Alpine Orchard
Chapter 18
Chapter 18
Ye Mo asked someone to re-measure the area of the high soil slope.
The high soil slope, except for one side of the mountain, the rest of the slope is very steep, between 60-70 degrees.
On the side of the mountain, the slope also has a slope of 30-50 degrees.
The highest point on the top of the mountain is a circular soil slope.
In addition to the slopes, there are some hills around.
The whole high slope, the land that can be reclaimed, covers an area of about 220 mu.
Among them, 150 mu was already under Ye Mo's name, and the remaining land could be opened up. Ye Mo found the village chief and contracted it for 11 yuan.
70 mu, the contract period is 30 years.The total price is 11.
After 30 years expire, Ye Mo can give priority to renewing the lease, and the rent increase will not exceed [-]%.
The contract price for barren hills is not high locally.
There are still a few barren hills below the high soil slope.Ye Mo asked someone to measure the high soil slope, and by the way measured the barren hills below.
3 slices of mountains.
3 pieces, not three seats.
The mountain here, can't see the top of the mountain, or the top of the mountain is very big.A slice is worth half of a mountain, that is, a hillside.The other half of the hillside is connected to Chen Chen's production team, and some places have been reclaimed.
There are a little more than 3 pieces, with a total of 53 acres.
Ye Ran has contracted two areas, totaling 30 mu.There are still 23 acres, which Chen Chen contracted.
For barren hills that have not been reclaimed, the contract price is very cheap.
……
Returning to the countryside to start a business is not as good as everyone imagines.
The local area is a mango demonstration base production area, but even so, some people invest in mango orchards, and the operation cannot continue.
In Donghe Town, there are 6 mango orchards listed for transfer, and one of them covers 81 mu.The remaining five mango orchards cover more than ten or twenty acres.
The 81 acres of mango orchards have already bear fruit this year. The 81 mu of mango orchards are all on relatively steep hillsides, which is inconvenient for irrigation and fertilization... In short, everything is inconvenient.Labor costs are too high.
"elder brother."
After eight o'clock, in the evening.
In summer, it gets dark late on their side.
After eight o'clock, the sky is still bright.
Ye Ran took Xiao Mu for a stroll and came back. Seeing the rose flowers next to the house, many flower buds had grown again, and shouted loudly.
"What are you doing?" Ye Mo walked out.
"The rose is blooming."
"It's not normal for the rose to bloom." Ye Mo glanced at it.
The roses on their side bloom in April, and the flowering period will last until November, or even longer.
May has the most flowers.
Afterwards, we spread out scatteredly, mainly depending on management.
But now, the rose has grown a lot of flower buds.
To be on the safe side, Ye Mo poured a small bowl of spiritual spring for Rose a few days ago.
The main purpose is to verify that Lingquan can indeed help plants grow better...
"So many conversations." Ye Ran said, holding a stack of papers, and handing them to Ye Mo: "This is the quotation for road hardening, take a look."
"Yeah." Ye Mo went back to the room with the quotation and read it.
C25 concrete is required for paving.
Concrete can be purchased from a concrete factory, or you can buy sand, gravel and cement and mix it yourself.
Buy sand and gravel, and make cement yourself, the price is cheaper.
There are quotations for gravel and cement on it.
Road construction also requires concrete mixing, bulldozers, and paving prices.Small equipment and labor are calculated on a daily basis.
The price of a simple template is calculated at 6 yuan.
After that, the site needs to be leveled. If there is a roadbed, the price will be cheaper...
There is a sand and gravel field in their town, and they make concrete by themselves, which costs about 1 yuan per cubic meter of concrete.Much cheaper than buying cement from a concrete plant.
The length of the main road planned by Ye Mo is 2215 meters.
Road width, 3.2 meters.
In addition, three warehouses will be built on the top of the mountain, and cement dams will be needed...
"The road I use doesn't need to be done too well." Ye Ran said.
Ye Mo nodded: "15 cm thick, how about it?"
"If you want to talk about me, a thickness of ten centimeters will do."
"The main road needs to run big cars. The road surface is too thin to bear the force."
"That's 15 centimeters. The concrete floor of the warehouse site doesn't need to be too thick, 10 centimeters is fine. It doesn't have to be as thick as the road surface..."
