Rebirth of the 80s New Farmer
Chapter 142 Signing a Contract
Chapter 142 Signing a Contract
In 1980, the main streets in Hongya County had hardened. Although they were a bit uneven, the hardness was still very good.
This time the cement tile was finally broken on the asphalt road, but it did not fall apart as Zhou Bingde expected, but only two cracks appeared.
Apart from these two cracks, the tile is relatively intact.
"interesting!"
Zhou Bingde picked up the tile and broke it, and then saw thin iron wires in the cracks of the tile.
"No wonder it's so strong."
"This is a special steel wire tile we produced, but the cost of this kind of tile is more expensive than ordinary tiles, and it costs a penny."
Zhou Bingde threw the broken tiles to the side of the road: "Now that we've talked about the price, let's talk about the price of these tiles."
"There are two types of cement tiles produced in our brick and tile factory. Ordinary tiles cost eight cents a piece, steel wire tiles cost nine cents a piece, and ridge tiles cost six cents a piece. Don't listen to the price, but it is as expensive as butterfly tiles in application. There is little difference in cost per square meter."
"I understand this, I am very satisfied with your tiles, I want it!"
Hearing these words, a stone in Wan Feng's heart finally fell to the ground. No matter what, he finally sold a product, and today was not in vain.
"Our company is now building a factory building for the plumbing equipment factory, a dormitory for the electrical machinery factory, and several factory buildings. The roof area is about...Old Zhang! Call Xiao Liu here."
The old man staggered into the yard.
"The tiles are all right now, let's see your bricks."
As for the red brick Wan Feng brought, Zhou Bingde just glanced at it, touched it with his hand, then threw it aside and didn't pay attention anymore. On the contrary, he showed enough interest in Wan Feng's cement brick.
Cement bricks are definitely new to Zhou Bingde.
"How many bricks can your brick and tile factory produce in a month?"
"Red bricks are 6 yuan, and cement bricks are probably not. If everything is needed, it is not a problem to produce 15 yuan a month."
This is considered bragging.
"Only so many red bricks are produced in a month? Do you know how many red bricks Gaoyang Brick Factory produces in a month?"
"This is incomparable. Our brick kiln only has six holes, and [-] is the limit."
Zhou Bingde thought for a while: "Anyway, there are only [-] bricks a month. As long as the quality is acceptable, I can get all of them. I want to see how the cement bricks are."
Wan Feng was overjoyed, he sold the same thing again and it was considered reimbursement, he did not expect Zhou Bingde to be so righteous.
"Thank you very much, Uncle Zhou, you have really helped our small factory a lot."
"Cut! I'm not helping you. I'm afraid that if I don't want your products, my old man will come to you to buy melons one day. If you go ahead and slander my old man, my old man will beat me up."
"Ah! Is the old man so powerful?" Wan Feng really didn't think about it.
Zhou Bingde had lingering fears: "Stop asking this question, come here, Xiao Liu, and calculate the roof area of all our projects?"
The girl named Xiao Liu was an ordinary-looking girl, wearing a pair of myopia glasses and dragging over with a thick ledger in her hand.
"Factory manager! The total roof area of these projects we built is more than 3000 square meters."
"How many square meters need tiles?"
Xiao Liu flipped through the notebook in his hand again: "More than 7000 square meters."
"Okay, you go back."
After Xiao Liu left, Zhou Bingde turned to Wan Feng: "I heard that, boy, do you calculate how many tiles are needed for [-] square meters? Can your factory produce them?"
One level needs nine flat tiles, and 15 square meters needs... [-] pieces!
Wan Feng was dumbfounded. Even if his uncle was exhausted, he still couldn't produce so many tiles.
There are more than 20 people in their cement tile team, who are divided into mixing, tile making, and transportation. They can only produce [-] pieces in one day because they only have [-] sets of molds.
Moreover, after these molds are glued with cement, they have to undergo a minimum of 24 hours of hardening before they can be separated from the tiles before they can enter the second cycle.
There are fewer paralyzed molds. Last time, a thousand sets should be made at one time. This time I am dumbfounded.
Let Xiao Dexiang process the mold immediately after returning home, at least one thousand pieces a day.
But even if it is like this, it can’t be done. There are only 15 pieces a month, which is a task of [-] pieces!
"Is there a time limit?"
"November can't be passed, because Shangwa's climate will be too affected after the cold weather."
Now it is mid-July, assuming that it will only be more than four months until the end of November, and they will not be able to produce [-] tiles at all.
Wan Feng sighed: "We can't produce 15 tiles, we can only produce [-] tiles."
[-] pieces is what Wan Feng is bragging about, and they can't produce this number at all.
Hold on first.
"One hundred thousand is fine!"
In order to avoid long nights and dreams, Wan Feng directly proposed to sign the contract, and the place to sign the contract was a restaurant called Sijixiang on this street.
