......
After spending 500 return points, Lin Cheng still has 1100 return points.
After his survival points exceeded 1000 points.
There has been a change in the presentation of weapons centers.
At the same time, the status of the monitoring center and the robot manufacturing center has also changed from unknown to introduction.
[Weapon - gun production line: can produce 20 pistols per day, or 5 rifles, or 2 light machine guns, or 1 heavy machine gun! ] 】
[Next level: 100 pistols, or 25 rifles, or 10 light machine guns, or 5 heavy machine guns can be produced per day! ] 】
[Upgrade requirements: 1000 return points! ] 】
......
【Monitoring Center: Not activated! 】
[Activation conditions: 2000 return points! ] 】
[Activation function: All-round monitoring of all contents of the shelter within a radius of 200 meters! ] 】
......
【Robot Manufacturing Center: Not activated! 】
【Activation condition: 1000 return points】
[Activation function: 20 primary robots can be manufactured per day].
But the medical center, the research and development center, is still the same as before.
Only the name, no introduction.
Lin Cheng guessed that it was very likely that these centers needed to consume a large number of return points.
Only when your own return point reaches a certain value.
to be able to see the introduction.
At present, your own 1000 return points is not enough.
"There are still 1100 return points..."
Lin Cheng pondered for a moment and immediately made up his mind.
"System, robot manufacturing center!"
[Okay, host, robot manufacturing center active...].
[The robot manufacturing center is activated successfully, consuming 1000 return points, and the remaining 100 return points].
[During the operation of the robot manufacturing center, the double production card is in effect, and 40 infrastructure robots can be produced per day].
......
After two returns, Lin Cheng already has 110 junior infrastructure robots.
And at a rate of 40 per day, it continues to grow.
Converted into human labor.
That's the same as hundreds of people working at the same time every day.
At the moment, 110 infrastructure robots are on standby outside the shelter.
At their side, 10 heavy excavators.
These excavators are huge, and one is comparable to a house.
The bucket of each excavator reaches 50 cubic meters.
In addition, on the north and south sides of the industrial park, near the fence.
Two huge machines of more than 100 meters were parked respectively.
This is the shredder returned by the system.
According to the system introduction.
These two pulverizers can grind a variety of stone, soil and building materials into powder.
Concrete with this powder added, both hardness and corrosion resistance, is more than 5 times that of no powder added.
Moreover, it can speed up the time of concrete to set soil by a full two times.
......
As for the hundred steel-making knife, it seems to be quite powerful when it sounds like the name.
He planned to take it out again tomorrow morning.
Now he wants to make a plan for the renovation of the park.
Upgrades to shelters, return points are needed everywhere.
In a short period of time, the area of the shelter cannot be expanded much.
But there are also a lot of supplies to store.
Therefore, Lin Cheng must transform the park into his doomsday base as soon as possible.
The announcement of the outbreak of the apocalypse will cause a large-scale rush of materials.
With a large amount of materials, he will definitely become the target of many people.
Before the end times, it is good to have an orderly constraint.
But once the social order collapses, countless survivors, in order to compete for materials, will definitely use all kinds of methods!
Although Lin Cheng has powerful force, it is also a big trouble to face thousands, or even hundreds of thousands, of survivors who have gone crazy.
He was able to hide in the shelter, but the supplies outside were for others.
Therefore, he must strengthen the entire industrial park and make it his doomsday base.
After the outbreak of the apocalypse, form your own doomsday legion and expand abroad, and you also have a foundation!
"The first step was to tear down the original wall and re-establish a reinforced concrete wall that was thickened and reinforced."
"The second step is to demolish all the buildings in the entire industrial park."
"The third step is to dig 5 meters under the entire industrial park, pour all the concrete, and form a single part with the wall."
"The fourth step is to divide the functions of the entire industrial park."
Lin Cheng wrote faster and faster on the book.
After listing these four steps, a lot of details have been perfected.
It took more than two hours for Lin Cheng to complete the transformation plan for the industrial park.
Stretching, Lin Cheng lay on the bed a little tiredly.
"Sleep, get up tomorrow morning and arrange it."
......
Early the next morning, after Lin Cheng washed, he immediately arranged the task of transforming the industrial park.
At this moment, 110 infrastructure robots, lined up in 10 rows, stood in front of him.
"Based on numbering, every 10 is a squad, and the smallest number is the squad leader."
"No. 1, you are the general person in charge of the entire infrastructure robot!"
