Vol 2 Chapter 1590: .High-rise buildings on flat ground
Qin Shiou asked: "Don’t you need to dig out a basement? I didn’t see a basement?"
Shaq shook his head and explained: "No, BOSS, you can't have a basement. This is not a villa, but a three-story building. The foundation must be firm and solid, otherwise there will be frequent winds by the sea and unstable foundations will cause problems!"
This is the first shortcoming of Canadian wooden houses. It is not protected from hurricanes. North America is a hurricane-prone area. The South Atlantic and South Pacific are more severe than the northern seas. Therefore, we often see TV reports of hurricanes in the United States, and then hurricanes or tornadoes. After crossing the border, the houses everywhere were broken into pieces of wood.
Qin Shiou’s first winter in Canada, he encountered a hurricane when he went to St. Lawrence Bay to fish for lobsters. At that time, the coastal port cities were almost in ruins, and the Basque Port was seriously damaged.
But this is good in Canada. There are not many hurricanes and tornadoes, much less than the United States.
In addition, this kind of wooden house has another disadvantage that it is not fireproof. Once it catches fire, there is no way to put out the fire. The people inside can run away. The property and house must be burnt to coke anyway.
Therefore, when Qin Shiou bought fire-proof rocket launchers and fire-fighting rocket launchers under the name of a small town to put out fires, they all passed the audit. Say goodbye to small towns like the town living alone overseas. Fire fighting is a big problem. St. Johns can’t count on it. On your own.
But it’s good to live by the sea. The air is humid and fire is generally not easy to happen. Even if there is a fire, it can bring the water source to fight the fire in time.
Qin Shiou nodded to express his understanding, and said, "Come on, Shaq. I'll help with the work."
Shaq looked around, then gave him a nail gun, and asked him to learn from Zach to fix the wooden square on the concrete floor, and said: "Here are construction drawings. And I will draw the line in front, you follow the line. That's it."
After the wooden squares are fixed, start to install the foundation wall along the wooden squares. These wooden squares act as a wedge. The wooden board can fit together with it.
The load-bearing wall on the first floor was built first, followed by other walls. After they were all built, they did not rush up the second floor, but used electric drills to drill various holes in the wood, discussing where to make holes, Wherever there is a crack, put on various wire covers, and then you will have to run the line in the future.
The bull lead then began to deal with the ceiling. This requires the use of soundproofing panels. Put a layer of soundproofing board first, then the high-strength composite floor on the second floor, and then put a layer of soundproofing board on top.
Sea monster and Shaq lead people to work on the kitchen and bathroom on the first floor respectively, which are the most complicated and important.
Qin Shiou followed to see that the construction of the kitchen was relatively easy, and the most important thing was the water pipes and wiring. The upper and lower water pipe systems are more complicated. They can release two kinds of cold water and hot water, and they also need to be able to discharge sewage smoothly.
The sewage pipes are ready-made. They were saved when the foundation was laid. Just connect them. Shake poured a basin of water into the pipe. The outlet of the pipe was at the seaside and directly into the sea. Geng Junjie ran over and nodded and said: " No problem, the water is flowing out."
Next is to connect the line. This fisherman is also good at it. Because they usually handle the wiring at home, there are traces to follow, and you can master it after doing it a few times.
Complicated in the bathroom, the sea monster is busy with five fishermen. Like the kitchen, water pipes, sewage pipes, hot water pipes, cold water pipes and various circuits are needed here. In addition, septic tanks will be built.
Qin Shiou said, “What’s so complicated about it, can’t it just go to the seaside?”
The sea monster smiled bitterly: "Boss, did you see that there is still two kilometers away from the sea? What if the pipeline is blocked in the future? The pipeline of the Health Bureau is easy to block."
Qin Shiou nodded in agreement, and said: "That's right, I often have constipation, and the **** is harder and easy to block."
After hearing this, the fishermen laughed, and then all made a disgusting expression, and said: "Don't disgust us, BOSS, please go ahead and leave it to us."
He is naturally joking. There is a characteristic of Canadian houses. People handle food in the kitchen, but in the end, some things are dumped into the Health Bureau. Therefore, the Health Bureau pipes should not only be large and wide, but also easy to maintain. It is indeed easy to block.
The sea monster called Weir. After consulting the experts, he chose a location for the fishermen to dig pits for disposal. They said to build a septic tank there, and then asked Weir to install a biogas conversion facility. Use biogas to cook.
Qin Shiou asked you to let me do the work, what would I do? The bull beckoned and said, "BOSS, you can fill the dehumidifier."
The biggest problem with the house by the sea is that it is too humid, which will easily cause the wood to rot, so it is necessary to do a good job of dehumidification, usually a dehumidifier + dehumidifier, install a dehumidifier in the house, pour the dehumidifier and dry it in the middle of the board at the beginning of the house. Agent.
The construction of the septic tank requires the use of large percussion drills, because the foundations of the small buildings are very wide, and the more than 1,000 square meters of the ground are all poured with cement and reinforced concrete. The purpose is to build a good foundation-no way. The seaside geology is not good, so don't enlarge the area of the foundation a bit, it will be fun in case the ground sinks or collapses.
The power of the large percussion drill is very strong. It is specially used to drill granite and the like. It can also be drilled in reinforced concrete. This thing is a bit like an electric drill magnified several times. It is about one meter high and weighs forty kilograms. After that, he roared and slammed into the ground.
As the pieces of cement and concrete flew over, a septic tank of more than 80 square meters and more than 10 meters deep was built. In this way, the purchased plastic septic buckets and septic pipes of different diameters were installed. The capping process is half finished.
In the future, Weir will bring people over to install some biogas pipelines and machinery for the septic tank, and it will be the end after all are installed.
After the septic tank was dug, the first day's work was over. Qin Shiou didn't do heavy work, but he was not tired. The fishermen were sweating profusely, and they really worked hard to raise their salary.
The work in the next few days is a copy of the work of the first day. With the delivery of large floor-to-ceiling windows and doors and windows, the first floor quickly became decent.
The four walls of the small building are surrounded by four large floor-to-ceiling windows. The glass is naturally reinforced. The four floor-to-ceiling windows alone cost Qin Shiou 180,000 Canadian dollars, which is the same as the total price of the skeleton used to build the small building!
It's not worth the price. With these four floor-to-ceiling windows, the first floor can almost be used as a sightseeing room. In addition, good sunlight can prevent moisture.
The first floor was built, then the second floor, then the third floor, and finally a small attic was added on the top of the third floor. Shaq said it could be used as a utility room, which is very humane.
In this way, the basic skeleton of the small building is formed. No wonder the fishermen are full of confidence. The main materials used during this period are processed wood and composite panels. The doors, windows, tiles, and floors are ready-made, and assembly lines will do. (To be continued~^~)
You'll Also Like
-
The richest man in the film and television world
Chapter 1589 16 hours ago -
Martin Variety in American Comics
Chapter 487 16 hours ago -
Master: This traitorous disciple is not a Holy Son
Chapter 1092 16 hours ago -
A thousand enlightenments in one night, starting from being a menial apprentice
Chapter 475 16 hours ago -
Invincible Divine Sword
Chapter 2030 16 hours ago -
Family Cultivation: I can catalyze spirit insects
Chapter 186 1 days ago -
Bloodline World
Chapter 662 1 days ago -
From Hogwarts to Strixhaven
Chapter 369 1 days ago -
I changed the timeline with the game
Chapter 1000 1 days ago -
How can I become the Pirate King if you don’t work hard?
Chapter 130 1 days ago