The representatives of Party A are Zhou Bingde and Yijian, who have a role similar to a secretary and may be a deputy factory director. Judging from Zhou Bingde's direct agreement to sign the contract, Zhou Bingde is still very strong in Yijian, and there is no need to hold meetings to discuss anything. .
Party B's representative in charge of signing is Xia Qiulong, and Wan Feng is his assistant.
The reason why Wan Feng asked Xia Qiulong to be the representative of Party B was that in case of any disputes in the future, Xia Qiulong's power was far greater than his, and Xia Qiulong's presence in Hongya would be much more useful than his own.
Even if Xia Qiulong was used as a spear.
Of course it wasn't in vain. Although Wan Feng negotiated today's contract, the agreement between him and Xia Qiulong still counts. They will have a [-]% share for every brick and tile sold.
Wan Feng ordered ten hard dishes, and the three on the other side and the three on his side couldn't finish the ten dishes.
The next step was the drafting of the price and the agreement. The agreement between pushing the cup and changing the cup was negotiated one by one, and the two parties quickly signed the contract.
According to the contract, the Wahou Brick and Tile Factory supplies 5 yuan of red bricks per month, regardless of the specific grade, and the calculation includes freight.The monthly supply of cement tiles should not be less than [-] pieces, and each piece includes nine cents of freight, including some steel wire tiles. The brick and tile factory is responsible for delivering the goods to the destination. quality.
Finally, if the compensation provisions of both parties to the contract cannot be fulfilled.
All of this was what Wan Feng insisted on. Although there was still a blank state in terms of contracts in the country during this period and they might not necessarily have any legal effect, there was evidence in black and white that even if something went wrong, there would be proof.
As for the delivery time, as long as it can be delivered between [-]:[-] am and [-]:[-] pm.
Although this contract is very sloppy compared with the contracts of later generations, it was considered a formal contract in 1980, and both parties who signed the contract had basic guarantees.
After the contract was signed and the wine was almost finished, after Wan Feng settled the bill, the two parties shook hands and said goodbye in a friendly atmosphere.
(End of this chapter)
In 1980, the main streets in Hongya County had hardened. Although they were a bit uneven, the hardness was still very good.
This time the cement tile was finally broken on the asphalt road, but it did not fall apart as Zhou Bingde expected, but only two cracks appeared.
Apart from these two cracks, the tile is relatively intact.
"interesting!"
Zhou Bingde picked up the tile and broke it, and then saw thin iron wires in the cracks of the tile.
"No wonder it's so strong."
"This is a special steel wire tile we produced, but the cost of this kind of tile is more expensive than ordinary tiles, and it costs a penny."
Zhou Bingde threw the broken tiles to the side of the road: "Now that we've talked about the price, let's talk about the price of these tiles."
"There are two types of cement tiles produced in our brick and tile factory. Ordinary tiles cost eight cents a piece, steel wire tiles cost nine cents a piece, and ridge tiles cost six cents a piece. Don't listen to the price, but it is as expensive as butterfly tiles in application. There is little difference in cost per square meter."
"I understand this, I am very satisfied with your tiles, I want it!"
Hearing these words, a stone in Wan Feng's heart finally fell to the ground. No matter what, he finally sold a product, and today was not in vain.
"Our company is now building a factory building for the plumbing equipment factory, a dormitory for the electrical machinery factory, and several factory buildings. The roof area is about...Old Zhang! Call Xiao Liu here."
The old man staggered into the yard.
"The tiles are all right now, let's see your bricks."
As for the red brick Wan Feng brought, Zhou Bingde just glanced at it, touched it with his hand, then threw it aside and didn't pay attention anymore. On the contrary, he showed enough interest in Wan Feng's cement brick.
Cement bricks are definitely new to Zhou Bingde.
"How many bricks can your brick and tile factory produce in a month?"
"Red bricks are 6 yuan, and cement bricks are probably not. If everything is needed, it is not a problem to produce 15 yuan a month."
This is considered bragging.
"Only so many red bricks are produced in a month? Do you know how many red bricks Gaoyang Brick Factory produces in a month?"
"This is incomparable. Our brick kiln only has six holes, and [-] is the limit."
Zhou Bingde thought for a while: "Anyway, there are only [-] bricks a month. As long as the quality is acceptable, I can get all of them. I want to see how the cement bricks are."
Wan Feng was overjoyed, he sold the same thing again and it was considered reimbursement, he did not expect Zhou Bingde to be so righteous.
"Thank you very much, Uncle Zhou, you have really helped our small factory a lot."
"Cut! I'm not helping you. I'm afraid that if I don't want your products, my old man will come to you to buy melons one day. If you go ahead and slander my old man, my old man will beat me up."
"Ah! Is the old man so powerful?" Wan Feng really didn't think about it.
Zhou Bingde had lingering fears: "Stop asking this question, come here, Xiao Liu, and calculate the roof area of all our projects?"
