legendary boss

Chapter 318 Entering the Desert

Chapter 318 Entering the Desert
The huge machine was hoisted off the truck and placed in the designated position smoothly. Dozens of workers began to connect the pipes according to the drawings. These are all ready-made things, and there is no pressure, so the installation is very fast.

After the first machine was installed, Lin Feng ordered to open the valve, and the seawater flowed in through the underground tunnel. He turned on the purifier, and with a low roar, the water outlet began to rush out clean water.

Someone took some from a kettle, and after a simple test, it was found that it was almost close to the standard of pure water, and it could be drunk directly.

There are hundreds of tiny pipes extending from the machine, and powder and crystals are constantly sprayed out. These are minerals separated from seawater.

"Okay, okay!" Looking at this scene, the old man couldn't help feeling relieved, "How many more projects like this can we save, how much resources can we save every year, and how much environmental pollution can be reduced? We must vigorously promote it in the future!"

With the words of the old man as an endorsement, Lin Feng believes that at least in a few years, he will not have any problems with this project.

Representatives of many large enterprises also came to the scene, all of whom were planning to buy various minerals. When the old man left, everyone eagerly took samples.

"The purity is almost 100%!"

"M's, I will never worry about not being able to buy good raw materials in the future!"

"We have signed this contract, no one will rob me!"

Han Minghao was surrounded by dozens of people in an instant, and fell into the ocean of ordering contracts.

Installation work is still going on, probably well into the night.Lin Feng was not in the mood to keep watching, so he drove to the beach.

Pollution in Bohai Bay is relatively serious, because it is surrounded by land on three sides, and the circulation of sea water is not very smooth.But don't worry now, as he draws a large amount of seawater from here, more fresh seawater will flow in, which should be able to alleviate the pollution of the bay.

There are many places on the beach that are empty, because of the sea water, many of them are saline-alkali land, and some are covered with gravel, where no food can be grown.

After finishing the seawater separation and purification plant, he will ask Han Minghao to try to contract these places as well, and then build a solar power station.

"What's over there?"

Lin Feng pointed to the sea in the distance, a bridge built on the beach and asked.

"That is to build a bridge across the sea."

"Where?"

"Dalian."

Lin Feng nodded. He had heard of this before, but no work had been started.

"But it is not needed now. The subsea tunnel has been opened, and it was opened to traffic years ago. Not only to Dalian, but also to Weihai, QHD, Yantai, and Yingkou. Now the sea water is already extending in all directions. I heard that there is also an undersea overpass. , do you want to take you to feel it?"

"You don't need to feel it, just build it well."

This is not just a question of how much money Lin Feng can make through these tunnels.

How difficult is the cross-sea bridge, it takes too much resources and time, and it is not safe enough.It is also a kind of merit to be able to use the subsea tunnel to benefit the people here.

On the second day, all the seawater separation and purifiers had been installed in place, and the next thing needed was to complete the external workshop and arrange the management team.

These are Han Minghao's affairs, and he has dispatched some management personnel from Rongcheng to take charge.

The matter here was almost over, and Lin Feng hurried back to Rongcheng again.

Flying is something that makes him feel uncomfortable. It is not that the civil aviation plane is uncomfortable, but that the delay is too serious.

It was past three o'clock in the afternoon when we arrived in Rongcheng, and a group of people from Lin's Village were already waiting at the gate of his villa.

After arranging everyone's accommodation, Lin Feng hurriedly sensed the military garrison again.The entrance to the tunnel leading to the Taklimakan Desert is in the station, and the two special trains that have been built are quietly stopping there.

Both of these special trains have only eight carriages, two of which are passenger carriages, and the rest are cargo containers.In a short period of time, there are too many materials that need to be transported to the desert.

Just the living consumption of more than 1000 people is a huge amount of material.

The general commander in charge of the construction project is Ma Gong. He has been very busy recently. After handing over the project here to Lin Feng, there are still dozens of underground high-speed trains across the country waiting for him to command.

What is being loaded onto the train is a shield machine, special processing equipment for supramolecular polymer materials, large diesel generators, diesel oil, and then tents, quilts, food, clean water, etc. In Taklimakan this season, the temperature is still several degrees below zero. speed, and the wind and sand continued.

It is a very hard work to build here.

But we can't wait any longer, once spring really comes, the wind and sand will be even bigger, and everything can be drowned overnight, while the summer is full of high temperatures.

So I would rather be cold than suffer from heat.

The opposite station has also been built. It is located on the edge of the desert, surrounded by Gobi and grasslands, and the climate is relatively stable.

Seeing that everything was proceeding in an orderly manner, Lin Feng felt relieved.

The next day, he took 30 people from Linjia Village and set off on the high-speed train.In less than an hour, everyone has come more than 1000 kilometers away.

The howling cold wind is like a ghost crying. Although the sky is clear, the sun seems to have no temperature at all, making people feel no warmth.

The people of Linjia Village, who are accustomed to the climate in Bashu, were all shivering from the cold. In less than an hour, their faces were dry and cracked by the cold wind.

Lin Feng asked someone to set up a tent. This is just the edge of the desert, with wind but no sand.When you enter the center of the desert tomorrow, the taste will be sour.

"Lin Feng, how do we get there?" asked his cousin, "We can't drive in the desert, and we don't have a car. There are so many supplies, we don't even have a crane."

"Don't worry, you settle down where you live first, and I'll figure out the rest."

He has already ordered a super construction machine in the universe mall, and it seems that the time is coming soon.

At around 10 o'clock, a huge steel figure walked over from the depths of the desert.

This is a huge machine with eight long legs, over 100 meters high, it looks like a huge monster from a distance, Lin Feng called it a big spider.

In its center is a multifunctional platform that can provide lifting, storage and delivery functions.

This is probably the least technologically content of all the products Lin Feng bought.So it's not too expensive. Together with the super battery that can last for two years, the price of one is only 10 billion.

But don't underestimate this kind of thing, it can play a huge role in the preliminary engineering.

"This machine is so big!"

When the big spider came to the front, everyone was stunned.

300 meters, which is as high as a 100-story building, with eight long legs spread out, at least a thousand meters in span, and each step is 600 meters!
Lin Feng took the elevator to the control room, lowered the hook and put all the things in the train in the big spider's warehouse, it only took an hour or two.

"That's all for today, everyone go to bed early, we will set off at midnight."

 happy national day everyone

  
 
(End of this chapter)

Tap the screen to use advanced tools Tip: You can use left and right keyboard keys to browse between chapters.

You'll Also Like