The black tech madman who saves the world

Chapter 238 Mars base completed!

Chapter 238 Mars base completed!

A few days later, the artificial intelligence Yueer on the Tissot selected more than 100 suitable main base locations from the currently detected Mars data terrain panel.

Chen Mengchuan and others conducted detailed exchanges and discussions on more than 100 suitable main base locations, and finally selected a medium-sized crater located in the equatorial zone of Mars with a diameter of about 9.41 kilometers and a core area depth of about 0.832 kilometers!Chen Mengchuan and others named it "Luoyu" crater.

This medium-sized crater is located in a relatively tortuous area in the Martian equatorial belt. There are many Martian mountains around it. The overall altitude area is relatively high, and the crater is surrounded by mountains. In such an area, the Martian dust storm is less powerful. Like the plains of Mars, once there is a regular dust storm, it will cover the sky and block out the sun, and the momentum is huge.

After the selection of the final base landing point, the Tissot headed towards the "Luoyu" crater. Soon after arriving at Luoyu, the spacecraft flew and hung inside the crater area, and quickly opened the cabin for landing.

The landing of the Tissot was not a real landing, but suspended at a distance of about 40 centimeters from the surface.

Afterwards, a large number of exploration trips of multi-armed crabs were quickly released to carry out further observation and exploration work on the crater. Although the "Luoyu" crater has been selected, the area of ​​the crater is not small, and it is necessary to Find the most suitable area among them for further preparation.

In a few hours, the multi-armed crabs completed the exploration of the entire crater, and the newly imaged structure map of the crater has a clearer data report.

A group of staff responsible for the construction of the base quickly began to analyze the structure diagram of the crater, and quickly came up with an equilateral hexagonal area located in the southeast area of ​​the crater center that is most suitable for the base. .

Then the multi-armed crabs quickly started a new job, drilling and digging holes, and stationed in the foundation.There are 6 in the periphery, 6 in the central area, and 1 in the core area, with a total of 13 foundation core holes.

The drilling speed of the multi-armed crabs is very fast. It took almost ten minutes to complete all the drilling and foundation embedding of all 13 core base pillars.

Then, with hundreds of uniformly loaded gravity presses, the entire base area was repeatedly compacted, and finally the flatness was repeatedly adjusted, and the laying of the base floor began several hours later.

Through the data stream and video screen information, Chen Mengchuan only watched the work of the multi-armed crab a few times, and no longer cared about the construction of the base. Because of the existence of the gravitational multi-armed crab, these tasks are not difficult at all, just like building blocks , The ready-made on-site things are fully automatic installation and construction.

In less than half a day, a huge hexagonal metal floor with a side length of 1200 meters and an area of ​​more than 374 million square meters was quickly laid. Low and high surface temperatures.

Then the multi-armed crab cooperated with a large number of gravitational bee swarms, and soon began to carry out the work of surrounding and capping based on 13 ultra-long dense steel foundation pillars. After 4 days of work, all the sealing work was completed on the huge main base of a complex structure, and a large number of dense graphene solar heat-absorbing photovoltaic panels were made into inverted structures and spread all over the top cover of the base.

After the basic construction of the base was completed, more gravitational multi-armed crabs began to invest in the internal construction work.

First of all, a large amount of Martian soil was collected outside for testing, and a large number of component tests and analyzes were carried out at the same time. In the next base work, these Martian soils will be used for plant cultivation. This will be an important task. Long-term continuous work.

In the future, all the oxygen supply inside the entire base will rely on the photosynthesis of a large number of plants to realize and complete it.

All the design work was completed in advance, the uneven structure of 40 floors, each structure is 10 meters high, and there are uniform green plant areas, and the soil that passed the component test was quickly covered on the plant areas. After more than ten hours, the soil layers of all plant areas have been covered with uneven heights and large areas. After a period of time, the vegetation will be implanted.

Nearly a hundred multi-layer sealed cabins of various sizes and specifications were also completed in the next few days.

After all the airtight chambers were completed, the biocirculation department started to modify the air in the main base one after another. After releasing air from a large number of compressed air tanks and continuous testing, the air composition of the air in the main base that had completed the sealing work was already very close to earth environment.

After completing the final radiation and magnetic field tests, the main base finally completed the basic conditions for human survival.

Afterwards, the entire base began to adjust its gravity. Under the multi-directional composite control of a large number of gravity nodes, the gravity of the entire base was basically equal to the gravity of the earth.

After this step, the Tissot began to supply water to the base, and the photovoltaic power station officially started construction, and the entire base was brightened up in an instant!

"Anyone plan to go to Mars together?"

"Brother Chuan! Go, go!"

"Brother Chuan! You must go!"

"Count me in!"

"And I……"

Chen Mengchuan's voice was directed at the entire Tissot, and even the people in the main control room became excited, and they all wanted to be the first batch of Mars landers. This is undoubtedly the first time humans have landed on Mars!
Seeing everyone cheering so happily, Chen Mengchuan laughed: "Yue'er, release all manual operations on the Tissot, and fully activate the automatic control system. Prepare to dock with the main base."

"Okay, father." Yue'er, the artificial intelligence of the Tissot, replied immediately.

Then on the Tissot, a huge pipeline slowly stretched out, and soon it was connected to a special airtight hatch of the Mars main base. The members of the Tissot, who had been looking forward to it for a long time, left Tissot one by one through the huge pipeline elevator No. [-], appeared on the huge Mars base that is still under construction...

As the first group of people to arrive at the Mars base, Chen Mengchuan took a small group of people on a small gravitational platform and toured around the base.

After the pipeline delivered the last few scientific researchers, it immediately entered the cargo mode, and the multi-armed crabs began to transport the plants, food, experimental equipment and other materials on the Tissot to the Mars base on a large scale.

In this way, thousands of human beings from the earth became Martian guests who had been desolate for an unknown number of years. Everyone, including Chen Mengchuan, became the first batch of exploration conquerors to land on Mars in human history!
(End of this chapter)

Tap the screen to use advanced tools Tip: You can use left and right keyboard keys to browse between chapters.

You'll Also Like