......

100 infrastructure robots are responsible for renovation in the industrial park.

Another 10 are responsible for receiving supplies.

The overall operation does not need Lin Cheng to worry about.

The reliability of these robots is more than a hundred times higher than that of humans.

After explaining, Lin Cheng directly found Manager Qin.

Seeing Lin Cheng, Manager Qin was as excited as licking a dog to see the goddess, shushing and asking for warmth.

Lin Cheng didn't say nonsense, and spoke, "President Qin..."

Manager Qin was flattered and hurriedly said, "You can just call me Xiao Qin." "

"Xiao Qin," you should know the relevant animal husbandry and planting companies when you purchase all kinds of meat and vegetables, right?" "

As soon as Manager Qin heard this, he immediately came to the spirit.

Mr. Lin, this is another batch of goods.

How else would you ask this?

"Yes, Mr. Lin, do you still want to buy goods?"

Lin Cheng nodded: "I want all kinds of livestock and poultry breeding, cultivation, and slaughtering industries." "

"I bought the equipment, materials related to these three industries, as well as the livestock that is being farmed."

"The requirement is cleanliness and hygiene, and it must be able to continuously supply 1,000 people for half a year."

"All kinds of vegetables to be planted must be cultivated without soil, and the entire production line is required."

Without waiting for Mr. Qin to speak, Lin Cheng stretched out his left hand.

Spread five fingers.

"Five hundred million, I will take out five hundred million and buy these."

"Xiao Qin, if you can handle it well and be satisfied, I will give you 1 million hard work."

Manager Qin was short of breath.

He "soared" and stood up, his face very excited.

"Mr. Lin, don't worry, I will personally handle it for you!"

"I'm personally staring, whoever lacks you by one or two scales is against me Qin Tao!"

"Our company directly blocked him in the entire Jiangcheng!"

Lin Cheng glanced at Qin Tao with some surprise.

This kid, a supermarket manager, can't get into the first two tables of the annual meeting.

How can you brag?

Yes, it's a talent, maybe you can use it in the future.

"One more thing, I don't know if you can help."

"President Lin, although you say, I Xiao Qin, I am not blowing, in terms of connections, I haven't lost anyone."

Oh?

So powerful?

Lin Cheng said: "Do you know the company that does construction? "

The industrial park covers an area of one million square meters.

For reinforcement, the amount of reinforced concrete required is a huge amount.

A single family will definitely not be able to eat.

Unexpectedly, Qin Tao didn't even think about it, and replied directly: "Yes, how much do you want?" "

"The amount of work is very large, you know how much is called."

Qin Tao quickly agreed.

In front of Lin Cheng, he made more than ten calls in a row.

One moment Brother Wang, one moment Lao Liu, one moment Boss Zhou, one moment President Chen.

It sounded very familiar, and they rushed over immediately.

Lin Cheng was a little confused at this moment.

It's normal for you to know a supermarket manager and know a supplier.

But you even know the construction company, so it's a bit out of the ordinary.

......

Qin Tao does have some skills.

In less than an hour, the owners of more than a dozen construction companies came in person.

Qin Tao quickly introduced them, saying that Lin Cheng had bought an industrial park and had business to discuss.

When these bosses heard this, they were immediately taken aback, and they became respectful to Lin Cheng.

Almost at the same time, they all bent over a little.

They have been cultivating Jiangcheng for many years, and their worth is not low.

There are basically black and white backgrounds.

But in front of Lin Cheng, he was still very polite.

After all, this is a big boss who can buy an entire industrial park.

The land alone cost 1200000000000000000000000000000000000000000000000000

In front of this kind of big boss, their background looks so pale and weak.

The renovation of the million-square-meter industrial park is a rare big project for them.

"Hello Mr. Lin, I am Xu Guoqing of Oriental Architecture, you can just call me Xiao Xu..."

"Hello Mr. Lin, I am Zhou Hong of Tiangu Commercial Concrete, you can just call me Xiao Zhou..."

A group of bosses introduced themselves to Lin Cheng very attentively.

Lin Cheng nodded perfunctorily, and did not remember who was who.

After they finished their introduction, Lin Cheng spoke.

"The task this time is simple, but the amount of work is very large and the time is very tight."

"You are all people in the real estate industry, and you must know something about my industrial park."

"With an area of 2.36 million square meters, there are only two jobs that you need to do this time."

"One is to pour a complete wall out of concrete."

"The second is to re-surface the industrial park."

When these bosses heard this, their eyes lit up.

That's a big project!

More than two million square meters of ground requires at least hundreds of thousands of cubic meters of concrete.

Now the price of concrete is around 400 yuan.

This whole project has to be several hundred million!

No wonder Lin always called so many people.

This project, they alone is really not easy to eat.

"Mr. Lin, don't worry, our company has done this kind of project, and we promise to do it well for you!"

"Mr. Lin, I started with industrial land, and quality is our signboard!"

These bosses came to Lin Cheng one after another, introducing their own advantages.

Lin Cheng sat on the sofa, raised his hand, and pressed down.

These bosses immediately sat down like the kindergarten children, waiting for Lin Cheng to speak with a look of anticipation.

"The above is the content of the task, and the next thing I want to say is the task requirements."

"First, the total height of the wall is 15 meters, 5 meters underground, 10 meters above ground, 2 meters thick, and 1 meter thick on the ground."

"Second, all concrete must use ultra-high strength above the C80 level, the higher the grade, the better, and the best military products."

"Third, the overall watering, I have to complete it within 5 days, and I can't exceed it in a day."

At first, several bosses listened unimpressed.

It's not that they haven't done big projects.

Some communities are larger than this park.

However, the further back they listened, the wider their eyes became.

"A 15-meter-high, meter-thick wall?"

"1 meter thick ground?"

"Concrete above C80?"

"Completed in 5 days?"

Don't be too outrageous!

Dragon Boat reading discount! Charge 100 and get 500 VIP bonds!

immediately preemptive(Event Period: June 22 to June 24)

Tap the screen to use advanced tools Tip: You can use left and right keyboard keys to browse between chapters.

You'll Also Like