After Lu Chuan returned to Haizhou City, his life was very peaceful.

The case in Dongzhou City will not be concluded in a short time. Li Donglin and the serious crime team have stayed in Dongzhou City for more than ten days and have not returned yet.

In the blink of an eye, the first month of the year has passed.

Although Haizhou City is located in the north, spring always comes earlier because it is close to the sea.

Since mid-March, the weather has warmed up and many mountain flowers have bloomed.

Although Lu Chuan has returned to the High-tech Zone Branch, he has also been paying attention to the case in Dongzhou City.

After nearly a month, the entire case was basically sorted out.

The relevant evidence for Gao Xiaoguang’s previous ten cases has also been collected.

In fact, this time is already very fast. After all, it may take more than 10 days just to identify the scene of 10 cases.

However, the trial of a specific case and the subsequent sentencing may take longer.

The main reason is that it takes too long. There are many cases involved and the families of the victims need some time to deal with everything.

It is impossible for Li Donglin and his men to stay in Dongzhou City forever.

After the entire case was sorted out and all the evidence was secured, the serious crime team was disbanded on the spot, and Li Donglin had to go back to the provincial department to report.

However, since the case has been solved, the remaining step is the subsequent judicial procedures. Li Donglin's report requesting merit has been submitted to his superiors.

The night before yesterday, Li Donglin called Lu Chuan. After submitting the job application, someone from the ministry came down to verify and communicate.

There is no doubt that he will be awarded the first-class collective merit, but Lu Chuan’s title of hero and model is still under discussion.

But judging from the information Li Donglin received, the problem might not be serious.

Lu Chuan actually doesn't care much about whether he gets promoted or not, but to be honest, Lu Chuan does care a lot about merit.

Especially this time, there is a possibility of obtaining the title of hero model, which makes Lu Chuan very excited to be honest.

However, Lu Chuan did not tell his family about this news. It would not be too late to communicate after everything is settled.

The weather became warmer at the end of March, and the High-tech Zone Branch was relatively quiet during this period, with no major cases occurring.

Lu Chuan was also happy to have the time off and went home to be with his wife and children.

The little guy was very lively and urinated on Lu Chuan quite a bit.

The incident happened on March 3th.

As spring arrives and flowers bloom, construction projects in Haizhou City have begun to start one after another.

Dongfeng Road was originally the center of Haizhou City’s old city. Although there are fewer young people living here now because of its old buildings, many locals are still accustomed to living here.

There is a Dongfeng Canal behind Zhonglu Road, which was originally a domestic drainage canal for residents on this side of Dongfeng Road.

But later, because the water was discharged into the ground, this water area was gradually abandoned. Although domestic wastewater was no longer discharged, some domestic garbage was still dumped into it.

The entire Dongfeng Canal is about 3 kilometers long. Because no one has cleaned it for a long time, the water has gradually become more and more smelly.

In recent years, it has become a smelly ditch and is basically well-known throughout Haizhou City.

In order to create a good living environment, the Haizhou Municipal Government decided last year to start cleaning up and renovating these small water channels throughout the city.

This year, the relevant municipal engineering project has already started, and the Dongfeng Canal was the first to be cleaned. However, the project was forced to stop after less than three days.

The reason was simple. Workers found three woven plastic bags when they were cleaning the sludge, garbage and debris in the pool.

If it is an ordinary plastic woven bag, it doesn’t matter.

On the first day of cleaning the Dongfeng Canal, something unknown was dug out from it. Therefore, the garbage dug out was basically not cleaned up, but directly loaded onto the garbage truck and taken away.

Originally, these three woven bags were to be loaded onto a garbage truck and transported directly to the landfill.

But the person commanding the forklift found something wrong after taking a look.

Because one of the woven bags was damaged, something stuck out from inside.

From a distance it looked a bit like an arm, so the person commanding the forklift stopped it for a moment, and went forward to take a closer look and found that it was indeed an arm.

The construction company then called the police.

After the people from the local police station arrived at the scene, they immediately cordoned off the scene because there were three woven bags, each of which was very large.

It doesn't look like it belongs to the same person.

Therefore, the police station did not take any rash action, but reported the case directly to the High-tech Zone Branch.

Now Lu Chuan has brought the criminal police brigade to Dongfeng Canal.

The three woven bags are still inside the excavated soil of the forklift. The driver is already being questioned nearby, along with some other construction personnel.

"We started construction three days ago. Everything was going well before. The construction progress has been quite fast in the past few days. According to the plan, we should complete the dredging work within this week and then start the water treatment."

The person in charge of the construction is Wang Hu.

Wang Hu has been working in municipal engineering for many years. His engineering company has connections with higher-ups and gets a lot of municipal projects every year.

Of course, today's municipal engineering projects are much more difficult than before.

Not to mention whether you can get the project, even if you get the project, the difficulty of the project is not particularly great, but the requirements are much higher.

When we were doing projects in the past, the quality requirements were not that high, and payments were made faster.

In addition, there are many other tricks involved in the project. For example, a road may be paved this year and a sewer may be built next year.

In this case, the road would have to be dug in the middle, and then the sewer would be built. After that, the other pipelines would be dug the year after.

In short, the main idea is to have no planning or design, just do whatever you think of.

It happens too often that a road becomes dilapidated every year after being in use for 10 or 8 years.

But it is no longer possible now. The requirements for municipal engineering projects are much higher, such as the cleaning of the Dongfeng Canal.

We were given a week to complete the cleanup no matter what, and then the water body had to be managed.

There is no problem with cleaning, it can be completed quickly as long as some large machinery and some manpower are used. However, cleaning the water body is more difficult.

There is basically no way to clean up the original water body, it can only be drained out and then new water bodies are introduced. Only in this way can the effect of beautiful mountains and clear waters be achieved.

But now it seems that it is impossible to complete the cleaning work of Dongfeng Canal in a week.

Now the forklift has dug out three woven bags from here, one of which has its arm still exposed. No one knows if there are other woven bags. (End of this chapter)

Tap the screen to use advanced tools Tip: You can use left and right keyboard keys to browse between chapters.

You'll Also Like