The No. 1 infrastructure robot stood up and stood upright: "Yes!" "
Lin Cheng continued to arrange:
"Team 12, responsible for tearing down the wall of the industrial park and digging a deep trench 10 meters deep and 2 meters wide along the location of the wall!"
"Squad 345, responsible for demolishing all the buildings in the industrial park!"
"Team 678, responsible for digging deep into the ground of the industrial park, digging 5 meters down as a whole!"
"Squad 9, responsible for putting all the construction waste into the shredder!"
"Team 10, responsible for receiving and sorting out supplies!"
"Get to work now!"
"Yes, master!"
Infrastructure robots are built based on human characteristics.
They also have the same organs and skin as humans.
From the outside, it's completely intelligible that they're a bunch of robots.
The efficiency of infrastructure robots is very fast.
They worked in an orderly manner.
Start the generator and pour barrels of diesel fuel into the generator.
With a roar of engines, 10 generators started at the same time.
After the pulverizer is connected to the generator.
Immediately started running.
It can be said that the appearance of the crusher can be said to have helped Lin Cheng a lot.
The entire industrial park, millions of square meters of construction waste, is a sky-high unit.
If there is no crusher, I am afraid that the end will come, and this garbage will not be completely disposed of.
But now with the crusher, the efficiency can be increased dozens of times.
Infrastructure robots are amazingly powerful, their own materials are hard, and they are very violent in demolishing buildings.
Therefore, the speed of demolition is also very fast.
It only takes a few minutes to demolish a building.
And these construction wastes, after being put into the pulverizer, will also turn into powder in just a few minutes.
According to Lin Cheng's estimates, in less than a day, the entire industrial park can complete the demolition work.
Dragon Boat reading discount! Charge 100 and get 500 VIP bonds!
immediately preemptive(Event Period: June 22 to June 24)
After spending 500 return points, Lin Cheng still has 1100 return points.
After his survival points exceeded 1000 points.
There has been a change in the presentation of weapons centers.
At the same time, the status of the monitoring center and the robot manufacturing center has also changed from unknown to introduction.
[Weapon - gun production line: can produce 20 pistols per day, or 5 rifles, or 2 light machine guns, or 1 heavy machine gun! ] 】
[Next level: 100 pistols, or 25 rifles, or 10 light machine guns, or 5 heavy machine guns can be produced per day! ] 】
[Upgrade requirements: 1000 return points! ] 】
......
【Monitoring Center: Not activated! 】
[Activation conditions: 2000 return points! ] 】
[Activation function: All-round monitoring of all contents of the shelter within a radius of 200 meters! ] 】
......
【Robot Manufacturing Center: Not activated! 】
【Activation condition: 1000 return points】
[Activation function: 20 primary robots can be manufactured per day].
But the medical center, the research and development center, is still the same as before.
Only the name, no introduction.
Lin Cheng guessed that it was very likely that these centers needed to consume a large number of return points.
Only when your own return point reaches a certain value.
to be able to see the introduction.
At present, your own 1000 return points is not enough.
"There are still 1100 return points..."
Lin Cheng pondered for a moment and immediately made up his mind.
"System, robot manufacturing center!"
[Okay, host, robot manufacturing center active...].
[The robot manufacturing center is activated successfully, consuming 1000 return points, and the remaining 100 return points].
[During the operation of the robot manufacturing center, the double production card is in effect, and 40 infrastructure robots can be produced per day].
......
After two returns, Lin Cheng already has 110 junior infrastructure robots.
And at a rate of 40 per day, it continues to grow.
Converted into human labor.
That's the same as hundreds of people working at the same time every day.
At the moment, 110 infrastructure robots are on standby outside the shelter.
At their side, 10 heavy excavators.
These excavators are huge, and one is comparable to a house.
The bucket of each excavator reaches 50 cubic meters.
In addition, on the north and south sides of the industrial park, near the fence.
Two huge machines of more than 100 meters were parked respectively.
This is the shredder returned by the system.
According to the system introduction.
These two pulverizers can grind a variety of stone, soil and building materials into powder.
Concrete with this powder added, both hardness and corrosion resistance, is more than 5 times that of no powder added.
Moreover, it can speed up the time of concrete to set soil by a full two times.
......
As for the hundred steel-making knife, it seems to be quite powerful when it sounds like the name.
He planned to take it out again tomorrow morning.
Now he wants to make a plan for the renovation of the park.
Upgrades to shelters, return points are needed everywhere.
