Rebirth starts from Xianyu

Chapter 514 Typical Tofu Project

Chapter 514 Typical Tofu Project
Went to Yilai this Beigang water supply station.

Seeing such a luxurious and dangerous office building, Lin Ying felt really incredible!Laughing and chatting with some employees about some scandals in the company, Lin Ying felt ashamed again.

There is a sense of shamelessness.

Really.

some people.

Does your grandma have no breasts? It's really ugly to eat.

There are too many broken things every day, although this dangerous building incident does not seem to be a big deal.

But if it is spread out, it will be a big joke in the world, and the Ai'er family will become a laughing stock and lose all credibility.

And in this case, the hidden danger is very great.

There haven't been any major geological disasters yet. If a slight earthquake or typhoon really blows down the entire building and buries a few people, then the Ai'er family will really become sinners through the ages.

Return from Bay Hill Water Station.

Lin Ying didn't say a word in the car, with a gloomy and handsome face. Liang Sijing, who was sitting next to Lin Ying, also felt very depressed. She wanted to say something to make Lin Ying happy, but she couldn't think of anything, so she could only stare at him. Lin Ying had a perfect side profile, looking nympho.

If it was Sister Hua, Lin Ying would definitely embrace her big breasts.

Pity.

I can't find that feeling of suffocation anymore.

"Sijing, which two companies are in charge of the construction and renovation of the building of the water supply center. You will ask their leaders to come to our office for a meeting tomorrow."

"Okay, Mr. Lin." Liang Sijing immediately took out a notebook and wrote down Lin Ying's confession. If she didn't have enough brains, she used a pen to make up for it. This is also the saving grace of this woman, Liang Sijing.

"In the afternoon, call the directors of each department to come to my office and have a brief meeting."

"Okay." Liang Sijing also wrote it down.

At three o'clock in the afternoon, the directors of the eight departments came to Lin Ying's office.

Lin Ying didn't pretend to be aggressive this time, and looked up at everyone, and asked seriously: "Which one was responsible for the project of the office building of the Beigang Water Supply Station?"

This matter can't be left as it is. To come up with such a tofu project, some people have to suffer a little bit, otherwise they will really treat the company as their own home and dare to stretch out their hands.

"This! Mr. Lin, generally speaking, our marketing department is responsible for drafting new project declarations, but the specific implementation office is responsible." Director Guan replied, and everyone looked at Liang Sijing.

Liang Sijing was a little flustered: "I'm not very clear about this matter. Director Zheng was in charge at the beginning, but for this kind of project, our office is responsible for the first review, and Mr. Deng needs a second review. The director of the water supply center is the main one, and our departments are all supplementary."

Liang Sijing explained, her pretty nose furrowed, as if feeling a bad atmosphere.

Lin Ying was a little surprised to hear that so many people were involved, and with so many people checking in, it was impossible for a project to be done well, and this project had such a big loophole?

Is it a moral decline or a lack of humanity?

But when he thought of Zheng Huagang and Deng Qifa, Lin Ying was not surprised at all.

This matter is probably another mess made by the two of them.

"Which unit did the appraisal of the dangerous building this time, do you have reliable qualifications? Don't make any oolong incidents." Lin Ying must ensure the authority of this report.

"It's Pattern Forest Co., Ltd. They are an authoritative quality appraisal company in China, and their reputation is guaranteed. Generally speaking, there will be no problems." The director of the marketing department replied.

"You send out their identification results for everyone to have a look." Lin Ying said.

"Well, then I'll project it out.

Soon Guan Tianhan projected the report. The report was very long, with a lot of missing data. There were shadow areas of tall buildings and wide buildings. Lin Ying didn't look at it, so he just dragged it to the end and looked at it. in conclusion.

The evaluation results of the dangerous building of Beigang Water Supply Center Building are as follows: the depth of the foundation is less than five meters, the density of steel bars is insufficient, the foundation of the office building has subsided slightly, and the walls have broken strands. The overall assessment is a Class C dangerous building.

"The depth of the foundation is not enough, and the density of the steel bars is not enough? Who checked and accepted these at the beginning?" Lin Zheng asked, but no one answered.

"Mr. Lin, the people who were mainly in charge of acceptance at that time should be Fei Muqing, the director of the former Beigang Institute and the current director of the Longwang Institute, and the original director Zheng of the office. We must not know." Director Guan said.

