Red Alert Somalia

Chapter 79 Drilling Oil Wells with Technology

Today is the sixteenth day after the end of the war. It was originally yesterday when Li Lan and Farah agreed to meet.However, because Li Lan's demand for steel and cement has soared, Farah has been busy for this, so the two did not meet as scheduled.The date of the formal meeting was also postponed to the day after tomorrow.

The construction of the fence has been going on these days, but the two days need to be slowed down. Because of the lack of large-scale construction equipment, the engineers can not keep up with the construction speed of the fence.

In recent days, the base’s funds have begun to have a surplus, especially yesterday, after the construction of the last mining vehicle was completed, the base’s funds still have nearly 300,000 surplus.This used to require ten days of accumulation, but now it takes less than two days to get it.

Next, Li Lan will begin to prepare for the construction of oil wells and armed forces.

Building units, barracks, battlefield factories, and magnetic energy reactors, these three buildings cannot be broken.According to Li Lan's demand for territorial power, the power load must not exceed half of the power generation. In this way, every construction unit must prepare at least one magnetic energy reactor.

Therefore, every time a barracks and battlefield factory are produced, two magnetic energy reactors must be produced.Fortunately, the construction price of the original Red Police unit is super cheap.

However, the units on the other unit pages have become very expensive. Whether it is the price of 50,000 yuan for the ore extraction well or the price of 100,000 yuan for the field hospital, it is enough to illustrate this point.

And then, the base funds needed for the drilling wells and refineries that Li Lan will build, including steel plants, are not cheap at all.Otherwise, there is no need to wait until the base fund income reaches the maximum before considering these.

Technology drilling oil wells:

Energy extraction unit, construction price of 120,000 base funds, covers an area of ​​100 square meters, and construction takes 72 hours.

Explanation: The original Red Alert crude oil extraction unit, according to the reserves and depth of the oil field, each technologically drilled oil well can produce up to two hundred tons of crude oil per day, and at least one hundred tons of crude oil per day.If the crude oil is directly recycled into base funds, then 4,000-8,000 base capital income can be obtained every day.

Note: Drilling oil wells with technology does not have oil storage capacity, but an underground oil pipeline is included. When constructing, please plan the route of the oil pipeline. The longest oil pipeline is ten kilometers and the deepest ten meters. The length and depth can be freely selected.

Special note: Technology drilling oil wells must be constructed with oil refineries.

Recommendation: Please do not build high-risk oil wells in high-risk areas to avoid being occupied by the enemy.Once there is a danger of being occupied by the enemy, please recycle it immediately and get one-fifth of the construction price.

Technology refinery:

Energy extraction unit, construction price of 250,000 base funds, covers an area of ​​one million square meters, and construction time is 168 hours.

Description: It can provide oil refining services for five high-tech oil wells at the same time, and can connect up to ten oil pipelines, and the daily oil refining capacity can reach 1,000 tons.It comes with five deep underground oil depots, which can store a total of 1 million tons of various fuels.Once the crude oil exceeds the daily refined quantity, the refinery will take the initiative to store the crude oil first.The refined crude oil will be stored separately according to the needs of the commander.

Note: The technological refinery implements a fully enclosed and fully automated refinery, and the commander can control the entire refining process in the control panel.

Special note: technological refineries and technological drilling wells are complementary and indispensable.

Suggestion: Please build the technology refinery far away from barracks and residential areas, otherwise it will cause extremely disastrous consequences if it is attacked.

————

The construction fund of up to 120,000 for drilling oil wells by science and technology will not make Li Lan timid. Somali oil is what Li Lan values ​​most and is also an important economic pillar for his future development.In front of this, the ten drilling wells above the high-level authority index are nothing at all.Even if the price of this oil well is several times higher, he will save money to build it, and it will be a lot of construction.

Like ore extraction wells, these two construction units are necessary units for the development of the base.And for Li Lan, who now has a daily income of 180,000 base funds, this price is not expensive at all compared to the income.

