Behind me is the entire history of mankind!

Chapter 69 Component Engineering Team

Chapter 69 Component Engineering Team

From the beginning to the end, he and Blitz Poland also surrounded a piece of land, looking at the words on the sign inserted in that piece of land, meditating quietly.

【Build a temporary exchange】

[Requirements: Those who have the rank of second-class soldier and have construction experience can go to Da Vinci to accept the task and get guidance.

Task requirements: a [-]-square-meter wooden house with wood as the material.

For materials, you can consult Mendeleev, the person in charge of the chemical project at the origin base, or solve it yourself.

Tools can be rented from Leonardo da Vinci, the construction project leader.

Task funds: [-] large carbon coins (can be advanced in advance, can only be used for engineering, and the remaining funds will become one of the task rewards)

After the task is completed, it will be accepted by Da Vinci. If the acceptance is satisfactory, a higher task reward can be obtained. 】

Then there is the design drawing of the building and a more detailed explanation.

In addition, many small signs were inserted throughout the bastion, with various tasks on them, such as the construction of "hotels" such as "banks" and the official "auction house".

"This is directly outsourcing the project to us." He frowned from beginning to end.

"Two thousand big carbon coins!?" Blitz Poland murmured in a daze, "If I remember correctly, the big carbon coins are one-to-one with military achievements, right? Is the numerical planning correct? This is not a profit."

"It's not that simple, it's a project fund, which means that the funds required for the entire project are included in it.

You have to spend money on wood, and you can’t make it by yourself. There is also the cost of renting construction vehicles such as cranes and excavators. Now there are only a few cranes and excavators. It's very, there is labor, find three or four hundreds of dollars and go out, at least [-] carbon coins per square meter. "

"That's [-] rewards." Blitz Poland said, "That's okay, even if you share it equally with me, that person will have at least [-] carbon coins, and those tree-cutting days only cost [-] carbon coins. "

"You have to calculate the time cost. If you are not professional, it will take a month or two to build and dismantle, and the labor costs you spend will increase exponentially within this month or two. Maybe And you will lose money.”

Looking at the brand from the beginning to the end, "We don't have nails now, so we can only use the relatively primitive mortise and tenon structure to splice for easy recycling. It takes time to process wood. If we can omit the time of processing wood, we can use a crane to splice , it is not a problem to complete the outer frame within a week."

"Then we can only recruit wild gods into the group." Blitz Poland said.

"With alchemy, we can also minimize the risk." He said from beginning to end, "And the key point is that a piece of untreated wood can be sold to the base for two to four small carbon coins at most, but after the base After processing it to be able to build a house, it has to be doubled, and if there is alchemy, we can save this cost to the greatest extent."

"Aren't you going to build an internal combustion engine? How is it going?"

"It's okay. I found manganese at the foot of the mountain recently. The material should be fine. I'll ask Wild God for help later." Blitz Poland said.

Nodding from the beginning to the end, he looked at the signs on the rest of the building site, thought for a moment, and said.

"But then again, since the base infrastructure is outsourced for inspection and acceptance, then I probably know what the other ways to make money that planner said."

"How to say?" Blitz Poland asked curiously.

"Wait, I'll write a post to earn popularity by the way, but now it's urgent, we need to form a professional engineering team." From the beginning to the end, there was a little glimmer in his eyes.

"Form an engineering team?"

"Building a house requires the coordination of many aspects, such as carpentry, material procurement, calculation of project funds, and operation of excavators and cranes, etc., all need special personnel to do it.

If we start looking for a house from the beginning, or take it all down, not to mention wasting time, it is easy to be careless. It is okay to build a wooden house, but it will be difficult to build other houses in the future.Look at the requirements of the formal exchange over there. "

A formal exchange pointing to one side from beginning to end.

"With reinforced concrete as the foundation, wood as the frame and roof, tiles should be laid, hollow bricks should be used for the outer walls, and there must be a fireplace. It is required to be warm in winter and cool in summer, and the builder must obtain Da Vinci's permission.

This is obviously a relatively mainstream single-family villa construction method in foreign countries. The land here is sparsely populated, there is no need to build high-rise buildings, and there is no need to pass down four or five generations. The wood is cheap and there are not many earthquakes. This method is economical. .

This kind of building is mainly supported by wood. Hollow bricks are mainly used for heat insulation and cold protection. However, it is difficult to guarantee cerebral palsy. Hollow bricks are used as load-bearing walls. With the load-bearing capacity of hollow bricks, if two or three floors are built, it will collapse within a few days. up.

There are also many requirements for the structure of wood frame houses, such as enough diagonal bracing, otherwise the house will shake from side to side and there is a risk of collapse.

Da Vinci would definitely not feel at ease outsourcing this project to others casually.

After forming the engineering team, we can take over the rest of the projects. The more projects we complete, the more perfect and skilled the team will be, and the faster and better the house we will build.

The more Da Vinci trusts us, the bigger and more lucrative the projects received from Da Vinci will be.

When word of mouth is established, we can also train our own engineering team and start an infrastructure company. "

I was a little excited from the beginning to the end. Although he is also engaged in engineering in reality, starting a business is naturally more comfortable than being a wage earner.

The more Blitz Poland thought about it, the more excited he became. He shouted, "I'm going to recruit people right away."

"No, I'll go, anyway, I'm a professional." He said from beginning to end, "You find a way to get that internal combustion engine out, see if you can't go to Tesla to change to an alchemist, it's best to change your job , We can’t change jobs, so we will find a way to use this internal combustion engine to build excavators and cranes.

With the internal combustion engine, our engineering will be much more convenient.

Of course now we can build a crane first. "

"Can you make it?" Blitz Poland said.

"I took over the blueprints of those cranes built by Da Vinci and put them together." He said from the beginning to the end, "The drawings are still in my hands now, and they can be rented out when there is no project. It's not a loss."

"Brilliant!"

(End of this chapter)

Tap the screen to use advanced tools Tip: You can use left and right keyboard keys to browse between chapters.

You'll Also Like