If there is any project that can make the Chinese people extremely excited?

Then, the fusion power station "Quarfu 1" will be one of them.

Because he is a name that can be written in the history books.

Now, the time to write history is getting shorter and shorter, and Li Gang, who was originally in charge of construction, has also officially changed his business and became the first director of China's first nuclear fusion power station.

Zeng Qiang is also the chief technical engineer, mainly responsible for technical problems in the operation of the power station.

Compared to Li Gang's excitement, Zeng Qiang was not much better.

Just as the power station was about to be completed, he gave Jiang Cheng the preliminary design drawings of his design for the nuclear fusion power station on the moon, and after the successful operation of Kwafu-1, his focus was to bring new people up and prepare for the future lunar base fusion power station.

This preparation may take a long time.

But Zeng Qiang believes that in his own life, he must see it.

September 23 is the official operation of Kwafu No. 1.

On this chosen day, important personnel will also come to press the button and personally announce the official power generation and grid connection of Kwafu-1.

The preparations before that had been in full swing a month ago.

Including follow-up construction and internal decoration, especially the two reactors and seawater deuterium plants, have been tested.

Moreover, the electricity connected to the grid has been arranged, focusing on supplying Nanyue Province, and together with hydropower, it will become the source of electricity for the entire province, in addition to 40% of the electricity, it will also be transmitted to Xijiang Province and Nanhai Province.

Just one Quafu No. 1, two power generation reactors, the annual power generation of more than 1 trillion kilowatt hours, how much is the annual electricity consumption of the whole society in Nanyue Province, about 800 billion kWh.

There are no problems with supply at all.

At that time, the entire Nanyue Province, all thermal power, will be slowly eliminated, some have transformation value, will be transformed, can not be changed will be eliminated abroad, and Nanyue Province will become the only province and city that completely uses clean energy, there will be no thermal power and so on.

Now everything is ready, waiting for the official announcement and official grid power generation.

The leaders of Kyoto are preparing to come, but the entire general control center of Kwafu-1 is already very lively.

Because there will be many reporters coming, the entire opening ceremony is located in the large square in front of the main control center.

Around the entire power station, there are all security personnel on guard, and on the edge of the power station, there are military base guards, and the security degree is bursting.

There are also many people who are invited to participate.

Jiang Cheng is one of them.

The power station is a joint venture between China Southern Power Grid Company and Fenghuo Group, and as the chairman, Jiang Cheng also needs to participate.

Not to mention the enormous historical significance of this project.

And taking this opportunity, many people want to see Jiang Cheng in this place, and they are very affectionate, thinking of communicating with Jiang Cheng.

For example, the leaders of Xijiang Province and Nanhai Province exchanged contact information and Weixin at this time, and invited them to invest in their places, especially the plans to build Kwafu No. 2 and No. 3.

And expressed full support, free land, preferential tax policies are better than the other.

Jiang Cheng believed that if this place was not suitable, maybe the two would have to bid.

“...... The special needs of nuclear fusion power stations still have to be built by the sea. Jiang Cheng said tactfully.

The leader of Xijiang Province feels a pity that his coastline is short.

On the contrary, Nanhai Province was very happy, and thought that he was full of advantages.

But Jiang Cheng knows that in the future, one of the No. 2 and No. 3 of Kwafu will be built in Fujian and Zhejiang, and the other will be built in Luhua Province.

The intention is self-explanatory.

The second phase will add 2 reactors, and there is no pressure to supply several southern provinces in the future.

Then, the future will need a lot of electricity, the magic capital triangle and the Kyoto area.

As well as huge foreign countries.

When the technology of nuclear fusion power generation is more mature, especially the preparation of deuterium is more excellent, China will achieve energy control over the world through nuclear fusion power plants and ultra-high voltage transmission technology of the grid.

Or rather, constraints.

One fusion power station can generate enough power in a year for several small countries to use for a year.

What if, cheaper?

Their power station will fall apart.

Of course, these Jiang Chengdu believe that Hua Guo will not seek to enter, but mutually beneficial and mutually beneficial to achieve a win-win situation.

As long as there is a powerful and almost unlimited source of electricity, the impact is there.

You know, there has been news on the Internet that after the power supply of Quafu No. 1, the electricity price of charging piles in Nanyue Province will drop significantly, and I heard that the price of fast charging will also be in 1/2 of the original!

This is to support the development of new energy, and preferential prices are specially given.

In terms of the current "Han" pure electricity of Yadi company, he has two versions, one is to use his own blade battery, 80 degrees, fast charge for more than half an hour to fully charge, the price is about 128 yuan, can run at least 400 kilometers, a kilometer 3 Mao 2 or so.

According to the current preferential price of charging pile fast charging, it is reduced by half, that is, 1 Mao 6, which is cooler than the valley electricity of household charging piles!

Not to mention the second version of Yad, the carbon nano battery purchased by Fenglin battery, a 100-degree battery, fast charging for 20 minutes, and can run nearly 700 kilometers!

Although they did not get a direct reply from Jiang Cheng, neither of them was annoyed, they were still very happy, and they were probably thinking about asking Jiang Cheng to go to their place after going back.

Nuclear fusion power plants can't do it, other investments can do!

Especially Xijiang Province, his position is awkward, so far there is no Maple Fire Group to invest there, Nanhai Province is okay, there is Maple Fire's space center.

Without waiting for these people to continue their communication, someone said, "The leaders are coming!" While

speaking, Jiang Cheng saw that it was the leader who had arrived!

Engaging in rituals or something, it is very troublesome, and there are many processes.

But the significance of this time is very important, everyone can understand it, and I am very happy.

"Xiaojiang, our project is very fast!" The leader smiled and shook Jiang Cheng's hand heavily.

The whole team, almost in a two-shift format, while ensuring safety, but also paying attention to quality and speed, spent a year and three months, and finally succeeded in building the project.

If it is ordinary construction, the construction period will take at least 3 years.

But it is precisely because of the extraordinary significance of the Father Quake No. 1 that this will be desperate.

Because this is the future.

Not only Jiang Cheng, Li Gang, Zeng Qiang, but also the high-level of Hua Guo must take this opportunity to prove that the future of science and technology led by Hua Guo is coming!

Jiang Cheng smiled modestly, "It's all the credit of Director Li leading the construction team."

"You stand next to me, let's have a good chat after the ceremony, I am very interested in this power station." As he spoke, he pulled Jiang Cheng by his side.

Soon, as the ritual time came, the switch that symbolized the opening was pressed.

The next moment, the silent Qua Father One was activated.

From a distance, two circular buildings nearly 100 meters high near the sea moved.

Everyone in the control center couldn't help but feel a slight vibration on the ground.

Then, salutes were fired in unison, spraying numerous streamers.

The crowd applauded and cheered loudly in the square!

"I announce that China's first nuclear fusion reactor power station 'Kwafu-1' has officially generated electricity and connected to the grid!"

Tap the screen to use advanced tools Tip: You can use left and right keyboard keys to browse between chapters.

You'll Also Like