Chapter 154 Factory Construction Plan!!!

Old Fan, whose real name is Fan Xingguo’.

A name with great characteristics of the times.

This is Wang Xiaonian’s most powerful technical assistance so far.

Of course, it is definitely not enough for the [Technology Department] to have Lao Fan, and more talents need to be recruited.

The matter of applying for a patent, Wang Xiaonian can safely hand it over to Lao Fan to do.

Then what Wang Xiaonian needs to do next is to build a factory.

Industrial land and residential land are two different things, the cost of industrial land is very low, after all, after the construction of the factory, can provide a large number of jobs, for such enterprises, the main government is not only very welcome, but also give some help.

Although Wang Xiaonian currently has more than 1.2 million yuan in cash, he still has to save some money to introduce the mechanical equipment of the assembly line in the future.

When the leaders of the main government learned that Wang Xiaonian was going to open a factory and an electronics factory with a large number of employees, he directly introduced him to a factory that had closed down.

This is a steel structure workshop.

The office area is on the second floor of the factory building.

On the first floor is the production workshop.

Not only is there no production equipment in the factory, but there are not a single table or chair in the office.

To put it bluntly, it is an empty shell factory.

The area of the plant covers an area of 2 acres.

The area of the warehouse covers an area of 1 acre.

But the whole plant has 10 acres of land.

The remaining 7 acres of land, about 4,700 square meters, are all empty.

The price of the land is 1000 yuan / mu.

10 acres of land, that is, 10,000 yuan.

The steel structure factory cost Wang Xiaonian 100,000 yuan.

It cost Wang Xiaonian a total of 110,000 yuan.

Of course, there are many places to spend money.

Tables, chairs, air conditioning and a range of office supplies are expected to cost $50,000.

As for Wang Xiaonian, who has the [Apocalypse Inheritance], he can also build a desk and the like by himself, but Wang Xiaonian still chooses to purchase.

Next, I want to put my energy into the ‘design pipeline’.

For the manufacturing industry, the assembly line is its blood.

The more scientific the assembly line, both the output and the quality can be fully guaranteed.

At present, there are not many original manufacturers of equipment in China, and there are also serious technical defects.

To this end, Wang Xiaonian plans to personally handle this assembly line with Lao Fan.

In the early stage, due to the problem of funds and firemen, Wang Xiaonian planned to build 2 assembly lines.

The estimated cost is about 100,000 yuan.

In addition, for the remaining 7 acres of vacant land, Wang Xiaonian also plans to carry out some transformation.

The renovation plan is: take out 1 acre of land and build a building.

The first floor is the company cafeteria.

The 2nd floor is the staff activity center, such as gymnasium, billiards room, and the KTV 3rd floor is the company dormitory.

Take out another acre of land and build a [swimming pool].

As for other basic buildings, ‘basketball courts,’ mini football fields, etc., these can be put aside and then done when you make money.

Following.

Wang Xiaonian took leave again.

Recently, Wang Xiaonian has often taken leave, very frequently, which makes the head teacher Lao Liu very worried.

Although Lao Liu approved, he did not forget to personally call Wang Xiaonian and say that the college entrance examination is very important, but his body is more important, so let Wang Xiaonian not stay up late.

All right!

The head teacher Lao Liu thought that Wang Xiaonian had stayed up late and burned his body, otherwise, how could he feel so much weight recently.

In the face of the head teacher’s misunderstanding, Wang Xiaonian did not explain much.

Money matters!

Wang Xiaonian wants to become the first person in the world to eat [Universal Charge] crab, and the time is not waiting.

The purpose of Wang Xiaonian’s leave today is to find a construction team and first transform his factory.

Get your own gym, swimming pool and staff canteen.

The construction team, Wang Xiaonian also has acquaintances.

“Manager Zhao, hello.”

Wang Xiaonian called Manager Zhao, who worked for Li Jufu in Sichuan and Chongqing.

This manager Zhao is responsible for establishing a high-end community in Sichuan and Chongqing, this ability to make a gym, swimming pool is definitely not a problem.

Manager Zhao, who was pitted by Wang Xiaonian for more than 120,000, also looked incredible when he received the call.

I couldn’t help but secretly said in my heart: “I have never seen such a brazen person, who plagued our company’s money, and now he even wants me to help him.” ”

Manager Zhao was disgusted, but he really helped Wang Xiaonian contact a construction team.

“Thank you, Manager Zhao.”

“I’ll have coffee another day.”

Wang Xiaonian said with a smile.

“Good.”

Manager Zhao on the other end of the phone answered with a smile and hung up the phone.

The generous Wang Xiaonian was not angry, but called the construction team.

The people of the construction team learned that Wang Xiaonian was introduced by the Li family of Xiangjiang, and their attitude was very respectful, and the quotation given was also Tong Suo.

“Mr. Wang, you are really an entrepreneur with a conscience.”

After signing the agreement, the person in charge of the construction team couldn’t help but sigh.

This is not a horse fart to pat Wang Xiaonian, but a sincere praise.

In Sichuan and Chongqing, no, even in the entire Xia Kingdom, there has never been a 1-acre factory that will build [swimming pools]: [gyms] and [KTV] for employees.

Being able to attach so much importance to the lives of employees, Wang Xiaonian is indeed the only one!!!



Tap the screen to use advanced tools Tip: You can use left and right keyboard keys to browse between chapters.

You'll Also Like