God-level industrial master

Chapter 353 Everything is ready

Chapter 353 Everything is ready
Several workers nearby also noticed that there seemed to be something unusual, stopped their work, and looked over one after another, and some couldn't help asking, "Xiao He, what's the matter?"

"You...you look at this connector."

Xiao He picked up the terminal that fell on the ground, put it in the palm of his hand, and showed it to everyone.The ground is paved with rubber mats, and it is fine if the wiring head falls on the ground, and there are no defects such as bumps.

Everyone's eyes were all focused on the connector in Xiao He's hand, hey, there seems to be something wrong with this connector, so familiar!

These days, the connectors that everyone uses seem to be far less beautiful, less refined, and somewhat rough.Such a beautiful and delicate wiring head, I haven't seen it again for several months.

"This seems to be a connector made by Jiuzhou Industry!"

Someone immediately shouted in surprise like this, and someone even went to the small cart next to it, and then, an even louder exclamation sounded.

"Come and see, it's all Jiuzhou industrial connectors!"

Hearing such an exclamation, everyone gathered around the small cart, looking at the delicate and beautiful connectors on the cart, and they were immediately extremely happy.

Someone speculated: "Jiuzhou Industry has fully resumed production some time ago, and it seems that some spare parts have been delivered to our factory one after another."

"Great, we can finally use Jiuzhou Industry's spare parts again. Those connectors before are simply shoddy. We have had enough."

Not only the connectors, but also some other spare parts, such as inner panels and various motors, arrived at Hongxing Factory one after another, and then were distributed to various assembly stations.

The Shaoshan series of electric locomotives, which were half dead, were assembled much more smoothly, and gradually became normal.For the DJ4 electric locomotive that has been completely shut down, some workers are also busy and doing various assemblies.

It is no longer a secret that the spare parts of Jiuzhou Industry have arrived one after another, and many workers know about it.Something very interesting happened too.

If some workers name and want parts produced by Jiuzhou Industrial Group, but they refuse to use parts from other suppliers.

"Mr. Xie, the situation is gradually improving. With the arrival of Jiuzhou Industrial's spare parts one after another, whether it is the Shaoshan series electric locomotive or our DJ4 electric locomotive, they all gradually recovered and began to enter the assembly stage. "

"Well, I already know." Xie Zhenhua nodded happily.

Just now, he made a special trip to the production site of the final assembly workshop and saw with his own eyes that the Shaoshan series and DJ4 electric locomotives have resumed normal assembly. It is estimated that in a few days, there will be Shaoshan series electric locomotives that can be delivered , There will even be a DJ4 electric locomotive off the train.

There were also some bold workers who asked Xie Zhenhua if they could purchase Jiuzhou Industry's spare parts in full, because the quality of Jiuzhou Industry's products was so good that they were satisfied with how they used them.

……

Jiuzhou Industrial Group.

At the traction motor production site, the Shaoshan series of traction motors took the lead in completing the production and manufacturing. The first vehicle, a total of six large traction motors, is being loaded.

Two large trucks, each equipped with three motors, will be shipped to the Red Star Factory after installation.

In addition, the traction motor of the DJ4 electric locomotive is being manufactured, and it should take less than two days for the first traction motor system of the DJ4 electric locomotive to be shipped to the Red Star Factory.

The situation is gratifying.

Tang Fei took a special look at the production sites in the morning, and he was satisfied and relieved.When the system released the task, Tang Fei still felt a little bit of pressure to restore the full supply of spare parts for the electric locomotives of the Red Star Factory within 20 days.

Time is too short!

Now it seems that it is not a big problem to complete this task on schedule.The foundation of Jiuzhou Industry is there. Before that, it has been producing various spare parts for the electric locomotive of Hongxing Factory. It stopped for a few months, and then fully started. Gradually, it is on the right track, and various spare parts are being produced one after another come out.

Feeling relieved, Tang Fei simply went to the Hexi factory in the afternoon.

It is located in the largest and most powerful subway manufacturing plant in China.The first phase of the project has been basically completed, and each plant has entered the stage of installation and commissioning of production equipment.

In the afternoon, Tang Fei drove his Hummer to the gate of the Hexi factory.The magnificent factory gate has been completely completed. There are already security personnel standing guard at the gate, and there are already security personnel patrolling the factory area.

Here, everything seems to be in order.

Looking inside from the gate, a huge modern factory area has been displayed in front of you.Outside the gate of the factory is a straight main road with many people and cars passing by.

Anyone who passes by here will stop more or less to take a look at this large factory area. Some outsiders will even think in their hearts, what kind of factory is this? It looks very big and looks very good.

The locals who are familiar with this place are extremely proud when they see this large factory area. This is our large factory area in Qingjiang City, which belongs to Jiuzhou Industrial Group.

