Chapter 24

"Why can't it? It's always been like this. Don't talk about building such a big project as a dam, even building a house must be like this, sir." Ge Ziyun said puzzled.

"We're still in the early stages, you see, the pirates are still unresolved.

We can't make a big fanfare and attract the wind with a big tree. At that time, won't we attract more pirates?
Therefore, we have to do it quietly, just make a fortune in silence. " Tang Wen said.

"That's right, just as the master said, do things quietly and make a fortune in silence." Zhan Dongwen nodded.

"Dongwen, we now have two digging iron horses, and the two iron horses are the main ones. First, we need to clean out the bottom of the dam.

To dig deep, the foundation must be solid and large.

The bottom part also needs to install the drain...

You must strictly follow the drawings I drew for you.

By the way, some time ago I asked you to invite some old masters over, did you invite anyone? " Tang Wen confessed.

"Come here, their asking price is too high, ten taels of silver a month.

We invited more than a dozen, and it cost more than 100 taels a month.

This dam can't be built in half a year, but it's worth thousands of taels, it's like eating people. " Zhan Dongwen said with a face full of pain.

"It's okay, they are all masters in building foundations and dams, and they have experience.

In some respects, you must follow their lead.

However, what I teach you must also be clearly explained to them, and you cannot do exactly what they say. " Tang Wen said.

"Understood." Zhan Dongwen nodded.

After Zhan Dongwen left, Tang Wen has been thinking about it, and probably needs a crash course in technology.

For example, control excavators, crushers, road rollers, forklifts, etc.

For example, if these machines break down, there must be a repairman.

Of course, some simple minor problems can be repaired, but it is absolutely impossible to ask them to repair electronic components. If the electronic components are broken, the machine will be scrapped.

Down below, Tang Wen called Shang Zhanzhao, and led more than [-] people to pick a sunny spot and start installing solar panels.

The orthodox name of this thing should be called "photovoltaic power generation", which is based on the principle of photovoltaic effect, using solar cells to directly convert sunlight into electricity.

Photovoltaic power generation equipment is extremely refined, reliable, stable, long-life, and easy to install and maintain.

The last time he traveled back to Yunhai City, Tang Wen studied for ten or so days before he finally figured out the way.

Moreover, this batch of photovoltaic power generation equipment ordered by Tang Wen requires simpler installation, and the photovoltaic factory has also made considerable improvements. Ordinary people can do it after a few days of study.

Half a month has passed quietly, the photovoltaic power generation has been installed, and the effect is good after debugging.

In this way, all the tents were equipped with electric lights, and Dawali searchlights were installed outside the camp.

Naturally, the dam construction site is indispensable. When the electricity is sufficient in the future, Tang Wen plans to install street lights along the roads along the lake.

When all the bulbs were turned on, everyone was stunned.

"Is this the night pearl?"

"How much do you pay for so many Ye Mingzhu?"

"The master said, that's not a night pearl, it's called an electric light."

"It's so bright that I can see clearly at night."

……

Seeing these ancient people talking about it in the square, Tang Wen felt amused. Wouldn't it scare you to death to install some colored lanterns when you have time?
Of course, photovoltaic power generation still occupies a relatively large area. Tang Wen plans to build some wind turbines when the time is right.

However, the wind turbine is too big and heavy, and Tang Wen has no such technology.

It can only be brought back across the country after the entire installation is completed. A large wind turbine weighs 400-500 tons.

The blades of a 6 megawatt wind turbine weigh about 70 tons, and the rotor of the generator weighs about 100 tons.

The stator of the generator is about 140 tons, plus the weight of the cabin and the tower is about 460 tons.

After it is installed and brought back, it will be installed on the island but there is no ability to stand it up, because it needs large cranes, cranes and other equipment to stand it up.

These are a bit complicated. For the time being, Tang Wen is not yet able to do it.

"Master, these electric lights are so easy to use. From then on, I'm no longer afraid of the dark." After returning to the board room, Zhan Junru said excitedly like a child who hasn't grown up.

"Master, are these imported from the West?" Gu Hanyan asked.

"Of course, these are all Western things, and we can't make them here." Tang Wen replied.

"Westerners are really smart, how can they come up with so many useful things. Look at this bedside lamp, it turns on with one touch, and you can actually adjust the brightness." Gu Hanyan said.

"Come on, I'll teach you how to use the jacuzzi..." Tang Wen turned on the water and let the water wash away. The two women stretched out their hands and tried it, and they felt very comfortable.

"You can also use it in the future." Tang Wen finished speaking solemnly and went out.

"How about, sister, let's try?"

"It's not good, it's the master's."

"If there is anything, just clean it up. What's more, the master said we can use it, so let's try it once."

Down below, there was a fight inside.

(End of this chapter)

Tap the screen to use advanced tools Tip: You can use left and right keyboard keys to browse between chapters.

You'll Also Like