Military industrial hegemony
Chapter 1306
Chapter 1306
Although it was just Jiang Chen's teasing and joking, Yang Yuan still heard the meaning of Jiang Chen's words.So he said bitterly: "Mr. Jiang, Mr. Guo, it's not that we don't speed up, but that this speed is already the fastest. You know, the entire park uses concrete and steel structures except for the three high-rise buildings. Other big buildings Some of them are wooden residential buildings, all of which require carpenters to build. Now we have almost recruited all the carpenters from the ten miles and eight townships of Anxi, but we still can’t keep up with the progress.”
Jiang Chen nodded when he heard the words, looked at the busy construction site and said, "It's true that it's difficult to find so many carpenter areas at once, but you didn't think that if you change your mind, maybe the matter will be solved?"
"A different way of thinking?" Yang Yuan asked in confusion.
"Yes, it's just a different way of thinking." Jiang Chen said to Yang Yuan: "At present, your progress is slow because of the lack of carpentry. But in my opinion, many jobs do not require carpentry, and can be handed over to others according to the drawings. Workers are responsible. And the houses we build are basically designed according to a unified design, so the construction structure and size are the same, so is this very suitable for mass production and construction?"
"Mr. Jiang, do you mean to treat it as a commodity and then produce it on an assembly line?" Yang Yuan said somewhat clearly.
Jiang Chen nodded and said: "Yes, you can also look at it this way. My idea is that these carpenters can be gathered together, and then jointly be responsible for the production and processing of these house parts. Before them, there were workers who were responsible for log processing. After these carpenters, workers can also be arranged to assemble according to the drawings. As for the problems in the assembly process, it is absolutely possible to organize a special group of carpentry experts to help and solve them.”
"That's right, why didn't we think of it?" Yang Yuan suddenly realized: "Boss Jiang, this method is great, I will organize it now!"
Seeing that Yang Yuan was about to leave, Jiang Chen stopped him with a smile and said, "Don't worry, you can do it after we leave."
After stopping Yang Yuan, Jiang Chen and his group put on hard hats and walked into the construction site.Looking at the busy scene, Jiang Chen asked, "How is the construction of the firefighting facilities, water heating, power supply, and gas supply going?"
"Because the plan was agreed, we took over the required water supply from Nanshan's main water supply pipeline, no problem. However, with so many new users, I am afraid that it will increase the pressure on Nanshan's water supply system. .” Yang Yuan said with some concern.
In this regard, Guo Chengye waved his hand and smiled: "Don't worry, we have a plan for this. At present, apart from part of the water supply source of our Nanshan, which is connected to the Anxi municipal water supply network, a considerable part comes from ourselves. As you know, our water plant is next to our own hydropower station, and we use the water in the reservoir and then purify it. And you can rest assured that the water source is mountain spring water flowing from the Qinling Mountains. It is the highest level that can be directly quoted. This time, we will further expand the area of the water plant and increase the treatment capacity, and strive to ensure that it can bear 90.00% of the daily and industrial water in Nanshan. "
"If that's the case, then I can rest assured." Yang Yuan smiled.
And Jiang Chen also smiled at this time and said: "Actually, this is only a small part. With the rapid development of Nanshan, more and more people come to Nanshan. It is very difficult to rely on a reservoir and a waterworks alone. It will soon be unable to satisfy the development here. In addition, if relying on a water plant alone, the risk will be relatively high, so the transformation of this water purification plant is only a part. In the future, we will increase the creeks and rivers at the northern foot of the Qinling Mountains Find a suitable location and build a series of small and medium-sized reservoirs. These reservoirs, in addition to providing Nanshan with a steady stream of daily water supply, will also generate electricity to supply users throughout Nanshan.”
"Speaking of power supply, I really have one thing here." Guo Chengye smiled at Jiang Chen: "Currently our power supply network in Nanshan, except for the power generated by our own hydropower station, the rest is from the Wei The energy base in the northern region was transported by a special line. With the development of our Nanshan and the soaring electricity consumption, the original transmission line can no longer meet the rapid development of our Nanshan. Therefore, the city decided that we will The dedicated power transmission line will be upgraded to ensure greater power transmission capacity."
"This is a good thing. Since the city has this kind of intention, then you should cooperate and strive to complete the project as soon as possible." Jiang Chen said with a smile.
But Guo Chengye shook his head and said: "This is a good thing, but the more troublesome thing is that there will be a power outage for a period of time during maintenance and upgrading, which will have a great impact on our production and life."
Hearing this, Jiang Chen put away his smile and nodded, "It's really troublesome, what do you say in the city?"