Ye Mo took out his notebook and calculated.
Calculated at 300 yuan per cubic meter of concrete, 1 cubic meter of concrete can be paved with 6.66 square meters.
The main road is 2215 meters long, 3.2 meters wide, and 15 centimeters thick... The cost per square meter is about 55-60 yuan.These are all inclusive.
Main road, total cost: about 41.
Don't build the roads you use too well.
The concrete roads in rural areas are basically about 20 centimeters thick.Some cement will lay rebar...
On Ye Mo's side, that is to say, when picking fruits, he will drive a cart. Normally, without a cart, it is not as good as making it.
From an economic point of view, everything is enough.
In addition to the main road, the orchard also needs to trim the cement road to facilitate fruit picking, fertilizer transportation and so on.Also, by the way, Yeran's orchard will be repaired with concrete roads...
The total length of the road in the orchard is about 5.2 kilometers, the width is 2.5 meters, and the thickness is 10 centimeters (0.1 meters).
In addition, several warehouses need to be built, and the cement surface should be laid first...the total area to be paved is 1.3 square meters.The total cost is around 52.
For road construction, the cost calculated by Ye Mo here is 93.Maybe a little overspending, but never more than 100 million.
There is a prerequisite for this, the roadbed needs to be leveled by Ye Mo himself.
"It costs a lot to build an orchard," Ye Mo said.
"You need to build a concrete road yourself... If you want me to say, the main road can be built. There is not much need for the cement road in the orchard." Ye Ran said.
They have a lot of orchards here, but they don't have concrete roads in the orchards...
"If you want to do it, do it in one step, so as not to do it in the future." Ye Mo said.
Not without money.
If you have money on hand, naturally do a better job.
If it is necessary to save, if there is no need to save, there is no need to save.
Ye Mo's family has already picked all the mangoes that can be picked.
There are still 11 acres of Kate mangoes left, and the picking started at the end of September, which is still very early.
Mom and Dad went out to play cards, and they didn't come back until very late.
Ye Mo and the others checked the materials and went to bed early.
the next day.
Ye Mo went out to find the excavator master, and explained the requirements in detail, that is, leveling the roadbed...
To level the roadbed of seven or eight kilometers, the amount of work is not small.Some places have to dig mountains...
As far as the situation in the mountains is concerned, it will take at least half a month for all the roads to be cleared out, and the time given by the excavator master.
The most difficult is the road in the orchard, which requires a lot of leveling.The amount of work is a bit large.
The master of the excavator is the mayor of the town, and the current market price is soaring.If it was last year, the 20-ton machine would cost about 230 yuan per hour for one shift.Taiwan shift, a Taiwan shift refers to 8 hours...
Ye Ran told the master of the excavator the basic situation, and said: "The roads here are all leveled, how much is it?"
"This project is a bit large. The main road is okay... I have to calculate the specific amount of construction for the road in the orchard."
"That's troublesome, master."
"No trouble……"
The master of the excavator is an excavator of about 20 tons.
An excavator of about 20 tons, some excavators can dry up to 24 oil per hour...
Now that the price of diesel has reached 7 yuan, the price of excavators has also risen.
At the current oil price, it is easy for an excavator to kill 1000 yuan of oil a day.
High fuel costs mean less work for large excavators.The current excavator is easy to find.
The final negotiated price was 2000 yuan per day.How to work, Ye Mo and the others have the final say.
2000 yuan per day, 8 hours a day.The work here is at least 7 days.There is also the shipping fee for the excavator, Ye Mo and the others paid 700 yuan...
Master Wang is not only the owner of the excavator, but also the master of the excavator. 2000 yuan a day, with the current fuel costs, Master Wang can still make a profit.
(End of this chapter)
Ye Mo asked someone to re-measure the area of the high soil slope.
The high soil slope, except for one side of the mountain, the rest of the slope is very steep, between 60-70 degrees.
On the side of the mountain, the slope also has a slope of 30-50 degrees.
The highest point on the top of the mountain is a circular soil slope.
In addition to the slopes, there are some hills around.
The whole high slope, the land that can be reclaimed, covers an area of about 220 mu.
