I'm A Fisherman, It's Reasonable To Get Rich By Fishing

Chapter 262 Building A Manor On The Island

Rong Bing cheerfully threw the fish into the super fish guard, and started the next shot...

It took about two hours to catch one hundred black carvings, and the sound of the system sounded at the right time.

"Congratulations to the host for completing the daily tasks. The host will be rewarded with a set of infrastructure robots. The rewards have been distributed to the system inventory. Please check and collect them yourself."

"Infrastructure robot? Hehe...the system still understands me, this small island can be developed first." Rong Bing clicked on the system page happily.

In the system inventory, Rong Bing saw a row of grids, each with a strangely shaped humanoid machine.

Rong Bing came to a beach, and released those infrastructure robots with a thought.

"Boom..."

Twelve huge robots suddenly appeared on the beach.

These robots vary in height, but the smallest one is bigger than a heavy tank, while the largest robot is fifteen meters tall, with a chassis the size of a basketball court.

Rong Bing took a closer look at these robots and found that there was a reason why they looked different.

Because any infrastructure requires many steps and the division of labor is cumbersome, the equipment required is also different.

That's why these twelve robots have their own shapes, such as electric picks, wind picks, pipe cutting and threading machines, ramming machines, cranes, tower cranes and so on.

Among them, Rong Bing also saw brick-making robots and cement-making robots.

"Boss, what project do you want to build?"

Suddenly, the tallest robot actually spoke.

Rong Bing was stunned for a while, but he was relieved when he thought of the omnipotence of the system!

After thinking for a while, Rong Bing pointed in the direction of the sea of ​​flowers and said, "I want to build a manor near the sea of ​​flowers, but try not to damage the surrounding environment, can it be done?"

The big robot immediately replied: "No problem, boss!"

"Then act!" Rong Bing nodded.

"Guaranteed to complete the task!" The twelve robots agreed in unison, turned and walked towards the sea of ​​flowers.

Although there are only twelve robots, the movement is like a thousand troops...

Just now Rong Bing also named these robots, from height to height, they are called Ah Da, Ah Er, Ah San... Little Twelve!

Just now Ada gave him some blueprints and plans for the construction of the manor, and now Rong Bing is looking at it seriously.

The preparation before construction is mainly to confirm the environmental conditions of the garden.

Including the garden's soil thickness, orientation and sunshine, monsoon wind direction, temperature and humidity, changes in the surrounding environment, etc.

These tasks are done by Ah Wu. In addition to his own work, Ah Wu does planning and designing, and finally acts more like a supervisor?

Then came the land preparation, which was done by Ah Da independently.

Because the original garden is often overgrown with weeds or irrelevant objects, in order to facilitate the subsequent construction, the site must be emptied first and the site prepared. When preparing the site, the height of the soil layer is often adjusted according to the construction drawings. Need to dig down.

At the same time, the soil can be analyzed. If the soil condition is not good, it is necessary to introduce soil suitable for planting plants from the outside.

Ah Da's huge body played a huge role at this time. To level a piece of land, he only needed to put down the big shovel on his waist and push it across.

The shovel is fifteen meters wide, the kind that is in one piece!

Then there is stakeout, which is done by Ah Er.

Stakeout is to stake out the actual size of the garden design drawing at 1:1 and draw it on the base.

The position of each element can be marked with lime, bamboo poles, stones, etc.

Stakeout allows people to understand the positional relationship of each element on the spot, and it is also convenient for other robots to understand the construction scope of each element.

At this time, flexible adjustments can be made according to Rong Bing's personal feelings, and the construction can be carried out after confirming that the overall configuration is appropriate.

Speaking of lofting, this is also the basis of interior decoration: if the lofting and measurement are done well, the decoration is half the battle!

Simultaneously, the drainage project was completed jointly by Ah San and Ah Si.

Drainage works are a major focus of construction, after all, no one wants a beautiful garden to end up as a swamp.

So a drainage test must be done first.

First find out the slope of the original discharge slope and the location of the drainage. If there is a drainage ditch, you can first pull a water pipe to irrigate to see if it flows away quickly. If the flow is too slow, or even accumulates, drain the pipe.

Then water directly on the base to test the drainage of the discharge slope, and check whether there is water accumulation or water flow is not smooth.

If the drainage is really not understood, it is necessary to set the bottom drainage pipe in the soil layer.

At the same time, remember to protect the drain hole so that it will not be blocked by subsequent construction.

Rong Bing happily watched them open the door, and felt that the efficiency of these robots was simply too high!

It's only been an hour or two, and the infrastructure of the manor is almost complete.

After the laying of the infrastructure was completed, Rong Bing saw the sixth son and the seventh son go to battle together and began laying various wires...

Wire engineering Wire engineering is also a major focus of construction, because it is directly related to life safety.

Since it is outdoors, cables with better wrapping effects must be selected and inserted into plastic tubes with strong pressure resistance.

The joints of the wires should be wrapped with waterproof tape first, then wrapped with insulating tape, and protected with a junction box.

When laying wires, they are generally laid around the periphery of the garden first, and then pulled to the middle when they reach the required position.

Rong Bing saw that the two robots paid special attention to avoiding the reserved positions of trees and shrubs, so as to prevent the plant roots and wires from interacting with each other.

Immediately he nodded, secretly thinking that these robots are really thoughtful!

At the same time, the indoor and outdoor power consumption should be separated, and the different circuit functions of the garage, lighting, and sprinkler systems should also be separated. Leakage protectors should be installed to ensure that they do not affect each other, and safety comes first.

After more than an hour of busy work, all the basic work of the manor was completed, and the construction of the superstructure was about to start.

The next step is mud work, which is done by Ah Da, Lao Ba, and Lao Jiu.

Engineering mud works are usually used for walls, walkways, bases and other projects.

When carrying out mud work, the foundation must first be grounded, and there will be processes such as excavation, tying steel bars, and pouring cement.

At this moment, Ah Da turned into an excavator again, cocking his big butt and kicking the foundation passage.

Lao Ba took advantage of this time to come to the edge of a limestone hill and started fast cement production.

The subsequent construction sequence is usually from top to bottom, first the wall, and then the aisle.

There are two points to pay special attention to here. First, the cement must be selected well. The higher the label, the stronger the cement strength. Choose the appropriate label according to the load-bearing requirements;

But Rong Bing believes that the cement made by Lao Ba will not be bad, so he looked at the information with confidence.

Secondly, choose the right bricks. At present, hollow bricks, red bricks, refractory bricks, ceramic tiles, etc. are commonly used in Chinese flower houses. Among them, the first three are mostly used for building walls, but the textures are different, and the last one is mostly used for paving the ground.

The work of making red bricks is naturally done by Lao Jiu.

It came to a loess slope, stretched out a large drill bit from its chest, and put all the loess into its belly, and what came out from behind were pieces of formed red bricks.

And tenth, eleventh, and twelfth were not idle, tenth was making doors and windows, eleventh was going to get a lot of wood, and began to make various wooden items for the construction of the manor.

Little Twelve, the shortest robot, is also sucking sand at this moment to make all kinds of glass...

With the help of these robots, Rong Bing is looking forward to what his small island manor will look like after it is completed.

Tap the screen to use advanced tools Tip: You can use left and right keyboard keys to browse between chapters.

You'll Also Like