after all the dome modules have been prefabricated, the prefabricated blocks will be transported from earth to Mars.

The prefabricated blocks were then assembled on Mars to form a complete dome.

This process seems very troublesome, there are several more processes than direct construction.

The transportation of these prefabricated blocks alone is a big problem. The transportation of moulded modules is many times more difficult than that of raw materials, and the production on earth is also much more troublesome.

The trailblazer has been running back and forth in recent days to transport the prefabricated blocks of the dome.

Basically, the dome accounts for the vast majority of the material transported from the earth.

That's why Yesu was so concerned about this, because he was afraid that the prefabricated blocks could not be transported to Mars on time.

Although this construction technology is troublesome for transportation and manufacturing ahead of time, it is not without advantages.

In the construction time, this technology can reflect the advantage, the construction time is more convenient than the ordinary way many times.

Because all the prefabricated dome modules were transported, Yesu only needed to assemble and shape them.

Just pay attention to the serial number of the module when assembling. The shape of each module is different. If the installation place is not correct, it will be very troublesome.

Such a dome construction method, to reduce the construction of a lot of difficulties.

Otherwise, it would be impossible to build such a large dome on Mars.

It's very difficult to build such a huge dome on earth, let alone in the harsh environment of Mars.

Fortunately, Ye Su doesn't have to worry about these difficulties now. She just needs to arrange the assembly work.

Anyway, he had already coded all the modules in advance, and the astronauts just had to assemble the dome according to the numbers.

Although the work of the dome is very large, there are also robots to help assemble, so this work can be completed.

As long as the follow-up Yesu is properly directed, a large transparent dome will appear on Mars.

And after the completion of the dome construction, the later construction will become much simpler.

With the dome to protect all astronauts, we do not need to worry about the impact of the external environment during the construction, we just need to concentrate on the work.

When pioneer arrived on Mars with the last modules, it was time for the transparent dome to be constructed.

As soon as the last batch of dome modules were transported to the construction site, Ye Su summoned all the management personnel and held an engineering meeting in the engineering headquarters.

"Now that the prefabricated modules of the dome are all in place, we can start the construction of the dome."

"You go down and inform the astronauts of various units, and then concentrate on completing the dome project."

"Let's get this part of the most difficult work done quickly, so that we can relax a little bit."

Ye Su stood in the middle of the engineering headquarters and gave follow-up orders to all the managers around.

"The next work is the focus of the whole project, and I hope everyone will take heart."

"As long as we can successfully complete the dome, the whole project will be half finished."

We are about to start the most difficult part of the whole project. Now even Ye Su is a little nervous.

That's why he repeatedly stressed this issue in the engineering headquarters, hoping to attract the attention of all people.

In terms of the construction time of the whole city, the construction of the dome will take up half of the time.

From this point, we can see the importance of this project. No wonder Ye Su is so nervous.

After the completion of the construction meeting, everyone scattered and began to carry out different work.

In the dome construction work, everyone has their own part of responsibility, only everyone can work together to complete this super project.

Around the construction site, there is a circle of circular structure.

This huge circle is the foundation of the dome, which is responsible for supporting the weight of the whole dome.

Now that the foundation of the dome has been completed, the construction of the ground part will begin.

We saw huge lifting robots, lifting huge transparent modules from the stacking site to the predetermined place.

Each prefabricated dome block has a number, and that long string of numbers represents where it should be placed.

The lifting work is not so simple, it needs a good overall planning.

The whole dome is composed of numerous prefabricated blocks. Because the number of prefabricated blocks is too many, it is a huge problem to put each prefabricated block in the place where it should go.

There are so many prefabricated blocks piled together on site, if you don't pay attention to them, they will be placed incorrectly, and the later assembly work will be delayed.Ye Su, under the command of the managers, took several days to put all the modules in the predetermined place.

The difficulty of dome construction is reflected in the fact that the preparatory work alone will waste so long time.

Putting the blocks in place is just the beginning, and the assembly work is really difficult.

Although the construction technology of prefabrication and installation is much simpler than that of integral molding construction.

However, this is simple and relatively simple. There are many problems to be considered in the assembly work.

This dome is not the kind of dome on earth. It is a dome to be used as a protective layer on Mars.

So this transparent dome must be absolutely airtight.

If there is a gap between the precast blocks, even a small gap, will cause great disaster.

When ye Su built the whole dome, he had to make sure that every prefabricated block was perfectly jointed, and then welded them with special technology to form a solid whole.

Each prefabricated block can be produced only after calculation in advance, and one block can not be installed incorrectly.

Therefore, during the installation construction, it is necessary to ensure that each precast block has no installation error and is installed in the planned place.

There are too many places to pay attention to in the whole project. Even Ye Su, the commander-in-chief, had to watch at the scene during the construction.

Tap the screen to use advanced tools Tip: You can use left and right keyboard keys to browse between chapters.

You'll Also Like