The Engineering Boss

Chapter 95: Work overtime

   On January 3, the weather turned cloudy and the rescue project officially started today.

   As a temporary shelter was to be built yesterday, Chen Yang and others were busy until after nine o'clock in the evening.

The temporary shelter is all built with steel pipes, and the place where everyone sleeps is also built with steel pipes. They are fixed side by side with two six-meter-long steel pipes with a width of about 1.8 meters. They are about 60 to 70 cm high from the ground and are next to each other. Thick template, anyway, the space for each person to sleep is the size of a template.

The outside is wrapped in rain and shade cloth. A total of three big houses and one small house are built. Each of the big houses can sleep ten people. The small house is reserved for people who cook. It is on the far left. The kitchen is built on an open field outside.

  Chen Yang Forget it, the cost of building such a simple temporary residence cost almost 10,000 yuan, not including the things in the kitchen.

   By the way, when the temporary residence was built yesterday, the last excavator finally pulled closer to the landslide site, so far all three excavators have been in place.

   Even if my sister’s New Year's holiday is over at noon today, since the rescue project officially started today, Chen Yang must personally direct the scene, so he could not send his sister to the First High School.

   Before seven o'clock in the morning, Chen Yang drove to the rescue site alone. As the cooks were to arrive later, Chen Yang bought a breakfast for everyone on the way to take it with them.

   When Chen Yang came to the rescue construction site, it was only after 8 o'clock in the morning, and it was close to 9 o'clock after everyone had breakfast.

  The landslide section is about 100 meters long. The entire road is buried by the landslide mud and sand, and most of it even slides under the road, making it difficult for people to pass normally.

Chen Yang immediately arranged for an excavator to open an excavator road ahead to eliminate the dangerous and easy to slide again, and then the second excavator drove forward a little bit to dig the sand and soil to the third one. The last excavator is used to load the truck.

   Four four-axle vehicles lined up to be loaded. Two of the four-axle vehicles have not yet arrived, but this does not affect the construction. At present, four four-axle vehicles are enough. After all, the construction site has not been expanded.

   The loader was arranged to wait at the location of the spoil site, and depending on the situation, the loading opportunity would be in a state of rest for a while. At least it would have to wait for the four-axle vehicle to fall more than a dozen vehicles before the loader could do the work.

   The progress at the beginning was slow. It took an average of 13 to 4 minutes for the excavators to install a truck of sand and soil. The first two excavators were also carefully cleaning up the landslide. After all, safety was the most important thing.

For everyone’s safety, Chen Yang specially arranged for a junior worker to go to the top to watch. Once any special situation or accident occurred, immediately notify the personnel below to evacuate, and the remaining junior worker was arranged to remember the earth. Number of cars.

   Zhou Xinjin came to the construction site at about ten o'clock, and saw that after the construction site started, he briefly said a few words to Chen Yang, then took a few photos and left.

  While Zhou Xinjin didn't leave for a while, the aunt who was cooking the rice contacted by the fourth bridge car master arrived. Since the other party got off at the closed road in front, Chen Yang had to drive to pick her up.

   Thinking that the junior workers bought some rice and noodles yesterday, they didn't buy anything at all. After receiving the cook, Chen Yang took him to the nearest town to buy vegetables.

   Chen Yang, who was shopping for vegetables on the street, did not dare to delay too much time. It only took about half an hour to buy a lot of vegetables, and then went straight to the makeshift residence to let her aunt cook.

   "How many cars did you pull in total?" Chen Yang asked the junior workers who recorded the number of cars.

   "Boss, the first four four-axle vehicles pulled an average of three times, and the two four-axle vehicles that came after each pulled one time, a total of fifteen times." The junior worker replied.

   After 11 o'clock in the morning, I pulled the dirt 15 times out. It must be less than 30 times before 12 o'clock. This speed is not good at all.

   "You have to record the exact number of their master's car. Is it right that you and them are a pair? This is a bit of a mistake in the future." Chen Yang asked the junior workers.

   "I see, boss!"

   Chen Yang came to the place where the soil was loaded and took a look, not to mention that he had advanced three or four meters, and when he looked up at the location of the landslide, mud and sand slipped down every moment.

   As long as it does not slide down a large area of ​​silt, then there is not much danger. If it slides down piece by piece, then it must be evacuated as soon as possible.

   Once it slides down piece by piece, it can’t run away, it can only be buried underneath.

   A few minutes after 12 noon, Chen Yang asked everyone to rest, because the aunt who was cooking had already called him and said that he could eat.

   After dinner, everyone rested in the temporary residence until about two o'clock. Chen Yang arranged for everyone to continue to work. Now that time is tight, we can’t give everyone extra rest time.

   Even Chen Yang plans to work overtime at night~www.ltnovel.com~ and strive to pull all the soil from the landslide within four or five days, and then proceed to the next step.

   The speed of pulling the soil in the afternoon was a little bit faster. Each four-axle vehicle pulled about ten times, but when I saw where there was still such a landslide, I felt that there was not much soil pulled away.

   But as a whole, the road was cleared for a distance of seven or eight meters, and the mountain seems to be very stable, and there will be no secondary landslides.

   At about five o'clock in the afternoon, a four-axle vehicle broke the tooth box when it dumped the soil. As a result, only five of the six four-axle vehicles were pulling the soil.

   However, this does not have a great impact on the construction progress. One excavator can't fit five four-axle vehicles, so Chen Yang didn't say anything about a broken one, just asking him to repair it as soon as possible.

   "Brother Chen, what time is it going to do this afternoon?" Hu Xiaojun jumped out of the car while lining up to load soil and asked Chen Yang.

   "Get off work until seven!" Chen Yang said, "I plan to continue to work at eight after the meal, and work overtime to try to pull the landslide soil out as soon as possible."

   "Do you want to do it at night?" Hu Xiaojun said, "I have no problem anyway. I go out to make money. But other drivers don't know whether to do it at night. Why don't you wait for me to ask them."

"Yes! In fact, the sight line is not good in all aspects at night. It is not necessary to put all the machinery on. Only one excavator and three four-axle trucks are enough. All the soil in the safe landslide area is loaded away. The unsafe area will be tomorrow. During the day, we are dealing with it, and the rest can rest," Chen Yang said.

   "Brother Chen's idea is okay. I think this landslide section is not very stable, and it slides down from the top of the excavation. Fortunately, it is only slippery sand. If there are big rocks, it will suffer."

  