In Wasteland Survival I have a Dyson Sphere

Chapter 35 Powerful Arc Furnace

Now in the entire smelting area, only the top and the top two meters of the surrounding walls have not yet hardened.

But now that the bottom ten meters and the bottom have been hardened, there will be no problems.

Next, Lin Yu did not immediately excavate the remaining three meters, but dug down the ground to a height of 1.5 meters.

In this way, you only need to dig out the top 1.5 meters to reach the standard!

At this time, the overall height difference from the warehouse to the smelting area is 3.5 meters.

And this distance is also the suspended height that Lin Yu plans to dig.

After reserving one meter of thickness at the bottom of the warehouse, the 2.5 meters below will serve as the future material storage warehouse.

One hundred square meters in size is enough to store some basic materials.

After this planning, before the new ion source was manufactured, Lin Yu controlled the ion crusher to start a new operation and process the bottom of the warehouse.

As the crushing proceeds, a lot of gravel is produced.

Lin Yu ignored it for the time being. After the bottom processing was completed, it turned into a material storage area with two channels and three rows of shelves!

Seeing his masterpiece, Lin Yu nodded with satisfaction,

Returning to the manufacturing room, after seeing that the third batch of ion sources was completed, Lin Yu put them away, took four out to the smelting area, and shot them directly at the top of the room with the hardening gun.

Lin Yu directly hit four of the huge 400-square-meter area.

Then prepare eight ion sources again and strengthen the tops of the four walls!

As the hardening gradually proceeds, Lin Yu does not have to worry about the risk of another collapse in this space.

Returning to the manufacturing room, he took out the metal materials and selected the manufacturing option of the support column. After selecting a height of 15 meters, Lin Yu came to open the manufacturing room and began to clean up the construction waste generated by the previous work!

After transporting all the soil to a corner of the planting room and stacking it, Lin Yu placed all the hardened and broken construction waste in a corner of the smelting area.

These are all good things for making glass or silicon materials later!

After all the cleaning was completed, Lin Yu came to the manufacturing room and saw the support columns that had been manufactured.

After taking it out and carrying it to the smelting area, stand it in the center of the room and start the device directly.

As the column unfolds section by section, it reaches the top directly, and then with the strong support force, the top is firmly held up!

Now, you don’t have to worry about the top collapsing!

Seeing that everything was ready, Lin Yu knew that the furnace could be placed next!

Go back and get the nano-egg and put it in the innermost corner!

Before starting, Lin Yu also looked at the expanded area and found that an area of ​​6*6 was needed, which was 36 square meters.

The entire smelting area is 400 square meters in size. Excluding roads and material storage areas, Lin Yu can place a total of six furnaces in the entire smelting area.

So next, Lin Yu plans to fill the entire smelting area with the planned furnace!

While waiting, the furnace gradually takes shape,

When the furnace took shape, Lin Yu immediately stepped forward to check the details!

This furnace, like the previous basic manufacturing platform, has a three-dimensional projection.

After Lin Yu opened the parameter description, he immediately saw the specific parameters of this furnace.

From the data, Lin Yu can see that the entire furnace has three functions: smelting, purifying and producing crystals, just like the introduction!

And these three functions are exactly the three functions that Lin Yu needs most!

The smelting function, the most basic function of the arc furnace, can not only use ore to refine metal materials, but also use various finished metals to smelt materials with more powerful performance!

Purification is easy to understand. Various scrap metals can be purified into elemental metal blocks.

And it still maintains a one-to-one ratio of purification, which is far more powerful than the temporary recovery device Lin Yu made before.

However, there is also a disadvantage, that is, after using the electrode arc as a smelting tool, ordinary fiber materials cannot withstand such high temperatures and will be vaporized directly.

Not even some low-quality plastics can withstand it!

So generally speaking, the furnace or purification objects of the furnace are all metal materials.

Naturally, there are special equipment to process these plastics.

Lin Yu also knows what kind of equipment it is, it is a micro chemical plant!

Although the output of this kind of integrated factory is not as large as that of a large chemical factory covering an area of ​​hundreds of acres,

But for personal use, it is enough.

Moreover, this kind of automated factory only needs to provide enough power and materials, and after setting the output, ignore it and wait quietly for a period of time before everything is produced for you!

As for the final crystal production function, it is to produce crystals with various properties.

Nowadays, in modern civilized society, many high-precision instruments have various micro crystals.

In particular, pure diamond is widely used as the material that refracts various light sources.

Moreover, today’s artificial diamond technology is relatively mature.

So this is just the most basic crystal.

After reading these three functions, Lin Yu knew that the next development would be much easier for him. Find Shuyuan www.zhaoshuyuan. com

Turning off the three-dimensional projection, Lin Yu began to calculate the power consumption of the power grid.

Today, the total power generation power of the entire shelter’s power grid is 330 kilowatts.

The power of a furnace is 360 kilowatts.

This is far from enough for today’s power grid.

After being able to manufacture silicon panels, Lin Yu can also manufacture solar panels. The power of a solar panel is 360 kilowatts.

Under normal conditions, one solar panel can meet the needs of an arc furnace for full power operation.

But today's nuclear dust is blocked, and the power generation is far from enough. If we have this time, it is more cost-effective to build two wind turbines!

In this regard, Lin Yu calculated that if six furnaces are placed, each furnace will require 2,160 kilowatts of energy from the power grid.

If the power of a wind turbine is 300 kilowatts, at least eight wind turbines are needed to meet the requirements.

But in addition to these, there is also the 300 kilowatts of the basic manufacturing station, and the other equipment and facilities inside the shelter together have almost 40 kilowatts of power.

In this way, Lin Yu needs at least nine wind turbines to meet the requirements.

Don’t worry about excess electricity. The power induction tower itself is a very good power storage device. The capacity of a power induction tower is 100,000 kilowatts. In a short time, one power induction tower is enough for your own use!

After knowing what needed to be done next, Lin Yu knew that he needed to use a furnace to resmelt the iron blocks, only with a batch of magnets!

With the electric arc furnace, the manufacturing of many metal derivative materials is no longer a problem.

That's why Lin Yu said that the next development will be much easier!

Tap the screen to use advanced tools Tip: You can use left and right keyboard keys to browse between chapters.

You'll Also Like