"Do you have the original design drawings? Let's take a look." Lin Ying asked someone to find the design drawings of the Beigang Building at that time. After reading it slowly for a long time, he realized that the depth of the foundation was designed to be 4 meters. , 4 iron bars on the ground beam 22.
Lin Ying didn't understand architecture either, so he didn't know whether this standard met the requirements, so the next day, he asked people to call Long Wang's Fei Muqing, the former office director Zheng Huagang, and the heads of the two companies responsible for the construction and decoration of the main building. Call over to discuss.

Both Fei Muqing and Zheng Huagang solemnly declared that they checked and accepted the project according to the drawings. As for whether the drawings were correct, they did not understand construction, and the construction party said that they designed according to the requirements of the owner, and they did not have any selfish intentions.

Everyone quarreled for a long time, chattering and annoying, but there was no result.

But Lin Ying finally understood the reason why the Beigang office building became a "dangerous building".

The reason is outrageous: it is because the simple building foundation cannot bear the load of luxurious decoration!
What do you mean?
Does it sound complicated.

The main design of the building, the depth of the foundation and the load-bearing density of the reinforced concrete can fully support the structure of the building itself. When this step was completed, the director of the water supply station and Zheng Huagang also went to participate in the acceptance inspection, and also hired experts to do it. Passed the identification of dangerous buildings.

All are passable.

There is no problem at all.

But after adding this luxurious decoration later.

The simple main body of the building could not support the heavy steel structure and decorative materials that were later renovated.

So it became a "dangerous building".

Now it is the meaning of the construction party of the building body. They use the most economical plan to simplify the construction according to the requirements of the owner. After the construction is completed, it has been verified by the authority and passed the acceptance of everyone.

So this matter has nothing to do with them. It was they who turned the building into a dangerous building after luxurious decoration.

But the decoration company is definitely not willing to take the blame. First of all, their design company also carries out luxurious decoration according to the owner's requirements.

And generally speaking, the design of the main body of the building must include the weight of the decoration. It is impossible for the main body to just reach your own load-bearing standard, leaving no room for them.

So the responsibility is not on them either.

Confused.

Lin Ying was really stunned when he heard this.

This Nima sounds like a joke, but calm down, this joke is not very funny.

What the fuck does this mean.

It shows that some people really do their best to seek benefits for themselves.

First of all, why is the construction of a building, building body and decoration not done by one construction party, but must be subcontracted to two construction teams?This is very intriguing. If it is designed by a construction team, this problem will definitely not arise.

In fact, why the main body of the building will design the load-bearing capacity according to the lowest standard, of course it is to save money, is it to save money for the company, of course not, because the project cost is fixed?
So where did the saved project money go?
Naturally, it went into someone's pocket.

So why are these people asking another construction crew for a luxurious renovation.

I thought that even if the building was rotten, the outside had to be beautiful.

Otherwise, when people see it, they will think that your building is so ugly, and it costs 2000 million?
This cannot be justified.

It will be criticized, they are not stupid, they must do enough superficial skills to sit back and relax.

It's a pity that they didn't know that it was their absurd request that caused this new building to become dangerous!

So now who is to blame.

Blame over-decoration?Others are also constructing according to the drawings, and when a building is completed, it must be renovated. How can it be said that the decoration affects the main body's load-bearing, isn't this troublesome?

Or is it to blame the quality of construction of the main body of the building?
However, the same is true for the building, which was constructed according to the drawings, and the acceptance and audit of the completion of the main body met the requirements and passed the inspection.

Why do you let others take the blame.

This goes around and around.

No one will take the blame for this matter.

Everyone is right.

Aier's company invested so much money and took so long to build a "dangerous building with no problems in every link.

Hahahaha.

Really fun.

So you guys know why there are so many shabby projects yet?
In fact, this is something that is easy to explain clearly, but it is another thing that is not clear.

I don't know if I made it clear.

Or it’s good for everyone to be a fool.

But Lin Ying was sober at the moment.

Excessive luxurious decoration is a crime, and so is "bean curd dregs project". Whether the responsibility lies in the construction of the building or the decoration of the building, they are all the same, and they all point to one thing.

Managers abuse their private power for profit.

"Fei Muqing, Zheng Huagang, you two, do you know what you did wrong?" Lin Ying suddenly gave a cold shout.

PS: It’s the last day of this month. Thank you for your support. This chapter is a bit vague for me, but I feel that I have expressed my meaning clearly. For the last two hours, please ask for a monthly pass.

(End of this chapter)

Tap the screen to use advanced tools Tip: You can use left and right keyboard keys to browse between chapters.

You'll Also Like