Power career

Chapter 251: Building the road with all my strength

Power and Official Career - Chapter [-]: Building Roads with All Effort

There is no airtight wall in the city. Although the Standing Committee of the Provincial Party Committee has strict discipline, the matters decided at the meeting cannot be leaked.But basically, discipline belongs to discipline, and those who want to speak out are still rumors.

Just after the meeting of the Standing Committee of the Provincial Party Committee, Xizhou official circles have already spread rumors that Sidaogou Town has been identified as a pilot area for changing the economic development mode of the province, and has also been upgraded to a provincial economic and technological development zone.

For such rumors, Lu Yan was skeptical at first.The fact that Sidaogou Town was identified as a pilot area for changing the economic development mode in the whole province was still very reliable in Lu Yan's view.As for the latter one, which was upgraded to a provincial economic and technological development zone, Lu Yan felt that someone must be spreading rumors.

The reason why I think this way is because I haven't heard even a little bit of news about "upgrading" before.According to the official practice, if such a thing happens, at least Ren Jianjun will hear a little bit of news in advance, but now there is no sign, and Lu Yan really can't believe such a decision.

It wasn't until the third day after the Standing Committee meeting of the Provincial Party Committee that Gao Jia called to mention the matter of the Economic and Technological Development Zone in a roundabout way, that Lu Yan felt that this matter was not groundless.

With Gao Jia's identity and status, saying such words must not be aimless.Moreover, Gao Jia is a very cautious person. Although he didn't speak very clearly, Lu Yan could hear from his words that the "upgrading" of Sidaogou Town seemed to be a certainty now.

Later, when Lin Zhijie talked about this matter again, Lu Yan knew that this matter was definitely a foregone conclusion.Lin Zhijie got the news from a friend of the Provincial Development and Reform Commission. The Standing Committee of the Provincial Party Committee instructed the Provincial Development and Reform Commission to draft relevant documents on upgrading Sidaogou Town to a provincial-level economic and technological development zone.Now it has been confirmed that the rumors in the market are true.

However, Lu Yan was very indifferent to the promotion of Sidaogou Town.In fact, no matter whether it is promoted or not, Sidaogou Town itself has a lot of power since it was listed as a pilot area for changing the mode of economic development.Especially in the area of ​​approval authority, the authority of some pilot districts is greater than that of Hongchuan County.

On the other hand, Lu Yan himself is also a person who is indifferent to fame and wealth. He does not attach so much importance to getting promoted and getting rich like some cadres.In his opinion, no matter what position he is in, as long as he can truly display his talent, it is fine.In fact, if he was really a person who valued power and position, he would not choose to go to Sidaogou Town to take a second job to exercise.

Moreover, during this period of time, Lu Yan really didn't have the energy to think about these things.

During this period of time, the development of Sidaogou Town has entered a fast lane.Except that the previous Sidaogou cement plant has been completed and put into operation, and the supply of cement is now in short supply.The CICC Jieling Gold Mine Project has completed 80% of the civil works, and equipment commissioning is also in progress. It is expected to be officially put into operation by the end of June.

Now the biggest problem facing CICC's Jieling Gold Mine is the traffic problem.Mining is a very large project, not only in terms of equipment, but also requires some large-scale mechanical operations, and the transportation task is also heavy.Now Sidaogou Town only relies on the original old road to the outside world, which is far from meeting the needs of CICC after it is put into operation, so it also objectively affects the progress of the project.

The drinking water production project of Longhua Group is now basically ready for production.Qin Ruonan and Zhang Xilan came here once respectively, and carefully inspected the construction progress of the project and the protection of water sources. They are still very satisfied with the work done by Sidaogou Town during this period.

The peak season for beverage sales is about to enter, and the drinking water plant invested by Longhua Group in Sidaogou Town has already made all preparations for production. The only thing waiting is the completion of the two roads in Sidaogou Town.

After all, drinking water production is different from other industries. Although Sidaogou Town has unique natural conditions, the water quality is also very good.But the drinking water industry is still a very market-dependent industry. Although the "Longhua" brand is very bright, if the traffic situation in Sidaogou Town is not resolved, the drinking water produced cannot be shipped outside, and good economic benefits will still not be seen. .

Coupled with several real estate projects in Sidaogou Town, they are now also trapped by the traffic conditions in Sidaogou Town.

The road problem was not particularly obvious before, but now it has become the most important factor restricting the economic development of Sidaogou Town.Lu Yan called the town team members to hold several meetings one after another, and mentioned the issue of road construction as the top priority of Sidaogou Town at present.All the members of the town team implement sub-contracting. There are four people on each of the two roads under construction. They eat and work at the construction site, and fully promote the construction of the project.

However, Lu Yan put his main energy on coordination, and coordinated and solved the problems that occurred during the road construction process as soon as possible.

The Hongchuan County Party Committee and County Government also gave strong support to the construction of these two roads. Ren Jianjun specially organized a meeting of the Standing Committee of the County Party Committee and arranged for the deployment of relevant departments in the county to open up a "green channel" for the road connecting Sidaogou Town.County magistrate Wang Xueshi led the transportation, development and reform, construction and other departments to go to the road construction site several times to coordinate and solve problems.

The investors in the construction of the two roads, CICC Group and Longhua Group, are also very strong. In order to speed up the progress of the project, they have successively increased investment in road construction, and the guarantee of logistics services is also in place.

Another good news is that within the scope of the construction of the two roads, the issue of land acquisition and demolition is not much involved.Although the topographical conditions along the line are relatively complicated, the current technical conditions can already solve these problems, coupled with the guarantee of funds in place, so the progress of the project has not been affected by this.

However, the pursuit of speed is one aspect, and Lu Yan did not relax the quality requirements of road engineering at all.In Lu Yan's opinion, after the completion of these two roads, they will serve as a strong guarantee for the economic development of Sidaogou Town in the future, so they must not be sloppy.

While grasping the progress of the project, there is another task of "supervising" the team members of Sidaogou Town, which is to supervise the construction unit of the project to ensure the quality of road construction.Lu Yan didn't want to see such laborious road repairs just to meet immediate errands, repairing and repairing within a few years of opening to traffic.

After the concerted efforts of the top and bottom, the construction speed of the two roads connecting Sidaogou Town to Hongchuan County is quite fast.In mid-May, the main construction of the two highways has been completed, and the whole line is connected. The next step will be to enter the later stage of construction such as paving the surface, guardrails, and green belts.

Tap the screen to use advanced tools Tip: You can use left and right keyboard keys to browse between chapters.

You'll Also Like