The security personnel standing guard at the gate were very familiar with this Hummer, and immediately opened the electric retractable door of the factory gate, and the car drove into the factory area.

Tang Fei drove around the factory area slowly, and saw that the major factories were fully completed, and some factories were already in the process of installation and debugging of production equipment. device of.

There are domestic and imported ones.There are large milling machines, drilling machines, and large CNC machining centers, among which several large five-axis CNC machining centers are imported from abroad.

Tang Fei's car stopped at the door of one of the large factories. This is a mechanical processing factory with an area of ​​about [-] square meters. It is mainly used for the mechanical processing of some key and important spare parts on the subway. In the factory, the process layout has been Completed, some machining equipment is already being installed.

Among them, several large-scale CNC milling machines were quite eye-catching, which immediately attracted Tang Fei's attention. The machine tools were being installed, and it could be seen from the English on the machine tools that they were imported equipment.

There are also a lot of domestic equipment in the factory.

Among them, several CNC lathes are placed neatly, and obviously have been installed and debugged, and have reached the state of use.

This is the latest model of CNC lathe produced by Hehai Machine Tool Factory. After Zhang Jianxiang learned that Jiuzhou Industry needed CNC lathes, he immediately contacted him and sent these CNC lathes at a friendly price.

The current Hehai Machine Tool Factory has developed many types of CNC equipment. The industrial control chips of machine tools, IGBTs and servo motors and other key things are all manufactured by Jiuzhou Industry.

Zhang Jianxiang is grateful to Tang Fei and has never had the opportunity to repay him. The few CNC lathes he sent over this time are truly friendly prices.

Tang Fei walked over and looked at these CNC lathes with professional eyes. He was satisfied. Although they were domestic CNC lathes, they were already very good. They were completely enough for processing some spare parts on the subway.

In the manufacturing of subways, the largest amount of engineering is various mechanical processing, including cold processing and hot processing, and then the general assembly of subways.

Cold processing includes turning, milling, grinding, etc., while thermal processing is mainly welding. In the Hexi factory area, there is a professional welding machine workshop with an area of ​​more than 1 square meters, which is mainly used for welding aluminum alloys.

The beams, chassis, car body, etc. of the subway are all made of aluminum alloy, which is a little different from the electric locomotive.This kind of material has small specific gravity, light weight and good shock absorption performance. The subway made of this kind of material runs smoothly and comfortably, and the vibration and noise are relatively small.

Tang Fei walked into the welding workshop.

The construction standard of the factory building is relatively high, and it can achieve constant temperature and humidity all year round, and the temperature and humidity are both controllable.Some and welding assembly in the factory building started to be installed.

In the workshop, there are two very eye-catching locations, which have already been drawn. There, two large-scale welding equipment, also called welding robots, will be installed. They are controlled by CNC and have a high degree of automation. The welding stroke can reach 50 meters.

The welding of some large components on the subway, such as the subway bottom beam, has a length of 30 to [-] meters, and such welding equipment must be used.

Tang Fei was going to exchange such advanced welding equipment from "God-level Industrial Owners".

The spare parts needed by the Red Star Factory are already in full production and manufacturing, and many spare parts have begun to be delivered one after another, and the full delivery is just around the corner.

After completing this task, you can get gold coin rewards, which can be exchanged from the system for some equipment needed to produce subways, such as such a large welding robot.

Tang Fei was in the Hexi factory almost all afternoon.

Gradually, everything in the entire factory area looked decent, and the equipment was installed and debugged. Tang Fei felt very relieved and looked forward to the day when the subway was manufactured.

……

Days pass by.

A few days passed in a flash. At the production site of Jiuzhou Industry, many people became happy. After working so hard for so long, they finally achieved major results.

Liu Jiang is the production deputy general manager of the Hedong plant. He is in charge of production. Knowing that the production of the DJ4 traction motor has been completed, he personally went to the production site.

Looking at the traction motor system in front of him, and seeing several technicians and quality personnel conducting the final inspection, Liu Jiang thought in his heart that he would know the result soon.

After about one or two 10 minutes, the inspection was finally completed. The technician in charge came over and said happily: "Mr. Liu, the inspection has been completed. Our DJ4 traction motor system is not only qualified, but also quality and performance. They are all excellent and can be delivered to the Red Star Factory.”

"Okay, great!"

Liu Jiang was very happy all of a sudden, the DJ4 of Red Star Factory was waiting for the rice to cook. After resuming the production of DJ4 parts, the traction motor system of the first car was finally completed.

Picking up the phone, Liu Jiang personally announced the good news to Tang Fei!

……

Today is the third update, and the second update will be delivered!

(End of this chapter)

Tap the screen to use advanced tools Tip: You can use left and right keyboard keys to browse between chapters.

You'll Also Like