Super Copy of Great Power Technology

Chapter 225 Mobile Phone Production Capacity Issues

It is so large that it exceeds the affordability of most companies. This is why, 10 years later, more and more chip giants have abandoned their own wafer factories and turned to professional wafer foundries such as TSMC for cooperation. If you catch up with equipment upgrading or explore the next generation of process technology, you have to go through the same process again, or even several times. The cost is simply overwhelming, and there are very few foundries that can persist.

The same thing is much simpler when it comes to cheating player Qiao Ruida. The production technology can be downloaded from the browser, the equipment and raw materials required for production are copied, the labor is done by dimensional puppets, and even the venue is provided by dimensional puppets. Space replacement, combined, the cost of the whole process is basically zero, and it only requires Qiao Ruida to invest some leisure time and energy to complete it.

Just like this, a month has passed, and the pass rate of the 5nm chip production line in the dimensional space has increased to 15%. This number is still very low, but it has improved a lot compared to the 0.1% at the beginning. At the same time, the second-generation Ruida mobile phone has completed all optimization and testing processes and has begun mass production. Due to the limited chip production capacity of Ruida Electronics Factory, the early production speed of mobile phones was somewhat slow. After the second-generation Reda mobile phone was finalized, Qiao Reda gave colleagues in the R&D department a month-long paid holiday. During the development of Kaitian Systems and Ruida second-generation mobile phones, these R&D personnel worked day and night, and overtime became commonplace. Many single colleagues even moved folding beds into the laboratory and ate and slept in the company, just to squeeze in a few hours every day for work. It is said that there is relaxation and relaxation, the way of civil and military affairs. Now that the research and development tasks are completed, it is also appropriate to give colleagues in the research and development department a long vacation to let them relax.

Two months have passed, and the pass rate of the 5nm chip production line in the dimensional space has increased to 40%, which is a rapid progress. In a real wafer foundry, the chip yield rate reaches 40% and can be put into actual production. As long as more foundry fees are charged, it can still be profitable. Due to insufficient stock, the second-generation Reda mobile phone has not yet been released. The Reda Electronics Factory is still working overtime to produce chips and mobile phones. The first generation of Reda mobile phones have been discontinued for too long, and all the phones in stock have been sold out.

In the past three months, the R&D department of Reda Technology Company has been undergoing rapid expansion, recruiting a large number of new talents, covering chip design, software development, communication technology, laser technology, precision machinery, automation, chemical industry, and electrical engineering. Chemistry and many other fields. In less than half a year, the R&D department of Reda Technology has grown from a few hundred R&D staff and a dozen R&D projects to tens of thousands of R&D staff and hundreds of R&D projects. R&D investment has skyrocketed hundreds of times. Of course, the effect of this operation is also immediate. Tens of billions of R&D funds have been invested, and various advanced technologies have been developed like a blowout. There are thousands of patents applied for and thousands of papers published, covering wireless communications, chip IP core, chip processing, photolithography machines, photoresists, batteries, artificial intelligence and many other aspects. Of course, only the person in charge, Qiao Ruida, knows how many of these patents were actually developed by the company's researchers and how many were obtained by cheating from the future.

After the Chinese New Year, several domestic manufacturers launched their own smartphone products, among which Lenovo, Coolpad, ZTE, Meizu, etc. have the best sales. These companies are either major mobile phone manufacturers that have existed in the era of feature phones, or they are upstarts that have emerged in the era of smartphones. They are very good in terms of technical strength and sales channels. Once their smartphone products were launched, they seized a large amount of market share, compressing the living space of rice, Ruida, and many foreign mobile phone brands that entered the market earlier. If Reda Mobile Phone wants to get out of the predicament and maintain its existing market share, it must solve the chip production capacity problem as soon as possible and release the second-generation Reda Mobile Phone.

At an internal meeting of Redar Technology, some company executives also proposed to restart the production of Redar's first-generation mobile phones, or find TSMC and four-star wafer foundries to produce Kyushu No. 1 chips to speed up the second-generation Redar. The launch process of mobile phones ensures the market share of Reda mobile phones. However, these proposals were suppressed by Qiao Ruida. The reason is also very simple, because the Rockchip wafer factory jointly invested and built by Ruida Technology Company and Shengshi Investment Company has completed the construction of the first phase of the project. The installation of chip production equipment is in progress and will be put into production soon. At that time, the production problem of Jiuzhou No. 1 mobile phone processor can be completely solved. With the chip, the problem of insufficient production capacity of Ritar's second-generation mobile phone will be easily solved.

Before we knew it, May 5 came, and Peking University had a seven-day long holiday. Qiao Ruida drove a Mercedes-Benz commercial vehicle, carrying her girlfriend Du Qingqing and teacher Zhou Wanda back to Decheng City. Zhou Wanda is a teacher and professor in the integrated circuit major at Peking University, and is also a researcher at the Peking University Chip Laboratory.

Zhou Wanda once served as Peking University's admissions officer in Beihe Province. In the year when Qiao Ruida took the college entrance examination, Qiao Ruida's Peking University pre-admission agreement was signed after consultation with Zhou Wanda. This time, Teacher Zhou Wanda followed Qiao Ruida and his team to Decheng City. At the invitation of Rockchip Wafer Factory, he completed the installation and subsequent debugging of the chip production line. Also invited were most members of the Peking University Chip Laboratory, including Academician Wang Chengye. However, those old professors were older and could not bear the bumps. Most of them chose to take the train to Decheng City. Only Zhou Wanda and dozens of younger researchers chose to travel with the convoy.

Yes, you read that right, there was a long motorcade behind Qiao Ruida's Mercedes-Benz. This fleet consists of three business cars, one bus, and 53 container trucks. A huge convoy was traveling on the highway, nearly a kilometer apart. It was really roaring with engines, mighty and majestic.

"I'm talking to Qiao Ruida, what are the things in the truck behind us? It's shockproof and air-conditioned. The most advanced DUV lithography machine isn't that expensive, right?" Sitting in the back seat of the car Zhou Wanda asked curiously.

"Haha, keep it secret for the time being. When you unload the truck in Decheng City, you will know what it is. I guarantee it will surprise you." Qiao Ruida replied pretending to be mysterious. (End of chapter)

Tap the screen to use advanced tools Tip: You can use left and right keyboard keys to browse between chapters.

You'll Also Like