At present, within the scanning range of the base, there is a large oil field, which is close to the sea.It is a deep-seated oil field. If a realistic method is used to develop this oil field, the price will be very high.

But for Li Lan, this is not a problem. The scientific and technological oil well drilling unit itself can solve it by itself. What he needs to do is to plan this oil field well.Determine the construction density of technologically drilled oil wells and the laying of oil pipelines.

"Assistant, tell me the data of this oilfield again."

"This oil field is six kilometers away from the base vehicle and is located in the northern coastal zone of the base vehicle. The crude oil reserves are 38 million tons. (Gorgeously add a zero!) According to the reserves, it is divided into three oil fields. Very high development value. This oil field belongs to the same oil field belt as the oil field in the territorial waters of 12 nautical miles in Somalia."

According to current international oil prices, the value of this oil field has exceeded 27 billion U.S. dollars. If fully developed, it is equivalent to Somalia’s 50-year economic income.

This is not a small amount of money. Although it will take 20 to 30 years to squeeze out the value of this oil field, the annual income from this oil field alone is not a small sum.Enough for Li Lan to complete many of his own ideas.Moreover, having oil means that the mechanized forces developed by oneself will not be controlled by others.

The location of the oil field has been marked on the map by his assistant, and Li Lan couldn't wait to click the technology drilling well, choose a place close to the base, and confirm the construction.And plan the location of the technology refinery, and set the line of the oil pipeline.

As long as three days later, science and technology drilling oil wells can begin to work, but it will take a lot of time to actually use the fuel produced by oneself, because it will take another week to build the technology oil refinery.Moreover, in order to increase production, the follow-up work of technology drilling well construction cannot be stopped.

Moreover, Li Lan did not want to directly recover the crude oil from the previous scientific and technological drilling wells.Because he is about to start building his armored force, this is the key to strengthening his strength.

However, before the refinery came out, the crude oil produced in the first oil field needed to be directly recovered.Otherwise, he has no place to store crude oil.

"Assistant, in the description of scientific and technological oil well drilling, the daily output ranges from 100 tons to 200 tons, and the crude oil is recycled into base funds, and the price is 4000-8000 per day. How are these calculated?" In relation to the development of the base, Li Lan had to figure it out.

"The output is determined according to the difficulty of extraction. The open-pit oil field is the least difficult to extract and can naturally reach the maximum extraction. The deep underground oil will increase the difficulty of extraction. Moreover, if offshore technology drilling wells are developed in the future, the difficulty of extraction will also become At present, according to the data of this third-class oil field, plus the ability of technological drilling wells to extract crude oil, each technological drilling well can produce 150 tons of crude oil every day. This data is already in the world. Advanced level.

Take, for example, the current oil field. One hundred and fifty tons of crude oil per day can be recovered into base funds. Each technology drilling well can recover 6,000 base funds per day."

After getting the answer from his assistant, Li Lan began to calculate. According to the lowest international oil price, the value of one hundred and fifty tons of crude oil is equal to one hundred and ten thousand dollars, and the one hundred and one thousand dollars can only be exchanged for 6,000 bases. Funding is equivalent to a little more for every eighteen dollars in exchange for a little base capital.

And if compared with his previous arms sales, selling arms, 100,000 base funds, you can get 3.2 million US dollars.And now, by replacing the oil worth 110,000 U.S. dollars with 6,000 base funds, and then using these 6,000 base funds to produce arms to sell, you can get 200,000 U.S. dollars in income.

In other words, after such a change of hands, the same 150 tons of crude oil can earn an extra 90,000 US dollars.

Of course, this is only possible when the base exists.And now Li Lan sells arms in Somalia. The entire market is that big. Once a large amount of arms is flooded in, the price of arms will fall a lot. At that time, I am afraid that there will be not much profit.

Therefore, it seems that you can make more money once you handle it, but in the current situation, there is not much room for such use.Unless in the future, Li Lan's arms business can enter the international market.

Tap the screen to use advanced tools Tip: You can use left and right keyboard keys to browse between chapters.

You'll Also Like