h2192 Future energy giant! [2/3]

The ultra-fast charging station is a project of the Dream Future Energy Group, but the Dream Future Energy Group has not been formally established, so it is temporarily handed over to the Dream Future Graphene Technology Group.

After the establishment of Dream Future Energy Group, the ultra-fast charging station will be placed under its banner, and the fourth-generation nuclear power plant will also be placed under the Dream Future Energy Group.

Dream Future Energy Group takes the fourth-generation nuclear power plant as the core, and the first step is to arrange high-speed charging stations in large cities, so as to promote the development of graphene battery products of Dream Future Graphene Technology Group.

Fast charging is not an easy thing!

Fast charging requires support from many aspects to finally achieve fast charging.

Taking graphene batteries as an example, although graphene batteries support fast charging, there is no corresponding charging device, so it cannot be quickly charged.

Even regular lithium-ion batteries are the same.

Even if the lithium-ion battery is equipped with fast charging technology, it cannot be fast charged without using the supporting fast charging technology charging equipment.

In high-capacity charging scenarios, such as flying motorcycles or electric vehicles equipped with graphene batteries, because the battery capacity is very large, if you want to charge quickly, even if you have a fast-charging device, it is impossible to rely on ordinary grid charging. .

Taking the luxury version of the third-generation flying motorcycle as an example, it is equipped with a graphene battery with a capacity of 200Kwh. If it needs to be charged from zero to 100% within five minutes, according to the basic electric power formula, and then ignore the charging loss and other issues, the charging power will be will reach 2400 kW.

2400 kilowatts is a very exaggerated concept in daily life!

The power of an ordinary on-hook air conditioner is 2 kW. The power of the Lamborghini Urus that An Liang previously owned is only 478 kW. The general residential voltage is 220V.

never mind!

The civil power grid cannot reach such high power at all, because the lines of the civil power grid cannot withstand the current of more than one thousand amperes, and it will cause a fire in an instant, right?

Just the high-speed charging environment required by a luxury version of the third-generation flying motorcycle makes the civil power grid unaffordable. According to the design of the two-hundred charging positions of the high-speed charging station, what horror is that?

After ignoring some external factors, only according to the data calculation, one charging position requires 2,400 kilowatts of charging power redundancy, and 200 requires 480,000 kilowatts.

Although this is just a digital calculation game, it is enough to illustrate the ultra-high demand for electric power from the grid of the ultra-fast charging station. Without the cooperation of the nuclear power plant, it is really difficult to support the ultra-fast charging station.

Even if there is a nuclear power plant, a huge graphene battery pack needs to be built inside the extreme-speed charging station. The real charging method is not directly from the nuclear power station through the power grid to the extreme-speed charging station, but with a large graphene battery pack as a buffer.

The extreme speed charging station is more like a power bank composed of large graphene battery packs. The large graphene battery pack of the extreme speed charging station is charged by the nuclear power station and then supplied to the extreme speed charging station, so as to use electric energy more efficiently and safely.

At present, when the fourth-generation nuclear power plant is not established, large graphene battery packs can be slowly charged with civilian electricity and industrial electricity, and then discharged at a high speed, thereby ensuring basic charging requirements.

Extreme-speed charging stations are an important layout, and An Liang even plans to allow extreme-speed charging stations to cover the entire country, including the highway network, in the future, thereby completely subverting fuel vehicles.

This road is very long, and the capital that needs to be invested is very huge, which can easily reach the order of ten trillion.

But after this plan is realized, it will be a huge profit.

Just subverting the fuel car can greatly reduce the dependence of Xia Guo on oil, thus completely getting rid of the fate of being sold by oil, and the troubles of the bald eagle country will be very huge.

Therefore, Dream Future Energy Group can only refer to the structure of Dream Future Graphene Technology Group. An Liang can control a lot of voice, but he cannot eat alone.

After all, after the Dream Future Energy Group unites with the Dream Future Graphene Technology Group, the two will replace the status of oil. How can the great court not intervene?

Can’t send away an oil father and usher in an electric energy father?

An Liang once analyzed that Xia Guo’s vigorous development of new energy vehicles is not about overtaking in the automotive field, but only because of the oil clamp.

The development direction of Dream Future Energy Group precisely fits the development plan of the great court, so that it has the opportunity to develop into a future energy giant.

Zhao Wanxi stood beside An Liang. She listened to An Liang’s disclosure of (alright Zhao) about the speed charging station, combined with the news of the fourth-generation nuclear power plant disclosed by An Liang when she was in the National Security Investigation Bureau. , Zhao Wan basically guessed An Liang’s idea, and even dreamed of the future development prospects of the energy group.

“Your ambition is very grand!” Zhao Wan said with a sigh.

An Liang responded with a smile, “You are one of them too!”

Zhao Wanxi smiled. This is the genius of An Liang. He is always willing to share interests and build an interest group that cannot be confronted.

If An Liang wanted to set up the Dream Future Energy Group by himself, it would definitely be a lot of resistance, but after referring to the Dream Future Graphene Technology Group, it will only be supported by everyone!

Tap the screen to use advanced tools Tip: You can use left and right keyboard keys to browse between chapters.

You'll Also Like