Among them, 150 mu was already under Ye Mo's name, and the remaining land could be opened up. Ye Mo found the village chief and contracted it for 11 yuan.
70 mu, the contract period is 30 years.The total price is 11.
After 30 years expire, Ye Mo can give priority to renewing the lease, and the rent increase will not exceed [-]%.
The contract price for barren hills is not high locally.
There are still a few barren hills below the high soil slope.Ye Mo asked someone to measure the high soil slope, and by the way measured the barren hills below.
3 slices of mountains.
3 pieces, not three seats.
The mountain here, can't see the top of the mountain, or the top of the mountain is very big.A slice is worth half of a mountain, that is, a hillside.The other half of the hillside is connected to Chen Chen's production team, and some places have been reclaimed.
There are a little more than 3 pieces, with a total of 53 acres.
Ye Ran has contracted two areas, totaling 30 mu.There are still 23 acres, which Chen Chen contracted.
For barren hills that have not been reclaimed, the contract price is very cheap.
……
Returning to the countryside to start a business is not as good as everyone imagines.
The local area is a mango demonstration base production area, but even so, some people invest in mango orchards, and the operation cannot continue.
In Donghe Town, there are 6 mango orchards listed for transfer, and one of them covers 81 mu.The remaining five mango orchards cover more than ten or twenty acres.
The 81 acres of mango orchards have already bear fruit this year. The 81 mu of mango orchards are all on relatively steep hillsides, which is inconvenient for irrigation and fertilization... In short, everything is inconvenient.Labor costs are too high.
"elder brother."
After eight o'clock, in the evening.
In summer, it gets dark late on their side.
After eight o'clock, the sky is still bright.
Ye Ran took Xiao Mu for a stroll and came back. Seeing the rose flowers next to the house, many flower buds had grown again, and shouted loudly.
"What are you doing?" Ye Mo walked out.
"The rose is blooming."
"It's not normal for the rose to bloom." Ye Mo glanced at it.
The roses on their side bloom in April, and the flowering period will last until November, or even longer.
May has the most flowers.
Afterwards, we spread out scatteredly, mainly depending on management.
But now, the rose has grown a lot of flower buds.
To be on the safe side, Ye Mo poured a small bowl of spiritual spring for Rose a few days ago.
The main purpose is to verify that Lingquan can indeed help plants grow better...
"So many conversations." Ye Ran said, holding a stack of papers, and handing them to Ye Mo: "This is the quotation for road hardening, take a look."
"Yeah." Ye Mo went back to the room with the quotation and read it.
C25 concrete is required for paving.
Concrete can be purchased from a concrete factory, or you can buy sand, gravel and cement and mix it yourself.
Buy sand and gravel, and make cement yourself, the price is cheaper.
There are quotations for gravel and cement on it.
Road construction also requires concrete mixing, bulldozers, and paving prices.Small equipment and labor are calculated on a daily basis.
The price of a simple template is calculated at 6 yuan.
After that, the site needs to be leveled. If there is a roadbed, the price will be cheaper...
There is a sand and gravel field in their town, and they make concrete by themselves, which costs about 1 yuan per cubic meter of concrete.Much cheaper than buying cement from a concrete plant.
The length of the main road planned by Ye Mo is 2215 meters.
Road width, 3.2 meters.
In addition, three warehouses will be built on the top of the mountain, and cement dams will be needed...
"The road I use doesn't need to be done too well." Ye Ran said.
Ye Mo nodded: "15 cm thick, how about it?"
"If you want to talk about me, a thickness of ten centimeters will do."
"The main road needs to run big cars. The road surface is too thin to bear the force."
"That's 15 centimeters. The concrete floor of the warehouse site doesn't need to be too thick, 10 centimeters is fine. It doesn't have to be as thick as the road surface..."
Ye Mo took out his notebook and calculated.
Calculated at 300 yuan per cubic meter of concrete, 1 cubic meter of concrete can be paved with 6.66 square meters.
The main road is 2215 meters long, 3.2 meters wide, and 15 centimeters thick... The cost per square meter is about 55-60 yuan.These are all inclusive.
Main road, total cost: about 41.
Don't build the roads you use too well.
The concrete roads in rural areas are basically about 20 centimeters thick.Some cement will lay rebar...
