suburbs in this PPT.
Every time Chen Suo reads this.
The expressions on his face were obviously ugly, and his brows were tightly wrinkled.
He looked up at Lin Ying.
It means your mother cheated on me?
Lin Zheng was a little embarrassed.
Hurry up and drink tea.
Pretend you didn't see anything! !
Seeing this situation, our Squad Leader He happily glanced at Lin Ying!
The corner of his mouth tugged, and his heart blossomed with joy!
This year's summary has always been done by him before.
This time Chen Suo handed it over to Lin Ying.
He was also depressed for a while.
I thought I was going to lose Chen Suo's favor.
But seeing Lin Ying doing so poorly, he was relieved.
This job will definitely come back to him in the future.
some people.
Born to be a cheap bone.
Although he complains about the cumbersome work all day long and wants to leave the work to others, he also wants to firmly hold on to the gold mine in his hands.
Don't let others take it away.
Actually he didn't understand.
Lin Ye didn't want to grab it at all, and he didn't want to stay in this water supply station at all.
Everyone drank tea and listened quietly to the director Lin Ying's mid-year report with a heavy heart. Why is it so heavy, because there is also a water loss rate indicator in this report.
The water loss rate index of Baru Institute.
Worst in the whole company! ! !
What is the worst concept in the whole company.
That is, there are a total of 20 water supply centers in the company, and Ballu's is ranked in the bottom 20. There is no way to account for the several large-scale water pipe ruptures that have occurred in Ballu this year.
The director put down the mouse in his hand and looked at everyone with murderous eyes.
After half a day, Youyou said:
"Starting with Li Hanguang, each of you will report on the situation in the area you are in charge of."
Li Hanguang didn't expect the director to cue him suddenly, he was not prepared at all, and stood up reluctantly.
His face was blushing, and he looked at the director and asked, "What are you talking about..."
Yes, he almost fell asleep just now, and he wasn't listening at all.
Of course I don't know what to say!
Someone sprayed tea!
"Tell me about the maintenance of the water pipes and pumps in Wutong District and what happened to the water meter reading this month, and why the water loss rate remains high."
The director reminded impatiently.
The high water loss rate means that the water is wasted more. There are many reasons for this:
The water supply radius is small, the distance is too long, the water pipe is aging, the pipe network is infiltrated, water is stolen and leaked, and the water meter is lost
The most ideal state.
Of course, it is how much water the company supplies, and then how much water fees can be earned.
For example, the company supplies 100 million tons of water to Baru, so naturally it wants to earn money for such a large amount of water.
But this is impossible.
Baga City is located in a mountainous area, with a large water supply radius, scattered areas, and a small pipe network density, which can return 60% of the income.
It's all pretty good.
Therefore, the above departments will regard this water loss rate as the first indicator for water supply assessment. The lower the water loss rate, the better the maintenance of the water pipes, the less water loss, and the higher the company's income.
Indirectly, it can be deduced that the master of this institute is not lazy, patrols all day long, and does not steal water or leak water.
"Cough cough."
Master Li took a sip of tea, looked up and began to recall what he had done for half a year.
They are all stalwart figures who fish at get off work and play mahjong after work.
"Well, in the first half of the year, I replaced 8 smart water meters for residents, replaced 300 water pumps, expanded 3 sets of [-]-ton water tanks, and ran over three dogs and two chickens in the crowd by driving. It's gone."
Lin Ying almost laughed out loud after hearing this.
It's too real that Nima ran over the chicken of the people's house.
This is actually unavoidable.
They go to drive motorcycles to go door-to-door to read meters, and sometimes they really run over poultry or something if they are not careful.
"Okay, next one."
Chen Suo also knew that these old masters had nothing to say, so he asked him to sit down.
Because other people have made some preparations, they speak in a decent way, but they are all the same. How many households have completed the replacement of smart water meters and how many water pumps have been replaced?
After the master finished speaking, He Tuzi also made a report here, as long as it was to report some expenses in the first half of the year, including everyone's food, and various car oil subsidies.
In the end, of course, I also flattered, bragging that under the leadership of Director Chen, we still made a lot of achievements.
In the end, Director Chen also summed it up, it must be everyone's work, after all, the entire Baga Water Supply Company where Balu Water Supply is located now has a certain reputation.
Especially in the area of publicity, the results are excellent.
In the past six months, the Baru office was the water supply office that published the most newsletters in the company.
Of course, this is inseparable from Lin Ying's credit. Lin Ying actually didn't want to write so much, but because Chen Suo has tasted the sweetness, no matter what he does in the future, such as today's meeting.
Lin Zheng was also required to write a newsletter and send it to the company's portal.
Lin Ying was repeatedly complained by colleagues: "What you are doing is transparent now, we all know shit."
Finally the boss said
"There is one more thing, that is, the mid-year appraisal is now being held, and each institute can have two outstanding places, and you all can recommend them."
When everyone heard it, they immediately regained some energy.
This is excellent.
For the master craftsman, that is a small bonus.
For a young man like Lin Ying, that is an honor.
Everyone naturally wants it.
"There are not many places, there are only two. How about this, you choose one of the eight meter-reading masters, and then Lin Zheng, Xu Chenggong and He Guanghui recommend one of the three of you. You can discuss it yourself. After a while, Lin Zheng will take you Give me the list."
Chen finished speaking and left.
This guy.
very smart.
He doesn't participate in such things because he doesn't want to be such a villain.
Anyway, you choose.
In the end he didn't care.
The master is still refreshing.
Simple and crude.
Draw lots directly to decide, and leave the fate to God. Li Hanguang, who was hesitating just now, was favored by God.
got this spot.
The others sighed.
Left in a state of disenchantment.
Only Lin Zheng, Xu Chenggong, and our squad leader He Tuzi were left on the field.
look at each other.
Nobody said anything!
(End of this chapter)
You'll Also Like
-
I'm a priest, it's reasonable for me to have a little more health and healing.
Chapter 383 1 hours ago -
Honghuang: Wu clan soldiers, plundering entries begin to rise
Chapter 125 1 hours ago -
This pirate is actually a sixth-rate
Chapter 170 1 hours ago -
When I Woke Up, I Became a Top Boss
Chapter 472 12 hours ago -
Six Years After the Disaster, I Saved My Farm by Growing Bean Sprouts.
Chapter 424 1 days ago -
Me! Cleaner!
Chapter 864 1 days ago -
Plunder life and carve out an invincible path
Chapter 413 3 days ago -
Star Dome Railway: I am developing a Star Dome Railway mobile game in my company
Chapter 333 3 days ago -
Unlimited learning of spiritual powers, I will suppress the end of the world
Chapter 214 3 days ago -
I'm shooting anime in another world
Chapter 324 3 days ago