Guo Chengye replied to Jiang Chen: "The city is also trying to figure out a way. They also know that if there is a power outage, it will have a great impact on Nanshan's production and life. Now the economic development of the entire Nanshan is the engine and leader of Anxi's economic development. Leaders, they naturally don’t want any problems here. So now the city is trying to figure out whether to transfer part of it from other power grids to survive this period of time.”
"Currently, the electricity consumption everywhere is relatively tight. In an industry, the requirements for electricity consumption are relatively high. I'm afraid it will be difficult." Jiang Chen frowned and said.
"It's really difficult, but the city is trying to figure out a way. They thought of a way, that is, to see if they can temporarily stop the domestic electricity and use it to collect electricity for industrial production." Guo Chengye said to Jiang Chen.It was just talking, but the words also showed Jiang Chen's attitude.
Regarding this, Jiang Chen frowned and said: "If industrial production stops, it will indeed bring us a relatively large loss. But once the domestic electricity is stopped, it will definitely bring trouble to the lives of the entire Nanshan people. No matter what we do Everything must be people-oriented, so I definitely cannot accept the whole proposal."
After finishing speaking, Jiang Chen thought for a while and then continued: "I think it can be done like this. You can communicate with the city government to see if you can organize more forces to try to compress the entire upgrade and renovation time to the shortest possible time. The whole The second is to see if you can choose to carry out the transformation at night or on holidays and rest days. In this way, the impact on production and life will not be great. The third is that production must make concessions for life. Let them As far as possible to ensure the normal electricity consumption of the people. As for us, we can temporarily use the power of our own hydropower station for emergency rescue, and give priority to supplying those important and emergency production departments or units. As for others, we can choose to consider a temporary holiday, just Consider it a benefit."
Guo Chengye heard Jiang Chen's words, looked at Jiang Chen, nodded heavily, and said, "Okay, leave it to me, I will definitely make the ropeway the shortest possible time."
"Well, then I'll leave it to you." Jiang Chen smiled.
(End of this chapter)
Although it was just Jiang Chen's teasing and joking, Yang Yuan still heard the meaning of Jiang Chen's words.So he said bitterly: "Mr. Jiang, Mr. Guo, it's not that we don't speed up, but that this speed is already the fastest. You know, the entire park uses concrete and steel structures except for the three high-rise buildings. Other big buildings Some of them are wooden residential buildings, all of which require carpenters to build. Now we have almost recruited all the carpenters from the ten miles and eight townships of Anxi, but we still can’t keep up with the progress.”
Jiang Chen nodded when he heard the words, looked at the busy construction site and said, "It's true that it's difficult to find so many carpenter areas at once, but you didn't think that if you change your mind, maybe the matter will be solved?"
"A different way of thinking?" Yang Yuan asked in confusion.
"Yes, it's just a different way of thinking." Jiang Chen said to Yang Yuan: "At present, your progress is slow because of the lack of carpentry. But in my opinion, many jobs do not require carpentry, and can be handed over to others according to the drawings. Workers are responsible. And the houses we build are basically designed according to a unified design, so the construction structure and size are the same, so is this very suitable for mass production and construction?"
"Mr. Jiang, do you mean to treat it as a commodity and then produce it on an assembly line?" Yang Yuan said somewhat clearly.
Jiang Chen nodded and said: "Yes, you can also look at it this way. My idea is that these carpenters can be gathered together, and then jointly be responsible for the production and processing of these house parts. Before them, there were workers who were responsible for log processing. After these carpenters, workers can also be arranged to assemble according to the drawings. As for the problems in the assembly process, it is absolutely possible to organize a special group of carpentry experts to help and solve them.”
"That's right, why didn't we think of it?" Yang Yuan suddenly realized: "Boss Jiang, this method is great, I will organize it now!"
Seeing that Yang Yuan was about to leave, Jiang Chen stopped him with a smile and said, "Don't worry, you can do it after we leave."
After stopping Yang Yuan, Jiang Chen and his group put on hard hats and walked into the construction site.Looking at the busy scene, Jiang Chen asked, "How is the construction of the firefighting facilities, water heating, power supply, and gas supply going?"
"Because the plan was agreed, we took over the required water supply from Nanshan's main water supply pipeline, no problem. However, with so many new users, I am afraid that it will increase the pressure on Nanshan's water supply system. .” Yang Yuan said with some concern.
