"I asked you to increase it and you increase it."

Seeing Keqing coming, Bai Ye directly called her to her side.

Pointing to the suggestion wire in front of her, she spoke to Keqing.

Hearing Bai Ye's words, Ke Qing was a little puzzled.

"this is?"

She has no idea what this is.

"That's the light bulb."

"You try it first."

"See how it goes."

"If there is no problem, we can put these light bulbs into the house when we decorate the house next time."

"And it can also make street lights."

Hearing Bai Ye say this, Keqing's eyes suddenly lit up.

Immediately, she didn't hesitate, she stepped forward and started to try what Bai Ye said.

Start with a very small power of thunder element.

Slowly input into the two lines.

With the injection of Keqing's elemental power, slowly, the light bulb began to glow with a dim yellow light.

Bai Ye, who saw this scene, knew that he had succeeded.

And Ke Qing's eyes widened at this time.

Just a little bit of thunder to lighten this up?

This must be too amazing.

"Big it up."

Just when she was amazed, Bai Ye couldn't help but say this.

Hearing Bai Ye's words, Keqing nodded.

Immediately also increased the output.

Slowly, the lights became brighter and brighter.

But soon, a 'pop' sounded.

The light bulb shattered directly and exploded.

Seeing this scene, Ke Qing couldn't help being stunned.

But Bai Ye was not too surprised.

After all, there is a limit to this.

But it has met his expectations.

(Ask for flowers, ask for a monthly pass, ask for a reward.).

Chapter 32, Mandrill, please help me invite that woman who is good at chatting.

Ke Qing looked at the shattered light bulb and was stunned.

"Broken?"

"Did this... fail?"

She was a little puzzled.

Is this a failure?

Bai Ye shook his head.

"not at all."

"It has met my expectations."

"It's daytime now. Although it doesn't look very bright, it is enough to use at night."

"Well, it would be nice to change the color of the light bulb when the time comes."

"A few coatings on the inside and that's it."

That's enough, it's just because Ah Qing used too much force to cause this.

Hearing this, Ke Qing was immediately taken aback.

"Is that so?"

"I don't understand these things, but since you said it's okay, then it's okay."

"Will the city use this kind of lighting in the future?"

"Is there anything to prepare?"

Since Bai Ye said there was no problem, then there really was no problem.

Instead, she asked about something else.

Hearing what she said, Bai Ye shook his head.

"There is nothing to prepare for now."

"Everything, let's wait until other places are built."

"The power supply equipment has not been fixed yet."

"There are a lot of things to prepare."

"So the lights took a long time to get right."

"Besides, if you want to generate electricity, you have to choose another place."

"After all, there will inevitably be some dangers if there are so many electric slimes."

"Not only that, but a hydroelectric power station will also be built by then."

When he said this, Bai Ye touched his chin.

To be honest, just the construction will take a long time.

Although many houses have been built in this new city.

But there is still a big gap from what Bai Ye expected.

It is only one-tenth of what is being built now.

Just a commercial street was built.

There are also docks under construction.

If those tall buildings want to be built, it will also take a lot of time.

"Well...let's continue recruiting."

"There are not enough people."

"You tell Liyue Port to bring more people over."

 Come on. "

"Also, the work of capturing slimes must continue."

"If the car can be produced, it may save more people."

"But it will take time."

The biggest reason for dragging down the construction period is still because of transportation.

Now the speed of construction here is not slow.

It's just that the delivery of raw materials is a bit slow.

After all, they can only be pulled over by carriages.

Right now, Bai Ye is thinking about getting out the alchemy version of the car as soon as possible.

Then ship.

Only in this way can the speed of construction be accelerated.

Ke Qing didn't say anything.

She also knows the current situation.

But the transportation materials can't keep up.

Still too slow.

The construction here is in full swing, although the road has been built.

But the cement and bricks delivered every day are very limited.

Some people who have nothing to do are now going to mine stones to build the pier.

Shaking her head, she didn't think much about it.

Bai Ye talked with Keqing for a while, after confirming that there was nothing wrong with the light bulb.

Bai Ye started giving birth.

Install it first when the time comes.

After the electricity is connected, it can be used directly.

All the places that should be reserved are expected.

Next, Abedo only needs to get out the transformer and power storage device of the Tivat version.

Then Bai Ye can start laying wires here.

Tap the screen to use advanced tools Tip: You can use left and right keyboard keys to browse between chapters.

You'll Also Like