Almighty crossover king

Chapter 1435 ??????? Dayun City

Chapter 1435 Dayun City

The establishment of the country was officially put on the agenda, and the entire private sector began to operate around this matter.

In the middle of the private domain map, a huge project was officially launched.A city is to be built here, a special city.

Dayun City, this is the name of the city.However, it can also be understood as the palace of Dayun Kingdom in the future.

The entire Dayun City is square, with a side length of 9500 meters, implying the Ninth Five-Year Respect.

The whole city is not made of 3D printing technology, but the construction material of super condensate is not used.

Although that material has a lifespan of hundreds of years, it cannot meet the requirements at all.For this city, Zhang Fan has very high requirements, so the construction of the whole city has special materials and special craftsmanship.

"Pan left 1mm"

"Okay, accuracy confirmation"

On the city wall of Dayun City, the construction team is busy.

A giant hoisting device was built on both sides of the city wall, and a huge brick was precisely placed in its position.The installation accuracy is at the millimeter level, and the installation accuracy error does not exceed 0.5 mm.

Looking at this kind of brick, it is not ordinary and magnificent at all. The whole brick surface is as smooth as a mirror. This kind of brick surface is integrally formed by special technology, and the surface is absolutely flat.

The construction of the entire city wall is like assembling a piece of high-precision equipment, and the installation accuracy is even higher than some high-precision equipment.

Huge bricks are very heavy. This kind of brick is not an ordinary brick, but a ceramic composite brick made by a special process.

This kind of ceramic composite brick has a very high Mohs hardness, which is higher than that of diamond.In addition to high hardness, the molecular structure is also very stable. This molecular structure will not show any damage even for 1 or even 10 years.

Moreover, this kind of ceramic composite brick is not afraid of wind and sun, and is very strong.All the buildings in Dayun City use this kind of bricks.

These bricks do not need any adhesives. After the bricks are installed, the mortise and tenon technology is used to fix the bricks together with the mortise and tenon of this material.

At the construction site, when the bricks overlapped, a piece of equipment started to work.The components inside the equipment are mortise and tenon parts, which can only be installed after being frozen with liquid nitrogen in the equipment.

The mortise and tenon structure is accurately installed, and the installation accuracy is very high. If the error exceeds 0.5 cm, it cannot be installed.

After the frozen mortise and tenon structure is installed, the temperature begins to rise, thermal expansion and contraction, when the temperature returns to normal, this mortise and tenon structure expands a little, just to fix the bricks to be fixed firmly together, it is impossible to Take it apart.

City walls, internal buildings, floor tiles on the ground, etc.The main body adopts this new material and new technology, and it can be built once, and it will not need to be touched for ten thousand years.

The main building adopts a layered construction method. Firstly, the whole theme is constructed with ceramic composite materials, without leaving any gaps or pipes in the middle.

After the main body is built, a special wooden structure is used inside to build the first floor.This floor is like building a new house, and all kinds of pipelines are reserved in this floor.

If it needs to be redecorated in the future, it only needs to tear down the inner floor and rebuild it, and the theme of the outside will not be changed in any way.

The entire Dayun City completely adopts Chinese-style architecture, and every place is very particular, not only beautiful but also very functional.

In the future, the entire Dayun City will not only be the place where the royal family lives, but also the power center of the Dayun Kingdom. Many important events will be held here.

In addition to beauty, safety is also the most important.The entire Dayun City includes two parts above ground and underground.The aboveground part is where the usual activities are, while the underground part is much larger.Not just a sanctuary, but a research center.

In the future, the most core and confidential research and development projects of the Dayun Kingdom will be carried out here, and this will also be the last strategic location of the Dayun Kingdom in the future, and some strategic-level weapon activation switches will be established here.

The city of ten miles, and outside Dayun City is a moat thousands of meters wide.Outside the moat, there will be various administrative agencies, and a new city will be built around Dayun City.This new city will be the capital of the future Dayun Kingdom.

Unlike other countries, the capital of Dayun Kingdom is the country's political center as well as the country's economic center.

Not the Dayun Kingdom, after all, the entire Dayun Kingdom is not very big.Regarding the positioning of the capital, Zhang Fan has already set it up. The entire capital is a city of talents and a city of scientific research.

In the future, the most cutting-edge scientific research talents of Dayun Kingdom will be gathered here.They live here, work here, and enjoy the highest welfare treatment here.

Here, there will be the best hospitals, the best schools, the best nursing homes, and the best parks.

As long as you have the ability, you can enjoy everything here.In the future, everyone in the entire Dayun Kingdom will be proud to enter here.

The entire capital is not a kilometer building, but a forest city.In the real city inside the forest, the buildings are also low-rise buildings, and all buildings must not be higher than the city wall of Dayun City.

The population density here will be very low, and the greenness will be very high. Living here is much better than living in a thousand-meter building.

The construction speed of Dayun City is very fast, although compared with 3D printing, the speed is much slower.However, there are many people and strength, and many engineering teams work together, so the speed is very fast.

The construction of the underground part is also very fast. Various types of Drilling Dragons are busy, and the entire underground space is rapidly taking shape.

The underground space adopts a new formula of super condensate, which will not be damaged for 600 years underground.At the same time, the degree of defense has been greatly increased, which is enough for now.

As for the future, with the development of science and technology, the dungeons of the future will definitely undergo continuous transformation to adapt to the trend.

And outside Dayun City, there is a circle of city walls.This circle of city walls is [-] kilometers long and surrounds Dayun City, forming a back-shaped building.

Outside Dayun City, inside the city wall, this is the area of ​​the capital, Longyun City.This area is enough for Dayun Country with a population of only a few million.

Besides, the people living here are all the top talents. These talents are not ordinary labor force. The number of these talents is limited, and such a large area is enough.

The capital, an independent city, will also be Zhang Fan's home in the future, so the construction here must not be sloppy at all, and all constructions will be carried out strictly according to the plan.Various research institutes are also planning. Once the construction here is completed, some research institutes will move here. This is a new city. After the construction here is completed, it will be the time when Dayun Kingdom is established. High-level people are paying attention, looking forward to the day when the construction is completed.

(End of this chapter)

Tap the screen to use advanced tools Tip: You can use left and right keyboard keys to browse between chapters.

You'll Also Like