I Can Make Money by Watching Videos

Chapter 656: The revolution of power technology

Director Wang listened to the host’s words and said: “After the five nuclear power plants of Feitian Technology Group have completed the installation, testing and commissioning, we will quickly send a team of experts to inspect various indicators. If they meet the national standards, we will Approved at the end of April, that is to say, the five large nuclear power plants of Feitian Technology Group can transmit power to the outside world by May 1 at the latest!"

"Regarding when residents, office spaces and factories in various places can restore power supply 24/7, the situation in each region and city is different. The lines in some areas have been restored. All power supply can be restored before May 1st, and the lines in some areas Unblocked operation has not been restored, and the equipment has not been repaired. Therefore, the time to restore all power supply may be delayed. We will announce the specific time for power supply restoration in various places at any time. Please pay attention to the information we disclose in time!"

Director Wang continued: "After these five nuclear power plants are put into operation, the total installed power generation capacity of the power stations currently in operation in my country will reach 247183 trillion kilowatts, of which the five nuclear power plants under the Feitian Technology Group account for half! Last year, my country The total installed power generation capacity is 228752 trillion kilowatts, and the power generation capacity is 7518.9 billion kilowatt-hours!"

"Due to the special circumstances this year, many buildings, railways, highways, highways, factories, etc. in cities and villages in various places will need to be rebuilt, and according to scientists’ speculation, the grayish weather in the next year or even a few years will become normal, and industrial and agricultural production needs The power consumption will be about twice as high as in previous years, and the total power consumption of the country will reach 1.5 trillion kilowatt hours. We will do everything possible to increase the power generation to meet the needs of people's living, production and work!"

A foreign reporter asked: "I just heard from Director Wang that this year's annual electricity consumption in your country will reach about 1.5 trillion kilowatt-hours, but last year it was only 7518.9 billion kilowatt-hours, almost doubled. Can your country achieve this power generation capacity?"

Director Wang smiled and said, "Director Wei, please answer this question!"

Director Wei, who was sitting next to Director Wang, brought the microphone closer and said, “Before answering this question, I want to explain to this reporter friend what installed capacity is. Director Wang also said just now that China’s total installed capacity last year was The total installed capacity is 228,752 billion kilowatts. The total installed capacity is 7.5189 billion kilowatt-hours. The total installed capacity is the theoretically rated power of the generator sets of all power stations in the country. Theoretically, it can generate so much power. During the day, people don’t need lighting and use less electrical appliances. In summer, it consumes more electricity than in winter. After all, equipment such as air conditioners and fans are used more; therefore, power stations do not turn on every generator set to generate electricity at all times. Some generator sets It has been out of work for a long time, and the generator set needs regular maintenance!"

"In addition, I just said that the total installed capacity can theoretically generate so much electricity, but the generator has power loss when it is working. For example, my total installed capacity of power generation per hour is 100 kilowatts, and the loss of 35 degrees during the power generation process. In fact, the power generation is 65 degrees!"

"Faced with the huge increase in power consumption this year, we will try to shorten the maintenance time of all generator sets in each power station; on the other hand, we will try to let more generator sets work at the same time. The total installed capacity for the year was 247183 trillion kilowatts. It is completely stress-free to generate 15 trillion kilowatts in the whole year!"

"Furthermore, when the climate is warmer in April and May, when the rivers are thawed, our hydroelectric power stations can work again, and the power generation will increase again!"

After Director Wei finished answering, the host ordered another Xiangjiang reporter. The Xiangjiang reporter asked: "I am a reporter from the Xiangjiang Morning Post. As far as I know, the five newly-built nuclear power plants of Feitian Technology Group are located in the north, south, east, and west of the country. According to the principles of nuclear power plant site selection, the five different locations should be as far away as possible from densely populated and economically developed areas, and most of them are located in coastal areas. Why does your group build these five nuclear power plants in five different locations? Is the energy loss of long-distance transmission of electricity? Doesn’t it need to consider the high maintenance cost of long-distance transmission lines and equipment?"

The host said: "This question, please answer Mr. Huang Yiming, general manager of the Group's subsidiary Power Equipment Manufacturing Company!"

Huang Yiming thought that it was finally my turn. He said, “Because our nuclear power plants use not the traditional third-generation nuclear reactor technology, but the new-generation nuclear energy system technology, there is no need to consider the issue of nuclear reactor cooling. Build nuclear power plants on the coastal zone!"