In a short period of time, the area of the shelter cannot be expanded much.
But there are also a lot of supplies to store.
Therefore, Lin Cheng must transform the park into his doomsday base as soon as possible.
The announcement of the outbreak of the apocalypse will cause a large-scale rush of materials.
With a large amount of materials, he will definitely become the target of many people.
Before the end times, it is good to have an orderly constraint.
But once the social order collapses, countless survivors, in order to compete for materials, will definitely use all kinds of methods!
Although Lin Cheng has powerful force, it is also a big trouble to face thousands, or even hundreds of thousands, of survivors who have gone crazy.
He was able to hide in the shelter, but the supplies outside were for others.
Therefore, he must strengthen the entire industrial park and make it his doomsday base.
After the outbreak of the apocalypse, form your own doomsday legion and expand abroad, and you also have a foundation!
"The first step was to tear down the original wall and re-establish a reinforced concrete wall that was thickened and reinforced."
"The second step is to demolish all the buildings in the entire industrial park."
"The third step is to dig 5 meters under the entire industrial park, pour all the concrete, and form a single part with the wall."
"The fourth step is to divide the functions of the entire industrial park."
Lin Cheng wrote faster and faster on the book.
After listing these four steps, a lot of details have been perfected.
It took more than two hours for Lin Cheng to complete the transformation plan for the industrial park.
Stretching, Lin Cheng lay on the bed a little tiredly.
"Sleep, get up tomorrow morning and arrange it."
......
Early the next morning, after Lin Cheng washed, he immediately arranged the task of transforming the industrial park.
At this moment, 110 infrastructure robots, lined up in 10 rows, stood in front of him.
"Based on numbering, every 10 is a squad, and the smallest number is the squad leader."
"No. 1, you are the general person in charge of the entire infrastructure robot!"
The No. 1 infrastructure robot stood up and stood upright: "Yes!" "
Lin Cheng continued to arrange:
"Team 12, responsible for tearing down the wall of the industrial park and digging a deep trench 10 meters deep and 2 meters wide along the location of the wall!"
"Squad 345, responsible for demolishing all the buildings in the industrial park!"
"Team 678, responsible for digging deep into the ground of the industrial park, digging 5 meters down as a whole!"
"Squad 9, responsible for putting all the construction waste into the shredder!"
"Team 10, responsible for receiving and sorting out supplies!"
"Get to work now!"
"Yes, master!"
Infrastructure robots are built based on human characteristics.
They also have the same organs and skin as humans.
From the outside, it's completely intelligible that they're a bunch of robots.
The efficiency of infrastructure robots is very fast.
They worked in an orderly manner.
Start the generator and pour barrels of diesel fuel into the generator.
With a roar of engines, 10 generators started at the same time.
After the pulverizer is connected to the generator.
Immediately started running.
It can be said that the appearance of the crusher can be said to have helped Lin Cheng a lot.
The entire industrial park, millions of square meters of construction waste, is a sky-high unit.
If there is no crusher, I am afraid that the end will come, and this garbage will not be completely disposed of.
But now with the crusher, the efficiency can be increased dozens of times.
Infrastructure robots are amazingly powerful, their own materials are hard, and they are very violent in demolishing buildings.
Therefore, the speed of demolition is also very fast.
It only takes a few minutes to demolish a building.
And these construction wastes, after being put into the pulverizer, will also turn into powder in just a few minutes.
According to Lin Cheng's estimates, in less than a day, the entire industrial park can complete the demolition work.
Dragon Boat reading discount! Charge 100 and get 500 VIP bonds!
immediately preemptive(Event Period: June 22 to June 24)
You'll Also Like
-
The Path to Immortality
Chapter 486 54 minute ago -
Super Extraction
Chapter 343 1 hours ago -
Doomsday Game: Awakening SSS-level Anti-Armor at the Beginning
Chapter 412 2 hours ago -
Everyone: Summoners are weak? Awaken the Golden Spatula System at the beginning!
Chapter 764 2 hours ago -
Phoenix Grand Lord
Chapter 334 2 hours ago -
Daily synopsis: My superpowers are updated every season
Chapter 324 2 hours ago -
I can extract health points
Chapter 165 2 hours ago -
I regret investing in Lu Bu
Chapter 52 2 hours ago -
Doomsday Game.
Chapter 907 13 hours ago -
From becoming a Pokémon to endless reincarnation
Chapter 282 13 hours ago