The girl named Xiao Liu was an ordinary-looking girl, wearing a pair of myopia glasses and dragging over with a thick ledger in her hand.
"Factory manager! The total roof area of these projects we built is more than 3000 square meters."
"How many square meters need tiles?"
Xiao Liu flipped through the notebook in his hand again: "More than 7000 square meters."
"Okay, you go back."
After Xiao Liu left, Zhou Bingde turned to Wan Feng: "I heard that, boy, do you calculate how many tiles are needed for [-] square meters? Can your factory produce them?"
One level needs nine flat tiles, and 15 square meters needs... [-] pieces!
Wan Feng was dumbfounded. Even if his uncle was exhausted, he still couldn't produce so many tiles.
There are more than 20 people in their cement tile team, who are divided into mixing, tile making, and transportation. They can only produce [-] pieces in one day because they only have [-] sets of molds.
Moreover, after these molds are glued with cement, they have to undergo a minimum of 24 hours of hardening before they can be separated from the tiles before they can enter the second cycle.
There are fewer paralyzed molds. Last time, a thousand sets should be made at one time. This time I am dumbfounded.
Let Xiao Dexiang process the mold immediately after returning home, at least one thousand pieces a day.
But even if it is like this, it can’t be done. There are only 15 pieces a month, which is a task of [-] pieces!
"Is there a time limit?"
"November can't be passed, because Shangwa's climate will be too affected after the cold weather."
Now it is mid-July, assuming that it will only be more than four months until the end of November, and they will not be able to produce [-] tiles at all.
Wan Feng sighed: "We can't produce 15 tiles, we can only produce [-] tiles."
[-] pieces is what Wan Feng is bragging about, and they can't produce this number at all.
Hold on first.
"One hundred thousand is fine!"
In order to avoid long nights and dreams, Wan Feng directly proposed to sign the contract, and the place to sign the contract was a restaurant called Sijixiang on this street.
The representatives of Party A are Zhou Bingde and Yijian, who have a role similar to a secretary and may be a deputy factory director. Judging from Zhou Bingde's direct agreement to sign the contract, Zhou Bingde is still very strong in Yijian, and there is no need to hold meetings to discuss anything. .
Party B's representative in charge of signing is Xia Qiulong, and Wan Feng is his assistant.
The reason why Wan Feng asked Xia Qiulong to be the representative of Party B was that in case of any disputes in the future, Xia Qiulong's power was far greater than his, and Xia Qiulong's presence in Hongya would be much more useful than his own.
Even if Xia Qiulong was used as a spear.
Of course it wasn't in vain. Although Wan Feng negotiated today's contract, the agreement between him and Xia Qiulong still counts. They will have a [-]% share for every brick and tile sold.
Wan Feng ordered ten hard dishes, and the three on the other side and the three on his side couldn't finish the ten dishes.
The next step was the drafting of the price and the agreement. The agreement between pushing the cup and changing the cup was negotiated one by one, and the two parties quickly signed the contract.
According to the contract, the Wahou Brick and Tile Factory supplies 5 yuan of red bricks per month, regardless of the specific grade, and the calculation includes freight.The monthly supply of cement tiles should not be less than [-] pieces, and each piece includes nine cents of freight, including some steel wire tiles. The brick and tile factory is responsible for delivering the goods to the destination. quality.
Finally, if the compensation provisions of both parties to the contract cannot be fulfilled.
All of this was what Wan Feng insisted on. Although there was still a blank state in terms of contracts in the country during this period and they might not necessarily have any legal effect, there was evidence in black and white that even if something went wrong, there would be proof.
As for the delivery time, as long as it can be delivered between [-]:[-] am and [-]:[-] pm.
Although this contract is very sloppy compared with the contracts of later generations, it was considered a formal contract in 1980, and both parties who signed the contract had basic guarantees.
After the contract was signed and the wine was almost finished, after Wan Feng settled the bill, the two parties shook hands and said goodbye in a friendly atmosphere.
(End of this chapter)
You'll Also Like
-
Abnormal Food Article
Chapter 231 1 days ago -
Disabled Mr. Zhan is the Child’s Father, It Can’t Be Hidden Anymore!
Chapter 672 1 days ago -
Evergreen Immortal.
Chapter 228 1 days ago -
From a family fisherman to a water immortal
Chapter 205 1 days ago -
Lord of Plenty
Chapter 327 1 days ago -
I was a tycoon in World War I: Starting to save France.
Chapter 580 1 days ago -
Crossing the wilderness to survive, starting with a broken kitchen knife
Chapter 216 1 days ago -
With the power of AI, you become a giant in the magic world!
Chapter 365 1 days ago -
Type-Moon, I heard that after death, you can ascend to the Throne of Heroes?.
Chapter 274 1 days ago -
Depressed writers, the whole network begs you to stop writing
Chapter 241 1 days ago