In this regard, Guo Chengye waved his hand and smiled: "Don't worry, we have a plan for this. At present, apart from part of the water supply source of our Nanshan, which is connected to the Anxi municipal water supply network, a considerable part comes from ourselves. As you know, our water plant is next to our own hydropower station, and we use the water in the reservoir and then purify it. And you can rest assured that the water source is mountain spring water flowing from the Qinling Mountains. It is the highest level that can be directly quoted. This time, we will further expand the area of the water plant and increase the treatment capacity, and strive to ensure that it can bear 90.00% of the daily and industrial water in Nanshan. "
"If that's the case, then I can rest assured." Yang Yuan smiled.
And Jiang Chen also smiled at this time and said: "Actually, this is only a small part. With the rapid development of Nanshan, more and more people come to Nanshan. It is very difficult to rely on a reservoir and a waterworks alone. It will soon be unable to satisfy the development here. In addition, if relying on a water plant alone, the risk will be relatively high, so the transformation of this water purification plant is only a part. In the future, we will increase the creeks and rivers at the northern foot of the Qinling Mountains Find a suitable location and build a series of small and medium-sized reservoirs. These reservoirs, in addition to providing Nanshan with a steady stream of daily water supply, will also generate electricity to supply users throughout Nanshan.”
"Speaking of power supply, I really have one thing here." Guo Chengye smiled at Jiang Chen: "Currently our power supply network in Nanshan, except for the power generated by our own hydropower station, the rest is from the Wei The energy base in the northern region was transported by a special line. With the development of our Nanshan and the soaring electricity consumption, the original transmission line can no longer meet the rapid development of our Nanshan. Therefore, the city decided that we will The dedicated power transmission line will be upgraded to ensure greater power transmission capacity."
"This is a good thing. Since the city has this kind of intention, then you should cooperate and strive to complete the project as soon as possible." Jiang Chen said with a smile.
But Guo Chengye shook his head and said: "This is a good thing, but the more troublesome thing is that there will be a power outage for a period of time during maintenance and upgrading, which will have a great impact on our production and life."
Hearing this, Jiang Chen put away his smile and nodded, "It's really troublesome, what do you say in the city?"
Guo Chengye replied to Jiang Chen: "The city is also trying to figure out a way. They also know that if there is a power outage, it will have a great impact on Nanshan's production and life. Now the economic development of the entire Nanshan is the engine and leader of Anxi's economic development. Leaders, they naturally don’t want any problems here. So now the city is trying to figure out whether to transfer part of it from other power grids to survive this period of time.”
"Currently, the electricity consumption everywhere is relatively tight. In an industry, the requirements for electricity consumption are relatively high. I'm afraid it will be difficult." Jiang Chen frowned and said.
"It's really difficult, but the city is trying to figure out a way. They thought of a way, that is, to see if they can temporarily stop the domestic electricity and use it to collect electricity for industrial production." Guo Chengye said to Jiang Chen.It was just talking, but the words also showed Jiang Chen's attitude.
Regarding this, Jiang Chen frowned and said: "If industrial production stops, it will indeed bring us a relatively large loss. But once the domestic electricity is stopped, it will definitely bring trouble to the lives of the entire Nanshan people. No matter what we do Everything must be people-oriented, so I definitely cannot accept the whole proposal."
After finishing speaking, Jiang Chen thought for a while and then continued: "I think it can be done like this. You can communicate with the city government to see if you can organize more forces to try to compress the entire upgrade and renovation time to the shortest possible time. The whole The second is to see if you can choose to carry out the transformation at night or on holidays and rest days. In this way, the impact on production and life will not be great. The third is that production must make concessions for life. Let them As far as possible to ensure the normal electricity consumption of the people. As for us, we can temporarily use the power of our own hydropower station for emergency rescue, and give priority to supplying those important and emergency production departments or units. As for others, we can choose to consider a temporary holiday, just Consider it a benefit."
Guo Chengye heard Jiang Chen's words, looked at Jiang Chen, nodded heavily, and said, "Okay, leave it to me, I will definitely make the ropeway the shortest possible time."
"Well, then I'll leave it to you." Jiang Chen smiled.
(End of this chapter)
You'll Also Like
-
Taiping Order
Chapter 567 14 hours ago -
There's a ghost inside me
Chapter 1331 22 hours ago -
Conan: Beika Town in the White Eyes
Chapter 123 22 hours ago -
Cang Yuantu: I turn into ice and take charge of killing
Chapter 110 22 hours ago -
Iron Man on the pitch
Chapter 303 22 hours ago -
I can only say this game is very simple
Chapter 402 1 days ago -
The End of the World: I built the Supreme Shelter one year in advance
Chapter 197 1 days ago -
Miss Witch, it's time to clean up the entries
Chapter 218 1 days ago -
Fusion is the noblest form of summoning!
Chapter 403 1 days ago -
My family is super strong
Chapter 590 1 days ago