"We built these five nuclear power plants in five different positions originally to provide power to the charging stations of our group's new energy manufacturing company. This is convenient for power transmission. Because the situation cannot keep up with the changes, we have greatly increased each one. The annual total installed capacity of nuclear power plants can transmit power to all regions of the country and solve the problem of insufficient power consumption throughout the country. In order to solve the problem of excessive long-distance transmission line loss and high maintenance costs for erecting long-distance transmission lines, our group will adopt remote wireless Power transmission technology. In this regard, we will launch a full range of cooperation with the power sector to solve the problem of remote wireless power transmission and provide power to users in time!"

As soon as the term remote wireless power transmission technology came out, it immediately attracted the attention of all the reporters present.

Immediately a reporter asked: "Excuse me, Mr. Huang, does the remote wireless power transmission technology you just mentioned is like emitting electromagnetic waves?"

Huang Yiming nodded and said: "Almost, but wireless electromagnetic waves spread over a large area, and our wireless power transmission technology is fixed-point transmission and fixed-point reception. The energy loss during the transmission process is much smaller than that of long-distance transmission lines. There is no long-distance transmission line. The problem of maintenance, only need to maintain the transmitter and receiver equipment!"

The term wireless power transmission technology is not very new. Scientists over a hundred years have put forward this technical idea, but it has not been developed. Now Feitian Technology Group has even researched this technology, and it will also be used in real life. Given that Feitian Technology Group will use this technology to solve the problem of electricity transmission across the country, reporters believe that this technology must have matured. This is big news.

If this technology is used on a large scale around the world, it will be a benefit to all mankind, because there is no need to lay long-distance transmission lines, which can save a lot of costs, ignore geographical and environmental constraints, and as long as the technology is reached, power can be transmitted to the ocean. On the other hand, electricity can be transmitted from the East to remote, impoverished and backward Africa, and even to any corner of the earth.

This is an epoch-making power technology revolution!

A reporter immediately realized the possible impact of this technology on humans around the world. The reporter immediately asked: "Mr. Huang, is this long-range wireless power transmission technology of your group available for free transmission across the country? Can it be transmitted freely on a global scale? Can your country’s excess power generation be transmitted to remote and backward Africa?"

Huang Yiming smiled and said: "At present, our technology can transmit electricity to any corner of the country. As for the long-distance technology across oceans and continents, our scientists are working hard to overcome it. I believe it will be possible in the near future. accomplish!"

"Mr. Huang, with regard to the supporting transmission and receiving equipment required for remote wireless power transmission technology, is your company producing? What is the production capacity? When will it be able to meet the national demand?"

Huang Yiming said: "Yes, this set of equipment is divided into three models, large, medium and small. Our production capacity is determined according to market demand. If the market demand is large, we will build additional production lines. Regarding when the national demand can be met, I think Director Wang should be asked to answer this question!"

"Okay!" Director Wang promised and said into the microphone: "We will cooperate with the power equipment manufacturing company under the Feitian Group to purchase a large number of wireless power transmission and receiving equipment of various types, and complete each of them within one month. The installation of wireless power receiving and transmission equipment of provincial power companies; the installation of wireless power receiving and transmission equipment of various provincial power companies and local municipal power companies within one month, and all provincial and regional power companies within one month Install the power transmission and receiving equipment with the county-level power companies under it, and install the equipment in the towns and villages in one month! In order to save costs, we can use the short-distance transmission lines that we can use before. After being dismantled, it was changed to wireless transmission and reception, and the old wired power transmission lines and equipment will be eliminated year by year!"

In the office above the 60th floor of the press conference, several people were watching through live shooting. Tang Xiaochuan smiled and said, "He and the others are still very photogenic!"

Liu Zhiyuan said: "He has been a veteran executive for decades, and he has experienced many such scenes!"

Tang Xiaochuan asked: "Mr. Liu, let you select an engineer to go on a business trip to the moon, how is this going on?"

“The final selection is going on. After all, it’s going to the moon. Once you go, you can’t come back if you want to come back. The selected person must endure loneliness, be responsible, have strong self-discipline, and be serious and responsible for work. , Technically outstanding!"

Tang Xiaochuan nodded: "When will the selection be completed?"

"The final candidate can be determined within three days. Once the candidate is determined, we must concentrate on training and learning! In addition, the construction materials for transportation to the moon are almost ready, and they will be all in place in the next two days. You can see when the spacecraft Go?" Liu Zhiyuan asked.

Tang Xiaochuan said: "The materials are almost ready, so make sure to set off the day after tomorrow!"

Tap the screen to use advanced tools Tip: You can use left and right keyboard keys to browse between chapters.

You'll Also Like