On Ye Mo's side, that is to say, when picking fruits, he will drive a cart. Normally, without a cart, it is not as good as making it.
From an economic point of view, everything is enough.
In addition to the main road, the orchard also needs to trim the cement road to facilitate fruit picking, fertilizer transportation and so on.Also, by the way, Yeran's orchard will be repaired with concrete roads...
The total length of the road in the orchard is about 5.2 kilometers, the width is 2.5 meters, and the thickness is 10 centimeters (0.1 meters).
In addition, several warehouses need to be built, and the cement surface should be laid first...the total area to be paved is 1.3 square meters.The total cost is around 52.
For road construction, the cost calculated by Ye Mo here is 93.Maybe a little overspending, but never more than 100 million.
There is a prerequisite for this, the roadbed needs to be leveled by Ye Mo himself.
"It costs a lot to build an orchard," Ye Mo said.
"You need to build a concrete road yourself... If you want me to say, the main road can be built. There is not much need for the cement road in the orchard." Ye Ran said.
They have a lot of orchards here, but they don't have concrete roads in the orchards...
"If you want to do it, do it in one step, so as not to do it in the future." Ye Mo said.
Not without money.
If you have money on hand, naturally do a better job.
If it is necessary to save, if there is no need to save, there is no need to save.
Ye Mo's family has already picked all the mangoes that can be picked.
There are still 11 acres of Kate mangoes left, and the picking started at the end of September, which is still very early.
Mom and Dad went out to play cards, and they didn't come back until very late.
Ye Mo and the others checked the materials and went to bed early.
the next day.
Ye Mo went out to find the excavator master, and explained the requirements in detail, that is, leveling the roadbed...
To level the roadbed of seven or eight kilometers, the amount of work is not small.Some places have to dig mountains...
As far as the situation in the mountains is concerned, it will take at least half a month for all the roads to be cleared out, and the time given by the excavator master.
The most difficult is the road in the orchard, which requires a lot of leveling.The amount of work is a bit large.
The master of the excavator is the mayor of the town, and the current market price is soaring.If it was last year, the 20-ton machine would cost about 230 yuan per hour for one shift.Taiwan shift, a Taiwan shift refers to 8 hours...
Ye Ran told the master of the excavator the basic situation, and said: "The roads here are all leveled, how much is it?"
"This project is a bit large. The main road is okay... I have to calculate the specific amount of construction for the road in the orchard."
"That's troublesome, master."
"No trouble……"
The master of the excavator is an excavator of about 20 tons.
An excavator of about 20 tons, some excavators can dry up to 24 oil per hour...
Now that the price of diesel has reached 7 yuan, the price of excavators has also risen.
At the current oil price, it is easy for an excavator to kill 1000 yuan of oil a day.
High fuel costs mean less work for large excavators.The current excavator is easy to find.
The final negotiated price was 2000 yuan per day.How to work, Ye Mo and the others have the final say.
2000 yuan per day, 8 hours a day.The work here is at least 7 days.There is also the shipping fee for the excavator, Ye Mo and the others paid 700 yuan...
Master Wang is not only the owner of the excavator, but also the master of the excavator. 2000 yuan a day, with the current fuel costs, Master Wang can still make a profit.
(End of this chapter)
You'll Also Like
-
Demon Cultivator: Heaven and earth are the cauldron, and all living beings are the medicine
Chapter 90 2 hours ago -
Dragon's Origin
Chapter 1570 3 hours ago -
The villain queen eavesdropped on my inner thoughts and won't let me lie down?
Chapter 309 8 hours ago -
Lord Era: I, The Strongest Lord Of The Abyss!
Chapter 1659 10 hours ago -
The journey of film and television world is endless
Chapter 674 12 hours ago -
Plane Supplier: People in high martial arts, trade in the heavens
Chapter 136 13 hours ago -
You called me a demon cultivator and forced me to crawl. Why are you crying when I join the Demon Se
Chapter 397 13 hours ago -
Magic Industrial Age
Chapter 324 13 hours ago -
When the Saint comes, she does not collect food.
Chapter 759 13 hours ago -
Knight Lord: Start with Daily Intelligence
Chapter 266 13 hours ago